Cuplock Scaffolding System Components Side Bracket/ Hop up Brackets System

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

500 Pieces US$5.00 - 20.00 / Piece

Sepcifications

  • Material Steel
  • Type Fixed
  • Structural Style Multi-Pole Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Projecting Scaffolding
  • Lapping Form Double Scaffolding
  • Erection Position Internal Scaffolding
  • Move Method Attached Lifting Scaffolding
  • Scaffolding Part Type Single Board Support
  • Construction Properties Installation Scaffold
  • Transport Package Steel Pallets
  • Specification ISO9001: 2008
  • Trademark LARS
  • Origin China

Product Description

Hop Up Brackets are also basic part of Scaffolds system, Designed to increase the overall width of the working platform by supporting additional boards beyond the inner face of the scaffolding. They incoporate a cup joint at the outside end to allow the fitting of an insie ledger which links the ...

Learn More

Omega Hop UPS Comparison
Transaction Info
Price US$5.00 - 20.00 / Piece US$10.00 - 20.00 / Piece US$10.00 - 20.00 / Piece US$10.00 - 20.00 / Piece US$10.00 - 15.00 / Piece
Min Order 500 Pieces 500 Pieces 500 Pieces 500 Pieces 500 Pieces
Payment Terms T/T, LC, D/P LC, T/T LC, T/T LC, T/T LC, T/T
Quality Control
Product Certification - CE, SGS, TUV CE,ISO9001,TUV,SGS,Ect. CE,ISO9001,TUV,SGS,Ect. CE,ISO9001,Ect
Management System Certification - - - - -
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Western Europe North America, South America, Western Europe North America, South America, Western Europe North America, South America, Western Europe
Annual Export Revenue - - - - -
Business Model - - - - -
Average Lead Time Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Product Attributes
Specification
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: Internal Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Single Board Support;
Construction Properties: Installation Scaffold;
After-sales Service: Customer Service;
Material: Steel;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Wall Hanging Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: Internal Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Ringlock System Scaffolding;
Construction Properties: Building Scaffold;
Factory Certification: ISO9001;
Steel Class: Q235/Q345;
After-sales Service: Customer Service;
Material: Steel;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Wall Hanging Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: Internal Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: System;
Construction Properties: Building Scaffold;
Steel Class: Q234, Q345;
Finsihed: HDG;
After-sales Service: Customer Service;
Material: Steel;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Wall Hanging Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: Internal Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: System;
Construction Properties: Building Scaffold;
Steel Class: Q234, Q345;
Finsihed: HDG;
After-sales Service: Customer Service;
Warranty: Year;
Material: Steel;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Wall Hanging Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: Internal Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Building Scaffold;
Steel Class: Q234/Q345;
Finished: HDG;
Supplier Name

Laian Golden Resource Metalwork Co., Ltd

Diamond Member Audited Supplier

Wuxi Metec Metal Co., Ltd.

Diamond Member Audited Supplier

Wuxi Metec Metal Co., Ltd.

Diamond Member Audited Supplier

Wuxi Metec Metal Co., Ltd.

Diamond Member Audited Supplier

Wuxi Metec Metal Co., Ltd.

Diamond Member Audited Supplier