Basic Info.
Type
Welding Turning Rolls
Max Eccentricity Distance
100mm
Welding Turning Rolls Type
Welding Tilter Type
Flexible Combination
Transport Package
Wood Case
Product Description
BKT Manual Adjusting Welding Turning Roller Series
User's Guide
Wind Tower Manufacturing No.1 | https://www.made-in-china.com/showroom/weldcut |
Wind Tower Manufacturing No.2 | https://www.made-in-china.com/showroom/weldcut |
Wind Tower Manufacturing No.3 | https://www.made-in-china.com/showroom/weldcut |
Wind Tower Manufacturing No.4 | https://www.made-in-china.com/showroom/weldcut |
Wind Tower Manufacturing No.5 | https://www.made-in-china.com/showroom/weldcut |
Wind Tower Manufacturing No.6 | https://www.made-in-china.com/showroom/weldcut |
Wind Tower Manufacturing No.7 | https://www.made-in-china.com/showroom/weldcut |
BOTA design and manufacture of welding products is an advantage to draw domestic and foreign products,In conjunction with the requirements of a number of boiler and pressure vessel manufacturer and self-developed.Including welding roller series,column and boom manipulator,Variable-bit machine series,Slewing platform and electric-car series,Special plane and welding machine series,CNC cutting machine,
Tanker production lines and wind power wind tower production line,Also it is based on user needs,Tailored.
Our products are widely used in petrochemical,Pipeline,Pressure vessel,Steel,
Machine-made,Power EngineeringAnd other industries.
A welding auxiliary equipment,Commonly used in the work inside and outside the inner and outer girth and longitudinal seam welding,And other welding equipment,Can realize automatic welding center.
Not as beneficial as fusion burning of alloying elements,Prevent the intrusion of harmful elements weld problems,It simplifies the welding process,Improve the health conditions of welding.
It can be used for manual welding,Assembly,Workpiece inspection and other occasions displacement.
The use of advanced micro-computer controlled AC drives,Motor stepless,Constant torque output,Speed and stability.
With advanced technology,Quality, reliable,Operation simple.
Saving manpower,Cost savingsIt saves time.
[Please read the instructions in detail before using,Do not know where to contact the manufacturer]
Do not use under foggy conditions.
You must be a detailed examination of the various moving parts before operating properly.
The operator must hold welder training certificate operated by skilled operatives through.
Must be checked monthly maintenance,Make sure all moving parts flexible
(Inspection and maintenance records must be established).
Mechanical structure and electrical control by the manufacturer, scientific design,
The unauthorized alteration or install anything.
High-voltage electrical cabinet,Should be someone to equipment maintenance,
We must cut off the power when the overhaul.
Strict accordance with Item 9, "care and maintenance" of the terms.
Practice and manufacturers suggested theoretical guidance notes is to ensure normal operation of equipment and safety,Users must be strictly enforced during use,Or peril.
Index
A.Purpose and scope
B.Key Features
C.Equipment applicable conditions and working environment
D.The main technical parameters
E.Structure and Characteristics
F.Manual control box instructions
G.Installation Notes
H.Caution
I.Care and maintenance
J.Troubleshooting List
K.Packing List
A.Main purpose and scop
1.Usage:
KT Adjustable welding roller stand is the use of friction between the main roller and the weldment initiative driven mechanical deformation weldments rotation,It may differ according to the workpiece diameter,Moving the scroll wheel group,Adjust wheel center distance,Mainly used for pipes,Container,Boiler,Tanks and other cylindrical workpiece assembly and welding,Our wheel rotating roller frame AC motor drive,Frequency,With a wide speed range,Smooth rotation is good,The low-speed characteristics of hard and so on.
If make appropriate height adjustments for main and idler roller,It can also be vertebrae,Break unequal diameter rotors have assembly and welding.For some non-circular long weldmentsIf it means the card in a special annular collar,Also be carried out welding work welding roller frame.
2. Model and meaning
B K T ─
╚Model ╚Carry weight
B.Key Features
1,The roller base is made of steel frame welding mechanism,Solid and reliable,
The entire apparatus is a support mechanism,Base design can be a fixed formula based on the needs of users,Walking structure (concrete way according to the technical agreement).
2,The roller position can be adjusted step bolt by screws roller center distance (Above 10 tons roller)Or by adjusting the screw to carry away from the center of the wheel(Lower than 10 tons roller, the specific adjustment method according to technical agreement).
3, Under normal circumstances,roller does not install a workpiece anti drifting devices (or electric powered screw to carry adjust the center distance).If you have special needs, The company can design and manufacture specifically for anti-drifting device (or electric powered screw to carry the adjustment center distance).It must indicate in the technical agreement.
4, Hand control box is simple and reliable,Easy to operate,Flexibility,Suitable for a variety of environments.
C.Equipment applicable conditions and working environment
1, The applicable conditions
• Devices use a three-phase 380v-415v (+10%) / 50HZ AC power.
• Device operating ambient temperature range: 5 ºC ~ 40 ºC
1, The applicable conditions
• Devices use a three-phase 380v-415v (+10%) / 50HZ AC power.
• Device operating ambient temperature range: 5 ºC ~ 40 ºC
D.The main technical parameters
Model | Loading Ton | Wheel Dia mm | Wheel Width mm | Workpiece mm | Motor Power | Welding Speed |
No x Power | mm/min |
BKT-1 | 1 | 200 | 50 | 150-1500 | 2x0.25kw | 100-1000 |
BKT-3 | 3 | 200 | 100 | 200-2000 | 2x0.37kw | 100-1000 |
BKT-5 | 5 | 250 | 120 | 200-2500 | 2x0.55kw | 100-1000 |
BKT-10 | 10 | 300 | 120 | 300-3000 | 2x0.55kw | 100-1000 |
BKT-20 | 20 | 300 | 200 | 300-3500 | 2x0.75kw | 100-1000 |
BKT-30 | 30 | 350 | 220 | 300-4000 | 2x1.1kw | 100-1000 |
BKT-40 | 40 | 425 | 220 | 300-4500 | 2x1.5kw | 100-1000 |
BKT-50 | 50 | 425 | 220 | 400-4500 | 2x1.5kw | 100-1000 |
BKT-60 | 60 | 450 | 220 | 600-5000 | 2x1.5kw | 100-1000 |
BKT-80 | 80 | 500 | 260 | 800-5500 | 2x2.2kw | 100-1000 |
BKT-100 | 100 | 550 | 260 | 1000-6000 | 2x2.2kw | 100-1000 |
BKT-150 | 150 | 550 | 300 | 1100-7000 | 2x3kw | 100-1000 |
BKT-200 | 200 | 550 | 300 | 1200-7800 | 2x4kw | 100-1000 |
E.Structure and Characteristics
The series of products for modular roller,Its driven roller and idler roller are independent,Can be any combination of weight and length of the workpiece between them,Its combination ratio is a driven roller and idler roller combinationIt may also be from one main with two ideler or one main with three idlers .Easy to use and flexible,
Adaptability butt member.
BKT manual-adjusting roller structure as shown:
BKT02-BKT10 Roller
BKT20-BKT40 Roller
BKT60 Ton and 60Ton above Roller
1, The roller composed by the main roller, idler roller, control box,Manual control box of four parts.
2, The main roller composed by the motor,Reducer,Base,Roller and roller frame composition,Roller dragging by the three-phase asynchronous motor FM by inverter,After the gear reducer drive wheel drive to work,Speed control,Composed by the main roller, idler roller, roller bracket, base composition.
3, The control box using advanced speed control unit,By the control circuit board,
Inverter,Contactors,Relays,air switch,Controlling the composition transformers and other components.
4,The whole design of the control function buttons on the hand control box,
Indirectly via potentiometer adjustment of the current welding speed,And welding speed can be pre-adjusted in advance,In the manual control box can be displayed by the digital display table when the frequency of the motor is running.
Hand pendant remoter (Figure 2).
5, Roller has been completely tested before shipment,.If you find the speed out of control or intermittent operation occurs,You can check whether the program is to change the drive features,You must check the inverter function table,Set the desired function.I plant factory are adjusted to the external input control,According to the functional requirements of the product standard setting.(Note: This will only be allowed professionals to operate, or peril)
F.Manual control box instructions
Device control box is placed in the device side of the base,Drive speed display,
Its display unit is usually in Hz.Roller work status and speed adjustment by hand control box is completed,Manual control box panel as shown:
1,The speed adjustment potentiometer:
The potentiometer for adjusting the rotational speed of roller frame,Clockwise rotation,Speed increases,Counterclockwise rotation,The speed is reduced.
(Figure 2)
2, the machine / linkage switch:
The machine / linkage conversion switch to the native state,Reversing roller stand manual control box switch roles:Appropriated linkage state,In the case of column and boom manipulator linkage control lineOperating machine manual control box Roller Bed reversing control work.The linkage control unit and hand control box roller frame a common speed adjustment knob.
3, reversing switch:
Reversing toggle switch forward position,Trundle bed is transferred;Reversible conversion switch to anti-around position,Trundle bed reversal;Reversible conversion switch to the stop position,Trundle bed deceleration brake way stop.
Seven, installation instructions
Please read this manual carefully before installation
Main and driven roller frame must be installed in the same plane, with a horizontal center line, the specific requirements and adjustment methods are as follows:
1, installation ground plane allowable error: 0.2 / 1000mm.
2, the main and driven roller frame according to the requirements placed in the appropriate level, with the ruler to test the main and secondary roller frame diagonal length. Claim:
a, the test to the upper side of the roller wheel on the end of the center of the wheel as the base point (as shown)
b, Driven roller and idler roller diagonal length equal,Error range: ± 2mm.
The number of adjustments | Horizontal centerline(mm) | Workpiece rotation | Remark |
AB | CD | Offset(mm) |
First time | 2445 | 2420 | 150 | Unable welding |
second time | 2450 | 2435 | 40 | Unable welding |
the third time | 2455 | 2451 | 4 | Normal welding |
Note: Main and driven roller frame diagonal length is equal to the main factors that affect the workpiece offset, be sure to make the relevant adjustments before the operation.
3, the normal operation of each wheel holder to be four rounds of contact, if only two rollers contact the workpiece, the maximum carrying tonnage reduced by 50%.
H.Caution
1. Please read the instruction manual carefully before using!
2, The device is prohibited overturning.Upside down.
3.When install driven roller and idler roller,Must ensure that driven roller and idler roller level contours,Centerline on the same line (see installation instructions).
4.Workpiece diameter should be strictly in accordance with the Technical Data Sheet regulations,Or prone to accidents,If the device is a driven roller and an idler roller ,Workpiece length should be controlled in less than 10M;If the length of the workpiece 10M≤L <20M when,It requires the use of two idler from a main roller. When using one main and two idler rollers, main roller should be placed in the center position of the workpiece, idler roller placed in a position from the workpiece end 1 ~ 1.5M of.
5, Steel tire is only suitable in normal condition,Under special circumstances steel rubber wheels contact with the workpiece and the steel is higher than the maximum temperature allowed 60 ºC,Otherwise steel rubber wheel damage at the user's responsibility.
6, When used,Should ensure that the roller surface is clean,Roller frame roller contacts should all work,Non welds or sharp parts of the contact roller,Lifting the workpiece,Non-impact wheel,To prevent damage to the roller or other components;In the device is not fixed,Strong impact is likely to lead the whole subversion.
7, Before using the roller,Check the control box is reliable grounded.
8, The device uses a three-phase 380v-415v (± 10%) 50HZ AC power,Power line through the air switch,Ensure safe operation.Equipment commissioning,Power,Press the start button,Observe the rotation of the drive wheel and speed adjustment is normal.If abnormal,Should immediately power off,Find out the reasons,When the fault is only in power test machine.
9, Roller frame at startup by gradually adjusted low speed.Operation,Non-human separation,Workpiece rotation within a radius strictly prohibited.
10, The control box-conversion processing unit,Non-professionals can not carry out commissioning and maintenance.
11, The control box to the control box,Roller frame cable,You can not pull,The need to prevent heavy crushing.
I.Care and maintenance
1, Non-slip rubber wheel on roller whether there burns or aging,If such a phenomenon please be protected during use.
2, All gear must be checked prior to use if the body filling oil,When not filling oil is strictly prohibited.
3, Weekly inspection gear,Reducer oil.
Reducer oil Instructions:
4, for the device you are using normal operation,When added to the gear oil,
Please choose different types according to the type and ambient temperature reduction gear oil
| (-30°) | (-15°) | (5°) | (25°) | (40°) | Remark |
- | -(-5°) | -(25°) | -(40°) | -(65°) |
(-15°) | | | | |
Worm gear | HD-100 | HD-150 | HD-220 | HD-320 | HD-460 | Normal load |
Reducer | HD-150 | HD-220 | HD-320 | HD-460 | HD-680 | Heavy Duty |
Cycloid | 14 oil (winter) | Normal load |
Reducer | 110 # industrial gear oils (summer) | Heavy Duty |
Remarks:
1, listed in the table for the medium and large-tonnage adjustable roller frame gear lubricant table.
2, for small-tonnage adjustable roller frame,Usually installed RV aluminum worm reducer and cycloid reducer,When the RV reducer factory have raised have WA460A oil.Aluminum gear lubricant filling is 002,This kind cycloid reducer use in general do not need to refuel.
J.Troubleshooting List |
NO | unpleasant sight | Bad reasons | Implementation Countermeasures | Remark |
| Motor does not turn | 1, three-phase voltage is not connected | 1, the external power | |
1 | Light does not shine | 2, the light bad | 2, the replacement indicator |
| | | | |
| Motor does not turn | 1, the inverter alarm | 1, manual reset drive | Refer to the inverter manual alarm contents |
2 | Lights | 2, motor damage | 2, replace the motor |
| | 3, the electrical cable is damaged | 3, check the cables and repair |
| Offset to one side of the workpiece rotation | driven roller and idler roller ares not in the same plane, Or main and idler roller center diagonal uncorrected | Check the flatness and correcting driven roller and idler roller center diagonal | |
3 |
|
|
| | Reducer damage | Replace reducer | |
4 | The motor output shaft, But the roller does not turn |
| |
5 | Motor Action and buzz | 1, open space or equipment have one phase open circuit or poor contact | 1. Check the air switch is bad, give repair | First check whether poor contact switch startup device and then check the motor windings open circuit |
2, motor winding one phase breaker | 2. Check whether the motor phase failure, given the appropriate treatment. |
3, the power supply voltage is too low | 3, measuring the power supply voltage is too low, given the phase response processing |
6 | The motor does not start, Drive protection or breaker tripped. | 1, the stator winding is grounded, short circuit fault, | 1, to distinguish between the three-phase head and tail, then good. | MCB is closed |
2, wiring error, the Y-connection motor connected as △. | 2, check the winding short circuit, earth, new repaired. |
3, the load is too large, | 3, check the boot device |
4, load machine stuck or faulty mechanical transmission. | 4. Check the load and drive mechanism. |
5, the stator and rotor phase rub. | 5, to find out the cause and repair phase rub. |
7 | Difficulty in starting the motor, low speed | 1, the power supply voltage is too low | 1, adjusting the voltage or the like voltage is normal restart, | |
2, the electrical connection error △ connection motor connected to a Y connection | 2, correct connection, |
3, Y-phase winding connected to a motor trip | 3. Check the power supply, re-repaired. |
4, motor overload | 4. Reduce the load. |
8 | Motor phase current imbalance and the temperature rises, even smoke | 1, power supply voltage imbalance. | 1. Find a voltage imbalance causes and ruled out. | |
2, the motor winding short circuit or ground fault | 2. Check the short-circuit and repair. |
3, the motor winding circuit, | 3, find the breaking point, reconnect |
9 | Motor phase current is increased at the same time. Temperature is too high, even smoke. | 1, the power supply voltage is too high or too low. | 1, adjusting the voltage or the like voltage is normal again work | |
2, motor overload. | 2, reduce the load, |
3, being dragged mechanical failure. | 3. Check the load and transmission |
4, motor winding connection error | 4, the change took |
10 | Current does not exceed the rating, but the temperature is too high. | 1, ambient temperature is too high | 1, try to reduce the ambient temperature or reduce motor used capacity. | |
2, poor ventilation | 2, clean up the effects of ventilation duct or something to move away. |
3, the electrical dust, excessive sludge,the impact of heat. | 3, clean up dust oil it mud. |
K.Packing List
1, the main roller 1 set
2, the idler roller 1 set
3, the control box (with cable) 1 set
4, manual control box (with cable) 1 set
5, packing list.Certificate.Warranty Card.Instructions.Each one piece