Modular Multidirection System Scaffolding Ledgers Horizontals

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

100 Pieces US$3.00 - 20.00 / Piece

Sepcifications

  • Material Steel
  • Type Fixed
  • Structural Style Multi-Pole Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Projecting Scaffolding
  • Lapping Form Full Scaffolding
  • Erection Position External Scaffolding
  • Move Method Attached Lifting Scaffolding
  • Scaffolding Part Type Scaffolding Frames
  • Construction Properties Installation Scaffold
  • Transport Package Steel Pallet
  • Specification 0.6M/0.9M/1.2M/1.5M/1.8M/2.1M
  • Trademark HDRL
  • Origin China
  • Certification SGS/TUV
  • Surface Treatment Hop Dipped Galvanization

Product Description

INTRODUCTION: Ringlock scaffolding is one of the most popular types of scaffolding systems in the world. As a modular scaffolding system, it is extremely versatile and can be erected from the ground up or suspended. Ringlock scaffolding can also be erected in a stationary or rolling tower ...

Learn More

Horizontals Comparison
Transaction Info
Price US$3.00 - 20.00 / Piece US$9.05 - 14.20 / Piece US$20.00 - 25.00 / Piece US$10.00 - 20.00 / Piece US$20.00 - 25.00 / Piece
Min Order 100 Pieces 500 Pieces 200 Pieces 500 Pieces 200 Pieces
Payment Terms LC, T/T, PayPal, Western Union LC, T/T, D/P, PayPal, Small-amount payment LC, T/T LC, T/T LC, T/T
Quality Control
Product Certification SGS/TUV - CE, TUV, SGS CE CE, TUV, SGS
Management System Certification - ISO9001:2015, ISO14001, ISO45001:2018 - - -
Trade Capacity
Export Markets Europe, Southeast Asia/ Mideast, Domestic Europe North America, South America, Western Europe North America, South America, Western Europe North America, South America, Western Europe
Annual Export Revenue - - - - -
Business Model Own Brand, ODM, OEM ODM, OEM - - -
Average Lead Time Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Product Attributes
Specification
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Surface Treatment: Hop Dipped Galvanization;
After-sales Service: Online Technical Support;
Warranty: 5 Years;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Single Row Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Building Scaffold;
Inner Tube Diameter: 40mm, 48mm;
Outer Tube Diameter: 48mm, 56mm, 60mm;
Tube Thickness: 1.4-2.5mm, 1.4-4.0mm;
Weight: 7-30kg;
Surface Treatment: Galvanized;
Color: Customer Requirements;
MOQ: 500PCS;
After-sales Service: Customer Service;
Warranty: Year;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Building Scaffold;
Types: System Plank;
Standard: En74;BS1139;
Length: 3.07m/2.57m/2.07m/1.57m/1.40m/1.09m/0.73m;
After-sales Service: Customer Service;
Material: Steel;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Wall Hanging Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: Internal Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Ladder;
Construction Properties: Installation Scaffold;
Factory Certificate: ISO9001;
Surface Treatment: HDG, Electrogalvanizing;
Usage Scenario: Building Construction / Outdoor Expansion;
After-sales Service: Customer Service;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Building Scaffold;
Types: System Plank;
Standard: En74;BS1139;
Length: 3.07m/2.57m/2.07m/1.57m/1.40m/1.09m/0.73m;
Supplier Name

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

Diamond Member Audited Supplier

Linyi Consmos Imp. & Exp. Co., Ltd.

Diamond Member Audited Supplier

Wuxi Metec Metal Co., Ltd.

Diamond Member Audited Supplier

Wuxi Metec Metal Co., Ltd.

Diamond Member Audited Supplier

Wuxi Metec Metal Co., Ltd.

Diamond Member Audited Supplier