Fan Hub
US$138.00 - 140.00 / Piece

Fan Hub 4915469, Replacement Part for K19 Nt855 Generator Set Video

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

1-29 Pieces US$140.00

30+ Pieces US$138.00

Sepcifications

  • Certification CCC, ISO9001
  • Standard Component Standard Component
  • Technics Press
  • Material Plastic
  • Type Fan Blades
  • Transport Package Wooden Box
  • Specification XX cm
  • Trademark cal-vol
  • Origin China
  • Number of Blades 6
  • Weight Xx Kg
  • Driving Form Engine
  • Max Speed Xx
  • Color Black

Product Description

Specification Our diesel generator flywheel hub is a critical, high - performance component. Engineered from premium alloy materials, it combines remarkable strength and lightweight design. The precisely machined structure ensures secure connection with the flywheel and crankshaft, enabling ...

Learn More

Fan Hub Comparison
Transaction Info
Price US$138.00 - 140.00 / Piece US$7.00 - 40.00 / Piece US$9.00 - 21.00 / Piece US$4.19 / Piece US$12.00 - 539.00 / Piece
Min Order 1 Piece 1 Piece 1 Piece 1 Piece 1 Piece
Payment Terms LC, T/T, PayPal, Western Union LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T LC, T/T, D/P, PayPal, Western Union, Small-amount payment
Quality Control
Product Certification CCC, ISO9001 ISO9001 ISO9001 ISO9001 ISO9001
Management System Certification - - - - -
Trade Capacity
Export Markets South America, Africa, Mid East, North America North America, Europe, Southeast Asia/ Mideast, Africa North America, Europe, Southeast Asia/ Mideast, Africa South America, Europe, Southeast Asia/ Mideast North America, Europe, Southeast Asia/ Mideast, Africa
Annual Export Revenue - - - - -
Business Model - Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM
Average Lead Time Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Product Attributes
Specification
Standard Component: Standard Component;
Technics: Press;
Material: Plastic;
Type: Fan Blades;
Number of Blades: 6;
Weight: Xx Kg;
Driving Form: Engine;
Max Speed: Xx;
Color: Black;
Standard Component: Standard Component;
Technics: Casting;
Material: Iron;
Type: High Pressure Fuel Pump;
Parts: Turbocharger;
Name: Fuel Injector;
Name II: Piston;
Name III: Cylinder Liner;
Name Iiii: Fuel Nozzle;
Standard Component: Standard Component;
Technics: Casting;
Material: Iron;
Type: High Pressure Fuel Pump;
Parts: Turbocharger;
Name: Fuel Injector;
Name II: Piston;
Name III: Cylinder Liner;
Name Iiii: Fuel Nozzle;
Standard Component: Standard Component;
Type: Rear Cover;
Quality: Good;
Performance: High;
Standard Component: Standard Component;
Technics: Casting;
Material: Iron;
Type: High Pressure Fuel Pump;
Parts: Turbocharger;
Name: Fuel Injector;
Name II: Piston;
Name III: Cylinder Liner;
Name Iiii: Fuel Nozzle;
Supplier Name

Yangzhou Fuduo Trading Co., Ltd.

Gold Member Audited Supplier

TIDE POWER TECHNOLOGY CO., LIMITED

Diamond Member Audited Supplier

TIDE POWER TECHNOLOGY CO., LIMITED

Diamond Member Audited Supplier

Shandong Huayuan Laidong Engine Co., Ltd.

Gold Member Audited Supplier

TIDE POWER TECHNOLOGY CO., LIMITED

Diamond Member Audited Supplier