Intelligent Multi-Axis CNC Internal Edge Welding Special Machine with Automated Functions

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Set US$11,000.00 - 13,000.00 / Set

Sepcifications

  • Cooling Way Air Cooling
  • Control Semi-Automatic
  • Style Vertical
  • Welding Way Seam Welding
  • Type Three-Phase Secondary Rectification Welder
  • Transport Package Film
  • Specification 11085
  • Trademark Star Power
  • Origin China
  • Body Size 1100X850X1450mm
  • Control Method PLC
  • Power 0.4kw
  • The Clamping Way Pneuma-Lock
  • Compressed Air Pressure 0.2-1.0MPa

Product Description

Product Description Our CNC panel inner step welding machine is an advanced welding equipment designed specifically for high-precision welding needs. This equipment adopts numerical control technology and has precise and stable operation. Through the intelligent control system, welding parameters ...

Learn More

CNC Welding Machine Comparison
Transaction Info
Price US$11,000.00 - 13,000.00 / Set US$145,000.00 - 150,000.00 / Piece US$110,000.00 - 113,040.00 / Piece US$100,000.00 - 102,310.00 / Piece US$40,000.00 - 80,000.00 / Piece
Min Order 1 Set 1 Piece 1 Piece 1 Piece 1 Piece
Payment Terms - LC, T/T LC, T/T LC, T/T LC, T/T
Quality Control
Management System Certification - - - - -
Trade Capacity
Export Markets - North America, South America, Europe, Southeast Asia/ Mideast, East Asia(Japan/ South Korea), Domestic North America, South America, Europe, Southeast Asia/ Mideast, East Asia(Japan/ South Korea), Domestic North America, South America, Europe, Southeast Asia/ Mideast, East Asia(Japan/ South Korea), Domestic North America, South America, Europe, Southeast Asia/ Mideast, East Asia(Japan/ South Korea), Domestic
Annual Export Revenue - - - - -
Business Model - ODM, OEM ODM, OEM ODM, OEM ODM, OEM
Average Lead Time - Peak Season Lead Time: 3-6 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 1-3 months
Product Attributes
Specification
Cooling Way: Air Cooling;
Control: Semi-Automatic;
Style: Vertical;
Welding Way: Seam Welding;
Type: Three-Phase Secondary Rectification Welder;
Body Size: 1100X850X1450mm;
Control Method: PLC;
Power: 0.4kw;
The Clamping Way: Pneuma-Lock;
Compressed Air Pressure: 0.2-1.0MPa;
Cooling Way: Water Cooling;
Control: Semi-Automatic;
Style: Disc;
Welding Way: Spot Welding;
Type: Three-Phase Secondary Rectification Welder;
Hwj1000: Diameter 300-1000mm;
Length: Max.4m;
Precision: ± 0.03mm;
Cooling Way: Water Cooling;
Control: Semi-Automatic;
Style: Disc;
Welding Way: Spot Welding;
Type: Three-Phase Secondary Rectification Welder;
Hwj1000: Diameter 300-1000mm;
Length: Max.4m;
Precision: ± 0.03mm;
Cooling Way: Water Cooling;
Control: Semi-Automatic;
Style: Disc;
Welding Way: Spot Welding;
Type: Three-Phase Secondary Rectification Welder;
Hwj850: Diameter 200-850mm;
Length: Max.4m;
Precision: ± 0.03mm;
Cooling Way: Water Cooling;
Control: Semi-Automatic;
Style: Disc;
Welding Way: Spot Welding;
Type: Three-Phase Secondary Rectification Welder;
Syhwj-300: Diameter 80-314mm;
Length: Max.9m;
Precision: 0.03mm;
Slot Size: 0.05mm-16mm;
Supplier Name

FOSHAN STAR POWER TECHNOLOGY CO.LTD

Diamond Member Audited Supplier

SHIJIAZHUANG JIERKANG MACHINERY EQUIPMENT CO., LTD.

Diamond Member Audited Supplier

SHIJIAZHUANG JIERKANG MACHINERY EQUIPMENT CO., LTD.

Diamond Member Audited Supplier

SHIJIAZHUANG JIERKANG MACHINERY EQUIPMENT CO., LTD.

Diamond Member Audited Supplier

SHIJIAZHUANG JIERKANG MACHINERY EQUIPMENT CO., LTD.

Diamond Member Audited Supplier