Forged
US$1.00 / Piece
View

ASME Stainless Steel High Pressure Forged Thread Half Coupling for Shipbuilding Video

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

20 Pieces US$1.00 / Piece

Sepcifications

  • Warranty 1 Year
  • Connection Welding
  • Structure Vertical
  • Flexible or Rigid Rigid
  • Material Stainless Steel
  • Standard Standard
  • Transport Package Carton, Wooden Case
  • Specification 1/8"-4"
  • Origin Yan Cheng, China
  • Pressure 3000lb, 6000lb
  • Certificate ASME B16.11-2016
  • Lead Time 25 to 35 Days
  • Delivery by Sea, by Air and by Express

Product Description

Stainless Steel High Pressure Forged Thread Half Coupling for Water Supply Product Description Product thread half coupling forged pipe fittings Material F304L,F316L Type Half coupling Contact type Thread Dimension Specification ASME B16.11-2016(Revision of ASME B16.11-2011) Pressure ...

Learn More

Forged Comparison
Transaction Info
Price US $ 1/ Piece US $ 1.73-4.14/ Piece US $ 1/ Piece US $ 15/ Piece US $ 0.20-5.00/ Piece
Min Order 20 Pieces 1 Pieces 1 Pieces 10 Pieces 1000 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P L/C, T/T L/C, T/T L/C, T/T L/C, T/T, Western Union
Quality Control
Product Certification ASME B16.11-2016 - - - -
Management System Certification - - ISO 9001, ISO 14001, IATF16949 ISO 9001 ISO 9001, ANSI/ESD
Trade Capacity
Export Markets East Asia(Japan/ South Korea), Domestic East Asia(Japan/ South Korea) Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Western Europe North America, South America, Southeast Asia/ Mideast
Annual Export Revenue - - - - -
Business Model - OEM, ODM, Own Brand OEM OEM OEM, Own Brand
Average Lead Time - Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Warranty: 1 Year;
Connection: Welding;
Structure: Vertical;
Flexible or Rigid: Rigid;
Material: Stainless Steel;
Standard: Standard;
Pressure: 3000lb, 6000lb;
Lead Time: 25 to 35 Days;
Delivery: by Sea, by Air and by Express;
After-sales Service: One Year;
Warranty: One Year;
Connection: Coupling, Screw;
Structure: Customize;
Flexible or Rigid: Flexible;
Material: Alloy/Carbon Steel/Stainless Steel;
Standard: Standard;
Molding Method: Casting, Laser Forging;
Adaptive Domain: Building/Bridge Piping Support;
After-sales Service: Replacement;
Warranty: 5 Years;
Connection: Press Connection;
Structure: Vertical;
Flexible or Rigid: Rigid;
Material: Iron;
Standard: Nonstandard;
Raw Material: Ductile Iron;
Production Line: Disa Zz416;
Testing Equipment: Spectrometer, Strength & Hardness Tester etc;
Packaging: Plywood Cases;
Connection: Socket;
Structure: Universal;
Flexible or Rigid: Rigid;
Material: Clear PVC;
Standard: ANSI,DIN,JIS;
Pressure: Sch80;
Temperature: 0~65 Degree;
Connection: Female;
Structure: Universal;
Flexible or Rigid: Rigid;
Material: Zinc Die Cast;
Standard: Standard;
Supplier Name

Yancheng Jicheng Machinery Co., Ltd

China Supplier - Gold Member Audited Supplier

Weifang Tianying Security Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Handan Baote Foundry Co., Ltd.

China Supplier - Gold Member Audited Supplier

NINGBO RMI PLASTIC CO., LTD.

China Supplier - Diamond Member Audited Supplier

ZHEJIANG TENGZE ELECTRICAL EQUIPMENT CO., LTD.

China Supplier - Diamond Member Audited Supplier