Basic Info.
Certification
CE, RoHS, FCC, EMC
Remote Control
With Remote Control
Application
Street Lighting, Public Outdoor Lighting
Product Description
Our World-Class Projects using the PLC and LoRa hybrid System on the 93km Expressway Road Lighting & the Tunnel Lightings, plus the Motion Sensor and the Weather Sesors...
Please check our google website and the Youtube Channel.
System Functions:
1. Server Capacity : Whole Country's all Projects can share one Server, Cloud Based Data store
2. PLC or LoRa : Hybrid PLC + LoRa with 2G/3G/4G
3. Automatic Control : Turn On/Off, Dimming according to the Nature Light Intensity or Ambient Brightness
4. Monitor Function : W/V/I/Tempt./Air Quality- PM2.5
5. Sensors Detecting: Rain/Fog/Snow/Sunny/Cloudy/ Dimming according to the Vehicles Motion Sensor
6. Max. Lamps Qty. : No limited
7. Max. Comm lines: 2,000m
8. Auto-Reporting : Tempt/ Malfunctions/Loop Power
9. GPS/ Altitude & Latitude /Sunset & Sunrise / Warning any Abnormal Cases.
10. Asset Management before the System Installing.
Intelligent Tunnel Lighting Features:
1. Automatic Dimming according to Natural Light Intensity, perfect solution to solve the Black Tunnel & White Tunnel Effects.
2. Linked with the Vehicle Detection Sensor: when a vehicle passes, it is automatically Dimming according to the natural light intensity; when there is no vehicle passes, it returns to a safe illuminance.
Intelligent Street Lighting Features:
1. Automatically Switch On & Off & Dimming the lights according to the Sunset and Sunrise time;
2. Automated Dimming according to Natural Light Intensity, automatic Turn On and Emergency Lighting in abnormal weather (such as Heavy Cloudy Weather, Heavy Rain, Foggy, Snowing, etc.).
3. Warm White & Cool/Nature White CCT colors auto-switching by at Summer Winter, Snowing, Foggy days according to Scene Timing. For example: 2700K CCT in Snowing/Foggy Days, and 4500/5000/6000K in Summer, Autumn seasons.
15.56km long World Class Expressway Tunnel Lighting Project:
The Tiantaishan Tunnel is a controlled project of Baoping Expressway, with a length of 15.56 kilometers, a double-hole and six-lane road, and a total investment of 0.38 billion US dollars. The vertical height of the tunnel from the ground is 70 meters, and the scale and difficulty of construction ranks first in the world. On November 20, 2016, 2,000 construction workers stationed in the deep mountains of Qinling, overcoming the difficulties caused by the cold, complex geology and lack of electricity, and started construction in an all-round way.
This Tunnel's Smart Tunnel Lighting Controlling system using our Looping Controller. It is the 6th super long expressway intelligent lighting on the tunnel which over 10 kilometers done by our Team.
TECHNICAL SPECIFICATION
VERSION:CH-J105-01
- Description
CH-J105 Smart Lighting Management Centralized Controller is independently developed by our company,which is widely used in the Smart City Street Lighting Projects, Super-highway's Tunnels and the Industrial Lighting such as big scale factory and warehouse Lighting System,control lighting fixtures through the man-machine interface,data acquisition and lamps Monitoring.Although the Traditional lighting fixtures have widely used in the street lighting, tunnel and high buildings, but there are still a lots of problem exit there: Lifetime, Light Attenuation, Bad Factory Environments etc. which will lead to damage the lamps,moreover, dead plate controlling method, Lighting Scene, the fault points and failure lamps only be found by when the worker inspection there, it can not provide a reliable working data to the controllers on time. For these reasons, we offer this muti-functions smart lighting Centralized Controller: Electric Energy/Data acquisition, Fault Detect,Data Process, Remote Copying Control,Loop Power Control, Dimming,Auto-Running, Temperature Collecting, Sensor Data Acquisition etc. The device has multiple interfaces, in addition to reserved Industrial Bus RS-485, RS-232, it is also equipped with Industrial Touch Screen Interactive Interface, Ethernet Communication Interface, GPRS Communication Interface, Lighting Control Interface (Power Line Carrier or LoRa Communication Channel) Communication Interface to the Loop Controller and Communication Interface with Sensors (such as Illuminance Sensors).The communication performance of the main communication interface is as follows: the communication distance of the RS-485 Industrial Bus can reach 2 km without Repeater, and the actual measurement in the tunnel can reach 1km.; A 7-level gateway can be set in the scene, and the maximum distance can reach 7km according to 1km of the gateway of each level, and the capacity of the equipment in the gateway is up to 255 units; LoRa Communication Interface, the communication distance can reach 2km without Repeater, the measured distance can reach 1km, and the communication distance can reach 10km in the case of repeater.PLC communication interface, the communication distance can reach 400m without repeater, and with repeater In this case, the communication distance can be up to 4km. II. Electrical Parameter1. Electrical Parameter Item | Rating Range |
Working Voltage | AC 220V±20% |
Working Frequency | 50Hz |
Static Power Consume | <3W |
Switching Output Over-current Capacity (resistive load) | 8A(MAX) |
Insulation withstand voltage (RS485 interface and power supply) | 4KV |
Surge Protection | ±4KV |
2. Environmental Parameter Item | Rating Range |
Working Temperature | -25ºC~+60ºC |
Limited Operating Temperature | -40ºC~+65ºC |
Storage and Transport Tempt. | -45ºC~65ºC |
Storage and Working Humidity Range | ≤85% |
III: Key Features1. Terminal Description NO. | MARKS | Functions Description |
01 | IA+ | A Phase Current Sampling Interface + |
02 | IA- | A Phase Current Sampling Interface - |
03 | IB+ | B Phase Current Sampling Interface + |
04 | IB- | B Phase Current Sampling Interface - |
05 | IC+ | C Phase Current Sampling Interface + |
06 | IC- | C Phase Current Sampling Interface - |
07 | NC | Empty |
08 | UN | Power supply N Line |
09 | UC | Communication coupling C phase |
10 | UB | Communication coupling B phase |
11 | UA | Power supply/communication coupling A phase |
12 | RA1 | Power Supply Status Output Detect Port --In |
13 | RA2 | Power Supply Status Output Detect Port --In |
14 | RXD | RS232 Receiving Port |
15 | TXD | RS232 Sending Port |
16 | CGND | RS232 Common Port |
17 | COM | Power Pulse Common Port |
18 | W | Active energy pulse output |
19 | Var | Reactive energy pulse output |
20 | GND | Power Supply Status Input Detect Port - Common |
21 | IN1 | Power Supply Status Input Detect Port - 1 |
22 | IN2 | Power Supply Status Input Detect Port - 2 |
23 | 485B2 | RS485 Communication Port 2 B |
24 | 485A2 | RS485 Communication Port 2 A |
25 | 485B1 | RS485 Communication Port 1 B |
26 | 485A1 | RS485 Communication Port 1 A |
- Indicator Description
No. | Name | Functions |
01 | Online | GPRS Online Indication |
02 | Reactive Power | Reactive Energy Pulse Output |
03 | Loop | Power Supply Output Status |
04 | Manual | Manual/Auto-Run Status |
05 | Status | Device is working- flashing 1/sec |
06 | Power | Device Power Supply |
07 | Active Power | Reactive Energy Pulse Output |
08 | Warning | Failure Indication |
09 | GPRS | GPRS Network port communication indication |
10 | PLC / LoRa | Power Line Carrier or LoRa Communication |
3. Button Operation Instructions1). Manual /Auto Run Under Manual Status -The Dimming Button Operation on the panel is Effective, otherwise the operation is invalid. Press the "Manual/Auto-Run" button to achieve manual / automatic state transition. That is to say, now it is Manual State, press again to enter the Auto-Run state. When changing from Manual state to Automatic state, the equipment will automatically broadcast and issue Automatic Operation Recovery Command. 2). Controlling ButtonNo. | Button | Function |
01 | 100% | Send 100% dimming command to the selected loop |
02 | 75% | Send 75% dimming command to the selected loop |
03 | 50% | Send 50% dimming command to the selected loop |
04 | 25% | Send 25% dimming command to the selected loop |
05 | Off | Send Off command to the selected Loop (0% dimming) |
4. Lighting Controlling Functions1). Control Priority Level High priority or Same Level can change the state of low priority or same level, while low priority can not change the state of high priority. The control mode corresponds to the following priorities.2). Priority Level 1 - Recovery Auto-Run Operating (Highest Priority Level)At this time, the state of priority Level 4 is executed regardless of the control state in which it was previously operated(the specific operation is performed according to the setting value at the time of installation).- The server or client remotely issues "Recovery Auto-Run" command.
- Press the "Manual/Auto - Run" Button on the device panel
3). Priority Level 2- Local Manual Control Change the illuminance of the lamp through the control button on the device panel; at this time, the control commands of priority 3 and priority 4 will not be executed if the manual command is executed. 4). Priority Level 2- Remote Operation Control Remotely issue the control Commands through the Server or the Client; at this time, the Lighting that executes the Manual Command, the Priority Level 3 and Priority Level 4 control status will not be executed. 5). Priority Level 3- Illumination Control Controls the Brightness values of all Fixtures according to preset rules by the received illuminance value.6). Priority Level 4 - Latitude &Longitude Control By setting the Latitude and Longitude values, the Sunrise and Sunset times are calculated, Disconnect the Loop at the sunrise time, Closed the Loop at the sunset time . The On-Off time can be fine-tuned by the Sunrise and Sunset offset time, and the range of fine-tuned for 30 minutes. 7). Priority Level 4 - Schedule Control Control the Brightness Value of the Fixture through the set 6-Segment Schedule. - Data Collection
Remote or Local Acquisition of Loop Controllers and Lamps Operating Status and Parameters. - Electrical Parameter Acquisition (Optional)
1). Collection of Electricity ConsumptionThe device has a Built-in Three-Phase Energy Collection Module, which can collect the Energy Measurement Value of the Internal Module and Report it.The Device can Collect the Energy Measurement Value of the Loop Controller and the Energy Meter and Report it.2). Electrical Parameter AcquisitionThe Built-in Three-Phase Energy Collection Module can collect the Voltage, Current, Active Power and Power Factor of the internal Module and Report it.The Device can collect the Voltage, Current, Active Power and Power Factor of the Loop Controller, the Energy Meter and the Intelligent Lighting management Terminal, and Report it.- Fault Reporting
The Fault of the Device itself Occurs(AC Contactor Fault, Clock Fault, Communication Fault, etc.), and the Fault Information is automatically reported to the Server.Collect the Information: such as Loop Controllers Fault and Light Controllers Fault, etc. (AC Contactor Faults, Clock Faults, Communication Faults, Lamp Faults, Temperature Faults, etc.)- Data Communication Channels
- . PLC - Power Line Communication
Power Line Communication (PLC) is a communication technology that enables sending data over existing power cables. This means that, with just power cables running to an electronic device (for example) one can both power it up and at the same time control/retrieve data from it in a half-duplex manner.2). LoRa CommunicationThrough LoRa Wireless Communication Channel, the Data Exchange and Control Command Reception between the Device and the Man-Machine Interface Device are realized. The Technical advantages are as follows:- Adopting the latest International IoT(Internet of Things) LoRa Communication Technology, combined with AES128 Communication Encryption Technology and Self-Organizing Network Technology, the Communication Distance, Reliability and Security are greatly improved.
- The Point-to-Point Communication Distance can reach 3,000m, and the measured average in the Power Plant is 1,000m.
- In the case of Repeater, measured 13,000m can be normal communication.
2). RS-485 Communication Through RS-485 Communication Channel, the Data Exchange and Control Command reception between the Device and the Man-Machine Interface Device are realized. The Technical Advantages are as follows: a). The device capacity in the gateway is 255. b). Strong Anti-Interference, Differential Mode Communication, and Software Fault Tolerance, no need to use Dedicated RS-485 Communication Line, reduce engineering cost under the premise of Ensuring Reliability - Extended Function (Optional)
1). Linkage The Device can be linked with Equipment such as Cameras and Conveyer Belt; For example, when the Camera is activated, the Brightness of the Corresponding Lighting Area is Raised lighting the whole area, to Restore the Original Illumination when the Camera Stop Shooting; Another example, when the Conveyor Belt start transmission, its corresponding lighting area is adjusted the brightness, illuminates the area, and restores the minimum safe illuminance when Stop Transmission.2). Dimming Loop Extension The Control Loop can be concatenated to realize the application of Multiple Requirements. IV: INSTALLING DIMENSIONS - The equipment can be mounted on standard rails, but also can be fixed by sampling screws.
- Dimensions:155mm*110mm*101mm ± 0.5mm
V: WIRING DIAGRAM
Please contact us for detailed Tech. files:
Address:
F4, Bldg a, Hanzhong Industrial Park, No. 67, North of Xinsha Ave, Xin Tang, Zeng Cheng, Guangzhou, Guangdong, China
Business Type:
Manufacturer/Factory
Business Range:
Lights & Lighting
Management System Certification:
ISO 9001
Company Introduction:
Guangzhou Cheng Hong E-Tech. Co., Ltd. Was established on August 8, 2012, focused on smart industry light control system, providing first-class intelligent street lighting management system Software, Hardware Equipment and the related LED lighting products. Since the establishment of the company, based on the principle of talent-oriented, relying on the core R& D team that has been engaged in the field of lighting industrial control for 18 years, the company has achieved rapid and stable development. We have developed over 100 main products and hundreds of derivative products, which have fully covered street lights, expressway and tunnel lighting, power plant and warehouse/building lighting, high speed railway stations, airport and small lighting and other fields. At present, it occupies more than 70% market share in the field of China expressway tunnel lighting with total over 2000 Tunnels Lighting Projects done till now, this quantity will be double in next 5 years based on traditional HPS (high pressure sodium lamp) update to high output lumen and intelligent tunnel lighting solutions, andvery fast growing new highway building with huge investment, more than 90% market share in the field of power plants, several large-scale urban smart streetlight projects at domestic and abroad.
Our mission is to contribute to the creation the IoT Industrial lighting for smart cities, we support this mission by providing smart street lighting solutions with first-class OFDM Power Line Communication and Wireless LoRA Communication Technology. By using the motion sensors and daylight sensors hybrid system, they can be seamlessly connected with all of the lighting fixtures, which will be more effectively manage the street lighting infrastructure, to lay a solid foundation for the smart city lighting management platform.
Top Technology researching & Developing to keep leader in the smart lighting management industry and BestQuality & Services to support the customers to become most competitive at the markets.
Join us together to the IoT Lighting Industry 4.0, we will make smarter city lighting projects! We are looking forward to becoming your reliable long-years strategy partner!