Specification |
Standard: ASTM, JIS, GB, AISI, DIN, BS;
Surface Treatment: Galvanized;
Technique: Cold Rolled;
Application: Silo;
Edge: Slit Edge or Mill;
Stock: Not Stock;
Surface Qualityldr;): a;
Min Coating(Gr): 40g;
Post Treatment(Type): Trivalent Chromium Process/Chromium Free and Finge;
Oil Codition: Light Oiled;
Spangle Type: Zero Spangle;
Delivery Time: 30 Days;
Grade: Alloy Coating Steel Coil/Plate;
Coil Weight: 5-14 Tons;
|
Standard: ASTM, JIS, GB, AISI, DIN, BS;
Surface Treatment: Polished;
Technique: Cold Rolled;
Application: Boiler Plate;
Edge: Slit edge;
Stock: Stock;
Products Name: Stainless Steel Coil;
Keyword: Stainless Steel;
Width: 600~1500mm;
Thickness: 0.25-10mm;
Length: Customized;
Weight: 3-8 Tons;
MOQ: 5 Tons;
Technology: Cold Rolled & Hot Rolled;
Delivery Terms: Fob, CIF, CFR, CNF, etc.;
Surface: 2b, Ba, No.1, No.3, No.4, Hl;
Finish Protection: PVC Film, Paper;
|
Standard: ASTM, JIS, GB, AISI, DIN;
Surface Treatment: Polished;
Technique: Hot Rolled;
Application: Construction/Indutry/Building;
Stock: Stock;
Material: Stainless Steel;
MOQ: 1 Ton;
Price Term: CIF CFR Fob Ex-Work;
Length: as Required;
Width: 3mm-2000mm or as Required;
Thickness: 0.1mm-300mm or as Required;
Thickness Tolerance: ±0.01mm;
Shipment Time: Within 15-20 Workdays After Receiving Deposit or L;
|
Standard: ASTM, JIS, GB, AISI, DIN;
Surface Treatment: Polished;
Technique: Hot Rolled;
Application: Construction/Indutry/Building;
Stock: Stock;
Material: Stainless Steel;
MOQ: 1 Ton;
Price Term: CIF CFR Fob Ex-Work;
Length: as Required;
Width: 3mm-2000mm or as Required;
Thickness: 0.1mm-300mm or as Required;
Thickness Tolerance: ±0.01mm;
Shipment Time: Within 15-20 Workdays After Receiving Deposit or L;
|
Standard: ASTM, JIS, GB, AISI, DIN;
Surface Treatment: Polished;
Technique: Hot Rolled;
Application: Construction/Indutry/Building;
Stock: Stock;
Material: Stainless Steel;
MOQ: 1 Ton;
Price Term: CIF CFR Fob Ex-Work;
Length: as Required;
Width: 3mm-2000mm or as Required;
Thickness: 0.1mm-300mm or as Required;
Thickness Tolerance: ±0.01mm;
Shipment Time: Within 15-20 Workdays After Receiving Deposit or L;
|