| Specification |
Surface Treatment: Anodizing;
Production Type: Mass Production;
Machining Method: CNC Machining;
Material: Aluminum;
Deep Process: Cold Drawing, CNC, Cutting, Sawing, Drilling, Mill;
MOQ: 300kgs;
Delivery Time: 10-15days;
Hardness: 50-300hb;
Finish Treatment: Anodizing/Powder Coated;
Payment Terms: 30%Tt Deposit,70%Balance Against Bl Copy;
Extruding Machine: 660-3000tons;
|
Application: Fastener, Auto and Motorcycle Accessory, Hardware Tool, Machinery Accessory;
Standard: GB, EN, JIS Code, TEMA, ASME;
Surface Treatment: Polishing;
Production Type: Batch Production;
Machining Method: CNC Machining;
Material: Nylon, Steel, Plastic, Brass, Alloy, Copper, Aluminum, Iron;
Tolerance: 0.01+/- 0.005mm (Custom Available);
Roughness: Ra0.2-Ra3.2 (Custom Available);
Available Drawings Format: STP, Step, Igs, Iges, X_T, Sat, Stl, Sld,Xm;
OEM/ODM: Professional OEM ODM Custom Metal Fabrication;
Quality Assurance: ISO9001:2015, SGS, CE;
Quality Control: 100% Inspection Before Shipment;
Type: Broaching, Drilling, Etching / Chemical Machining,;
Packing: EPE, Plastic Bag, Bubble Bag or Custom Package;
Product Type: Precision CNC Machining Parts;
Delivery Time: Sample Day: Within 7 Days; Mass Production : 15~45;
Material Capabilities: Aluminum, Brass, Stainless Steel,etc;
Finish: Anodized,Alodine,Plate,Power Painting,Polish,Ect;
Production Ability: 150000 Piece/Pieces Per Day;
Pricing Term: EXW, Fob CIF,Fca,DAP,DDP etc.;
Equipment: 3/4/5 Axis Center Machining/Milling/Lathe, CNC Tu;
|
Application: Fastener, Auto and Motorcycle Accessory, Hardware Tool, Machinery Accessory;
Standard: GB, EN, China GB Code, JIS Code, TEMA, ASME;
Surface Treatment: Anodizing;
Production Type: Mass Production;
Machining Method: CNC Milling;
Material: Nylon, Steel, Plastic, Brass, Alloy, Copper, Aluminum, Iron;
Roughness: Ra0.2-Ra3.2 (Custom Available);
Finish: Anodized,Alodine,Plate,Power Painting,Polish,Ect;
OEM/ODM: Professional OEM ODM Custom Metal Fabrication;
Quality Control: 100% Inspection Before Shipment;
Quality Assurance: ISO9001:2015, SGS, CE;
Available Drawings Format: STP, Step, Igs, Iges, X_T, Sat, Stl, Sld,Xml;
Equipment: 3/4/5 Axis Center Machining/Milling/Lathe;
Type: Broaching, Drilling, Etching / Chemical Machining,;
Material Capabilities: Aluminum, Brass, Steel, Titanium etc.;
Delivery Time: Sample 1-7 Day; Mass 2-4 Weeks;
Packing: EPE, Plastic Bag, Bubble Bag or Custom Package;
Product Type: Precision CNC Machining Parts;
Feature: High Performance;
Production Ability: 150000 Piece/Pieces Per Day;
Pricing Term: Roughness EXW, Foroughness CIF,Fca,DAP,DDP etc.;
|
Application: Fastener, Auto and Motorcycle Accessory, Hardware Tool, Machinery Accessory;
Standard: GB, EN, China GB Code, JIS Code, TEMA, ASME;
Surface Treatment: Anodizing;
Production Type: Mass Production;
Machining Method: CNC Milling;
Material: Nylon, Steel, Plastic, Brass, Alloy, Copper, Aluminum, Iron;
Roughness: Ra0.2-Ra3.2 (Custom Available);
Finish: Anodized,Alodine,Plate,Power Painting,Polish,Ect;
OEM/ODM: Professional OEM ODM Custom Metal Fabrication;
Quality Control: 100% Inspection Before Shipment;
Quality Assurance: ISO9001:2015, SGS, CE;
Available Drawings Format: STP, Step, Igs, Iges, X_T, Sat, Stl, Sld,Xml;
Equipment: 3/4/5 Axis Center Machining/Milling/Lathe;
Type: Broaching, Drilling, Etching / Chemical Machining,;
Material Capabilities: Aluminum, Brass, Steel, Titanium etc.;
Delivery Time: Sample 1-7 Day; Mass 2-4 Weeks;
Packing: EPE, Plastic Bag, Bubble Bag or Custom Package;
Product Type: Precision CNC Machining Parts;
Feature: High Performance;
Production Ability: 150000 Piece/Pieces Per Day;
Pricing Term: Roughness EXW, Foroughness CIF,Fca,DAP,DDP etc.;
|
Application: Fastener, Auto and Motorcycle Accessory, Hardware Tool, Machinery Accessory, Household Appliances;
Standard: Dme;
Surface Treatment: Polishing Finish, Texture Finish, Glossy Finish;
Production Type: Batch Production;
Machining Method: CNC Milling;
Material: Nylon, Plastic;
Part Material: ABS, PP, PC, POM, PMMA, Nylon, TPE, TPU etc;
Color: Customized Color;
Equipment: CNC Machining Centres;
Lead Time: 3-7 Working Days;
Process: CNC Turning Milling;
Services: From CNC Prototypes to Mass Production;
|