Forged
US$1.00 / Piece
View

Forged Stainless Steel 304/316 High Pressure Thd Union with Mss Sp-85 Video

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

20 Pieces US$1.00 / Piece

Sepcifications

  • Warranty 1 Year
  • Standard MSS SP-83
  • Technique Forged
  • Type Threaded Union
  • Material Stainless Steel
  • Connection Welding
  • Transport Package Carton, Wooden Case
  • Specification 1/8"-4"
  • Origin Yan Cheng, China
  • Pressure 3000lb, 6000lb, 9000lb
  • Certificate ASME B16.11-2016
  • Lead Time 25 to 35 Days
  • Delivery by Sea, by Air and by Express

Product Description

Forged Stainless Steel High Pressure Thread Union for Water Supply Product Description Product thread union forged pipe fittings Material F304L,F316L Contact type Thread Dimension Specification MSS SP-83-2014 Pressure 3000lb, 6000lb Temperature -20°C to +600°C Place of origin ...

Learn More

Forged Comparison
Transaction Info
Price US $ 1/ Piece US $ 2,100.00-2,300.00/ Ton US $ 165.00-190.00/ Piece US $ 1.50-5.00/ Piece US $ 2,000.00-2,200.00/ Ton
Min Order 20 Pieces 1 Tons 1 Pieces 5000 Pieces 1 Tons
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P L/C, T/T, Western Union L/C, T/T, D/P, Western Union, Money Gram L/C, T/T L/C, T/T, Western Union
Quality Control
Product Certification ASME B16.11-2016 - - - -
Management System Certification - ISO 9001, ISO 14001, ISO 20000, OHSAS/ OHSMS 18001 OHSAS/ OHSMS 18001 - ISO 9001, ISO 14001, ISO 20000, OHSAS/ OHSMS 18001
Trade Capacity
Export Markets East Asia(Japan/ South Korea), Domestic South America, Eastern Europe, Africa, Mid East, Western Europe Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea) North America South America, Eastern Europe, Africa, Mid East, Western Europe
Annual Export Revenue - - - - -
Business Model - OEM, ODM, Own Brand - - OEM, ODM, Own Brand
Average Lead Time - Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
- - Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
Warranty: 1 Year;
Standard: MSS SP-83;
Technique: Forged;
Type: Threaded Union;
Material: Stainless Steel;
Connection: Welding;
Pressure: 3000lb, 6000lb, 9000lb;
Lead Time: 25 to 35 Days;
Delivery: by Sea, by Air and by Express;
Technique: Forged;
Type: Threaded Union;
Material: Wrought Steel;
Connection: Threaded,Screwed;
Time of Delivery: 7 - 30 Days;
Warranty: 1 Year;
Standard: GB3289.37,3298.38-82;
Technique: Casting;
Nominal Diameter: 1200;
Type: Threaded Union;
Material: Carbon Steel;
Connection: Flange;
Standard or Nonstandard: Standard;
Product Name: Flange Joint;
Body: Cast Iron/Ductile Iron/Carbon Steelstainless Steel;
Disc: Ductile Iron/SS304/SS316;
Stem: Carbon Steel/Ss410/Ss416;
Seat: EPDM/NBR/Viton/PTFE;
Coating: Epoxy Coated;
Operator: Lever/Gear/Bare Shaft/Electric/Worm Gear;
Sample: Available;
After-sales Service: Fixing;
Warranty: Fixing;
Standard: UL Listed;
Technique: Forged;
Nominal Diameter: 1/2 to 4 Inch;
Type: Socket Union;
Material: Iron;
Connection: Press Connection;
Sureface: Electro Gal;
Insulated: Available;
Proof: Watertight;
Standard: MSS SP-83;
Technique: Forged;
Type: Threaded Union;
Material: Carbon Steel,Stainless Steel;
Connection: Threade,Socket-Weld;
Delivery Date: 7 - 30 Days;
Supplier Name

Yancheng Jicheng Machinery Co., Ltd

China Supplier - Gold Member Audited Supplier

Hefei Lamat Piping Co., Ltd.

China Supplier - Gold Member Audited Supplier

Like Valve (Tianjin) Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Zhejiang Axwill Electrical Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Hefei Lamat Piping Co., Ltd.

China Supplier - Gold Member Audited Supplier