Suppliers with verified business licenses
The machine adopts cold quick-drying glue to reduce raw material costs (hot melt adhesive is twice as the cold water glue), that widely used in professional production of paper manufacturers. The machine is easy to operate and can produce paper handles with high speed usually reach 170 pairs per minute. We design and offer the optional assembly line, which can automatic gluing replace the human gluing procedure so that help to reduce lots of labor cost. And it can increase the production speed and finish large quantities order. Cold glue won't change and still stick firmly at low temperatures, which can ensuring the quality of handle.
1) Semi-automatic paper bag machine.
2) Easy to operate, with high speed to reach 170 pairs / minute.
3) Paper handle with twisted rope, and attach it to the paper bag.
4) Hot melt glue attached paper rope is stronger than starch glue, generally up to 15kg.
5) Feeding material is two roll of narrow paper belt with one roll of paper rope.
6) Stick paper rope to flat paper belt, cut them into right size, then stick them to paper bag.
7) Easy to control handle size & length.
8) Equipped with automatic counting and gluing functions. This can significantly increase the users' future processes' efficiency. It replaces the human gluing procedure so that help to reduce lots of labor cost.
9) Perfect after-sales service team to support.
10) It is highly recommended that the factory making paper bags use an auto-produce line that also supports customization.
Technical Data
Paper Roll Core Diameter | Φ76 mm(3'') |
Max. Paper Roll Diameter | Φ1000mm |
Production Speed | 10000pairs/hour |
Power Requirements | 380V |
Total Power | 7.8KW |
Total Weight | Approx.1500kg |
Overall Dimension | L4000*W1300*H1500mm |
Paper Length | 152-190mm(Optional) |
Paper Rope Handle Spacing | 75-95mm(Optional) |
Paper Width | 30/40mm |
Paper Rope Height | 100mm |
Paper Roll Diameter | 3.0-4mm |
Glue Type | Hot-melt glue |
Name | Original/Brand |
Melt-glue | Huangshang (Taiwan) |
Motor | Golden goal (Dongguan) |
Inverter | Rexroth (Doctor of Germany) |
Magnetic Brakes | Dongguan |
Blade | Anhui |
Bearing | NSK (Japnanese) |
Paint | Professional mechanical paint |
Low voltage electrical | Chint (Zhejiang) |
Q1. How to install and operate the machine?
Due to the Global Epidemics we can not send the engineer , will provide the manual and installation video.
After the global epidemic end, The seller will send 1 engineer to install, test the production line and train customers' workers in buyers' factory. It will take 1 week for whole installation and training.
Q2. What should we charge for your engineer?
The buyer should cover engineers' salary, visa cost, round-trip air tickets, accommodations, transportation in buyers' country, food, medical care, safety cost, and related cost happens in buyers' country. Also, the buyer should prepare enough labor, electric wire outside the control panel and tools for installations.
Engineer's salary is USD 80/day, depending on how the engineer make you satisfied. The date he arrives and leaves shall be counted as paid day.
Q3. How long is your machine's warranty period?
Warranty period for the delivered equipment will be 12 months after completion of erection but not later than 18months after shipment. In case any item proves to be defective and the damage is confirmed by seller's technicians within this period, the seller will at their choice either send engineer to repair or supply a new one for replacement free of charge on the basis of CNF delivery.
The above item does not include the parts, which have regular spares or the parts damaged from normal wear, abnormal operation, improper maintenance and inadequate civil works. The seller is not liable for any production loss under any circumstances.
Q4. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time. Engineers will help to take a solution video according your description.
Q5. How do you arrange packing for machine?
As per export standard, they will also be treated before delivery against damage and rusting.
Suppliers with verified business licenses