Specification |
Function: Hot Water Boiler;
Fuel: Electric Heating;
Installation: Packaged Boiler;
Structure: Water Tube;
Media: Hot Water;
Water Circulation: Natural Circulation;
Drum Placement: Vertical Boiler;
Pressure: Low Pressure;
Manufacturing Level: A;
Burning Style: Electric Heating;
Usage: Home, Greenhouse;
Voltage: 230V;
Input Power: 7.5kw;
Output Power: 7.35kw;
Current: 32.7A;
Breaker: 40A;
Size: 600*398*214mm;
Packing Size: 670*490*305mm;
Max.Outlet Water Temp(ºC): 85;
|
Function: Water Boiler, Steam Boilers, Oil Boiler;
Fuel: Gas-Fired;
Installation: Bulk Boiler;
Structure: Water Tube;
Media: Steam;
Water Circulation: Natural Circulation;
Drum Placement: Horizontal Boiler;
Pressure: Pressure;
Manufacturing Level: D;
Burning Style: Chamber Combustion Boiler;
Usage: Industrial, Power Station;
MOQ: 1;
Delivery Time: 45days;
Free Samples: No;
Model Type: Dss Type;
Steam Output Time: Reaches 0.8 MPa Within 3 Minutes;
Working Pressure: up to 0.8 MPa;
|
Function: Water Boiler, Steam Boilers, Oil Boiler;
Fuel: Gas-Fired;
Installation: Bulk Boiler;
Structure: Water Tube;
Media: Steam;
Water Circulation: Natural Circulation;
Drum Placement: Horizontal Boiler;
Pressure: Pressure;
Manufacturing Level: D;
Burning Style: Chamber Combustion Boiler;
Usage: Industrial, Power Station;
MOQ: 1;
Delivery Time: 45days;
Free Samples: No;
Model Type: Dss Type;
Steam Output Time: Reaches 0.8 MPa Within 3 Minutes;
Working Pressure: up to 0.8 MPa;
|
Function: Water Boiler, Steam Boilers, Oil Boiler;
Fuel: Gas-Fired;
Installation: Bulk Boiler;
Structure: Water Tube;
Media: Steam;
Water Circulation: Natural Circulation;
Drum Placement: Horizontal Boiler;
Pressure: Pressure;
Manufacturing Level: D;
Burning Style: Chamber Combustion Boiler;
Usage: Industrial, Power Station;
MOQ: 1;
Delivery Time: 45days;
Free Samples: No;
Model Type: Dss Type;
Steam Output Time: Reaches 0.8 MPa Within 3 Minutes;
Working Pressure: up to 0.8 MPa;
|
Function: Water Boiler, Steam Boilers, Hot Water Boiler, Oil Boiler, Hot Air Boiler;
Fuel: Oil-Fired;
Installation: Packaged Boiler;
Structure: Water Tube;
Media: Steam and Water;
Water Circulation: Mixed Circulation;
Drum Placement: Horizontal Boiler;
Pressure: High Pressure;
Manufacturing Level: A;
Burning Style: Cyclone Furnace;
Usage: Industrial, Vehicle, Power Station;
Special Pipe: Tube for Pressure Vessel;
Delivery Time: Within7- 30 Days;
Application: for The Heat-Transfer Equipment;
Treatment: Oil-DIP,Varnish,Passivation,Phosphating,Shot Blast;
Delivery Condition: Annealed, Normalized,Normalized and Tempered;
Inspections and Tests Performed: Ut,Rt,Et;
Aplication 1: Shipbuilding;
Aplication 2: Transportation;
Aplication 3: Metel Treatment System;
Aplication 4: Low Temperature Geberater Tube;
Materials: A192/A335/A179/A213/A312;
Standard and Grade: ASTM, ASME, JIS&DIN;
End Type: Plain Ends, Bevel End, Threaded End;
Technology: Cold Drawn, Colled Rolled, Hot Rolled;
|