Home
Product Directory
Auto, Motorcycle Parts & Accessories
Auto Electrical System
Auto Relay
Line, Breaker and Auto-Recloser Protection, Control and Monitoring IED
Negotiable | (MOQ) |
Find Similar Products
Product Description
Company Info
Product Description
CSC series microprocessor based protection device
Network based hardware platform consists of 32 bit DSP-CPU combined chips.
With bus-within-chip, the simplified circuit has achieved more reliability and its anti-disturbance can reach the standard of IEC-61000-4.
Protection device is optimized with patented technologies such as fuzzy control and auto-adopting.
Integrated automation can be achieved with various interfaces of high speed data communication
Auto-checking function.
Covering most of protection area, Sifang's products have been expended into over ten categories, twenty series, one hundred sorts including line protections with different voltage rates ranging from 10KV to 500KV, transformer protection, generator-transformer protection and circuit breaker etc.
Network based hardware platform consists of 32 bit DSP-CPU combined chips.
With bus-within-chip, the simplified circuit has achieved more reliability and its anti-disturbance can reach the standard of IEC-61000-4.
Protection device is optimized with patented technologies such as fuzzy control and auto-adopting.
Integrated automation can be achieved with various interfaces of high speed data communication
Auto-checking function.
Covering most of protection area, Sifang's products have been expended into over ten categories, twenty series, one hundred sorts including line protections with different voltage rates ranging from 10KV to 500KV, transformer protection, generator-transformer protection and circuit breaker etc.
Address:
No. 9, Street 4, Shangdi, Haidian District, Beijing, China
Business Type:
Manufacturer/Factory
Business Range:
Computer Products, Electrical & Electronics, Security & Protection, Service
Main Products:
Transform Substation, Automation, Protection, Power Plant
Company Introduction:
Founded in 1994, Beijing Sifang Automation Co., Ltd is a high-tech enterprise mainly engaged in R&D and Manufacture of power system protection relay devices and automatic control systems. These products have also been widely applied to other industries such as petrochemical, railway, coal and metallurgy in China.
Sifang passed ISO9001 quality assessment, ISO14001 environment management assessment series and the occupational health&safety assessment series 18001
Board Chairman: Mr. Yang Qixun, academician of Chinese Engineering Academy.
General Manager: Dr. Wang Xuzhao taking a leading role in China′s power system, Sifang has been rewarded with several major honors such as the Star of National Industry by Ministry of Foreign Trade &Economic Cooperation, P. R. C., listed among of Top 100 Software Suppliers by Ministry of Information Industry, P. R. C., Key Software Supplier by the State Developing & Planning Committee etc.
KEY PROJECTS IN THE PAST 10 YEARS
Sifang has made great contribution to China′s power construction by participating in key power projects such as the Three Gorges Project, Power Transmission from West to East, Nationwide Power Grid interconnection etc.
The Three Gorges Project
500KV Nangchang Substation
The first 500KV power transmission substation of the Three Gorges Project, Sifang supplied a fully integrated substation automation system, including the CSC2000 substation automation master system, several CSC series of microprocessor-based protection relay as well as many measurement& control units.
500KV Xiaogan substation
One of the key substations for the Three Gorges Project, and a pivotal project of Central China power grid.
CSC2000 substation automation system, various kinds of microprocessor-based protection, measurement & control units, monitoring station, engineer station and fault free station in Xiaogan substation are all provided by Sifang.
500KV Jingmen substation
Jinmen Douli substation is a hub substation for power transmission of the Three Gorges Project.
CSC2000 substation automation system, various kinds of microprocessor-based protection, measurement & control units, automatic equipments in this substation are all provided by Sifang.
It was here that Information transmission from Jingmen 500KV substation to State Power Dispatching Center was successfully carried out complying with TASE2 protocol for the first time.
Power Transmission from West to East
500KV Tianshengqiao substation
It is the key substation which enhances South China power System and it is regarded as key step for Power Transmission from West to East. Sifang provides CSC2000 substation automatic system, measurement & control units, monitoring station, engineer station and fault free station.
Sifang passed ISO9001 quality assessment, ISO14001 environment management assessment series and the occupational health&safety assessment series 18001
Board Chairman: Mr. Yang Qixun, academician of Chinese Engineering Academy.
General Manager: Dr. Wang Xuzhao taking a leading role in China′s power system, Sifang has been rewarded with several major honors such as the Star of National Industry by Ministry of Foreign Trade &Economic Cooperation, P. R. C., listed among of Top 100 Software Suppliers by Ministry of Information Industry, P. R. C., Key Software Supplier by the State Developing & Planning Committee etc.
KEY PROJECTS IN THE PAST 10 YEARS
Sifang has made great contribution to China′s power construction by participating in key power projects such as the Three Gorges Project, Power Transmission from West to East, Nationwide Power Grid interconnection etc.
The Three Gorges Project
500KV Nangchang Substation
The first 500KV power transmission substation of the Three Gorges Project, Sifang supplied a fully integrated substation automation system, including the CSC2000 substation automation master system, several CSC series of microprocessor-based protection relay as well as many measurement& control units.
500KV Xiaogan substation
One of the key substations for the Three Gorges Project, and a pivotal project of Central China power grid.
CSC2000 substation automation system, various kinds of microprocessor-based protection, measurement & control units, monitoring station, engineer station and fault free station in Xiaogan substation are all provided by Sifang.
500KV Jingmen substation
Jinmen Douli substation is a hub substation for power transmission of the Three Gorges Project.
CSC2000 substation automation system, various kinds of microprocessor-based protection, measurement & control units, automatic equipments in this substation are all provided by Sifang.
It was here that Information transmission from Jingmen 500KV substation to State Power Dispatching Center was successfully carried out complying with TASE2 protocol for the first time.
Power Transmission from West to East
500KV Tianshengqiao substation
It is the key substation which enhances South China power System and it is regarded as key step for Power Transmission from West to East. Sifang provides CSC2000 substation automatic system, measurement & control units, monitoring station, engineer station and fault free station.
Send your message to this supplier