Forged
US$1.00 / Piece
View

Stainless Steel High Pressure Forged Thd Mss Sp-83 Male Union for Pipe Fittings Video

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

20 Pieces US$1.00 / Piece

Sepcifications

  • Warranty 1 Year
  • Standard MSS SP-83
  • Technique Forged
  • Type Threaded Union
  • Material Stainless Steel
  • Connection Male
  • Transport Package Carton, Wooden Case
  • Specification 1/4"-2"
  • Origin Yan Cheng, China
  • Pressure 3000lb
  • Certificate Mss Sp-83 Table 5
  • Lead Time 25 to 35 Days
  • Delivery by Sea, by Air and by Express

Product Description

Stainless Steel High Pressure Forged Thread Male Union for Oil Gas Product Description Product thread union male forged pipe fittings Material F304L,F316L Contact type Thread Dimension Specification MSS SP-83 TABLE 5 Pressure 3000lb Temperature -20°C to +600°C Place of origin ...

Learn More

Forged Comparison
Transaction Info
Price US $ 1/ Piece US $ 0.60-3.00/ Piece US $ 0.17-71.90/ Piece US $ 0.17-71.90/ Piece US $ 4.62-5.70/ Piece
Min Order 20 Pieces 500 Pieces 5000 Pieces 5000 Pieces 1000 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P L/C, T/T, Western Union L/C, T/T, Western Union L/C, T/T, Western Union L/C, T/T, Western Union
Quality Control
Product Certification Mss Sp-83 Table 5 - - - -
Management System Certification - ISO 9001, HQE ISO 9001, HQE ISO 9001, HQE ISO 9001, HQE
Trade Capacity
Export Markets East Asia(Japan/ South Korea), Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic
Annual Export Revenue - - - - -
Business Model - OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time - Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Warranty: 1 Year;
Standard: MSS SP-83;
Technique: Forged;
Type: Threaded Union;
Material: Stainless Steel;
Connection: Male;
Pressure: 3000lb;
Lead Time: 25 to 35 Days;
Delivery: by Sea, by Air and by Express;
Standard: GB3289.37,3298.38-82;
Technique: Forged;
Nominal Diameter: DN20;
Type: Threaded Union;
Material: Copper;
Connection: Female;
Flexible or Rigid: Rigid;
Structure: Universal;
HS Code: 391740000;
Standard: GB3289.37,3298.38-82;
Material: PE;
Connection: Female;
Color: Grey;
Certification1: BS;
Certification2: En;
Certification3: ISO;
Usage: for Water Supply Engineering;
Material: PE;
Connection: Female;
Color: Grey;
Certification1: BS;
Certification2: En;
Certification3: ISO;
Usage: for Water Supply Engineering;
Standard: GB3289.37,3298.38-82;
Technique: Casting;
Nominal Diameter: 110mm;
Type: Socket Union;
Material: UPVC;
Connection: Glue Socket;
Color: White Grey Black;
Pressure: Pn10;
Application: Water Supply;
Connection Type: Glue;
Usage: Water Supply;
Supplier Name

Yancheng Jicheng Machinery Co., Ltd

China Supplier - Gold Member Audited Supplier

CHANGZHOU XITA PLASTIC CO., LTD.

China Supplier - Diamond Member Audited Supplier

CHANGZHOU XITA PLASTIC CO., LTD.

China Supplier - Diamond Member Audited Supplier

CHANGZHOU XITA PLASTIC CO., LTD.

China Supplier - Diamond Member Audited Supplier

CHANGZHOU XITA PLASTIC CO., LTD.

China Supplier - Diamond Member Audited Supplier