TM221CE24r PLC for Modicon 064877 Module, Logic Controller, Modicon M221, 24 Io Relay Ethernet

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$1,000.00 / Piece

Sepcifications

  • Task Program
  • Structure Closed-Loop
  • Mathematical Model Linear
  • Signal Continuous
  • Function Automatic Control, Protection, Monitoring, Measurement
  • Certification RoHS, CCC, ISO: 9001, CE
  • Condition New
  • Customized Non-Customized
  • Material Plastic
  • Transport Package Carton

Product Description

TM221CE24R PLC for Modicon 064877 Module Product Name PLC MODULE Model TM221CE24R Brand Modicon Place Of Origin France Condition 100% New Orginal Description The Modicon M580 ePAC (Programmable Automation Controllers) feature openness, flexibility, robustness and ...

Learn More

TM221CE24r Modicon PLC Comparison
Transaction Info
Price US$1,000.00 / Piece US$120.00 - 180.00 / Piece US$120.00 - 180.00 / Piece US$120.00 - 180.00 / Piece US$120.00 - 180.00 / Piece
Min Order 1 Piece 1 Piece 1 Piece 1 Piece 1 Piece
Payment Terms LC, T/T, D/P T/T T/T T/T T/T
Quality Control
Product Certification RoHS, CCC, ISO: 9001, CE - - ISO: 9001 ISO: 9001, CE
Management System Certification - - - - -
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model - - - - -
Average Lead Time Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Product Attributes
Specification
Task: Program;
Structure: Closed-Loop;
Mathematical Model: Linear;
Signal: Continuous;
Function: Automatic Control, Protection, Monitoring, Measurement;
Condition: New;
Customized: Non-Customized;
Material: Plastic;
Task: Adjust;
Structure: Closed-Loop;
Signal: Continuous;
Customized: Customized;
Type: Pressure, Temperature, Liquid Level;
Precision: 0.5%;
Environment Temperature: -20~70ºC;
Mounting Thread: M20*1.5;
Pressure Range: 0-0.1-100MPa;
Task: Adjust;
Structure: Closed-Loop;
Signal: Continuous;
Customized: Customized;
Type: Pressure, Temperature, Liquid Level;
Precision: 0.5%;
Environment Temperature: -20~70ºC;
Mounting Thread: M20*1.5;
Pressure Range: 0-0.1-100MPa;
Task: Adjust;
Structure: Closed-Loop;
Mathematical Model: Linear;
Signal: Continuous;
Function: Measurement;
Condition: New;
Customized: Customized;
Material: Stainless Steel;
Type: Pressure, Temperature, Liquid Level;
Precision: 0.5%;
Environment Temperature: -20~70ºC;
Mounting Thread: M20*1.5;
Pressure Range: 0-0.1-100MPa;
Task: Adjust;
Structure: Closed-Loop;
Mathematical Model: Linear;
Signal: Continuous;
Function: Measurement;
Condition: New;
Customized: Customized;
Material: Stainless Steel;
Type: Pressure, Temperature, Liquid Level;
Precision: 0.5%;
Environment Temperature: -20~70ºC;
Mounting Thread: M20*1.5;
Pressure Range: 0-0.1-100MPa;
Supplier Name

Guilin Sanhua Mechanical Electrical Automation Engineering Co., Ltd.

Diamond Member Audited Supplier

Chongqing Hongxing Instrument Co., Ltd.

Gold Member Audited Supplier

Chongqing Hongxing Instrument Co., Ltd.

Gold Member Audited Supplier

Chongqing Hongxing Instrument Co., Ltd.

Gold Member Audited Supplier

Chongqing Hongxing Instrument Co., Ltd.

Gold Member Audited Supplier