High Tech and Remote Controllable Shuttle Kiln with Comprehensive Monitoring Functions

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 set US$100,000.00 - 500,000.00 / set

Sepcifications

  • After-sales Service Yes
  • Warranty Under The Contract
  • Transport Package Customized
  • Specification Depends on the product
  • Origin China
  • Name Regenerative Burners/Shuttle Kiln/Moving Hoo
  • Automation Fully Automatic or Semi-Automatic
  • Raw Material Clay/ Earth Soil/ Mud/ Shale/Coal Gangue
  • Fuel Natural Gas/Coal/Furnace Oil/Biomass Gas

Product Description

Product Description Regenerative Shuttle Kiln 1) Heat storage furnace to improve the combustion temperature so that the heat transfer efficiency is gradually improved, heat storage combustion technology can be preheated to 1000 ° C above the medium, the furnace flame temperature rises, ...

Learn More

Shuttle Kiln Comparison
Transaction Info
Price US$100,000.00 - 500,000.00 / set US$50,000.00 - 300,000.00 / Piece US$10,000.00 - 20,000.00 / Piece US$2,000.00 - 3,000.00 / Piece US$50,000.00 - 300,000.00 / Piece
Min Order 1 set 1 Piece 1 Piece 1 Piece 1 Piece
Payment Terms LC, T/T LC, T/T LC, T/T LC, T/T LC, T/T
Quality Control
Management System Certification - - - - -
Trade Capacity
Export Markets Southeast Asia/ Mideast North America, South America, Southeast Asia/ Mideast, Africa, Domestic North America, South America, Southeast Asia/ Mideast, Africa, Domestic North America, South America, Southeast Asia/ Mideast, Africa, Domestic North America, South America, Southeast Asia/ Mideast, Africa, Domestic
Annual Export Revenue - - - - -
Business Model Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM
Average Lead Time Peak Season Lead Time: 1-3 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 1-3 months
Product Attributes
Specification
After-sales Service: Yes;
Warranty: Under The Contract;
Name: Regenerative Burners/Shuttle Kiln/Moving Hoo;
Automation: Fully Automatic or Semi-Automatic;
Raw Material: Clay/ Earth Soil/ Mud/ Shale/Coal Gangue;
Fuel: Natural Gas/Coal/Furnace Oil/Biomass Gas;
Casting Bench Length: 18-30m;
Mold: Spagless Plaster Mold;
Mold Carrier: 30sets;
PLC: Siemens;
Electric Elements: Omron;
Casting Pipe: 304 Stainless Steel;
Casting Method: Auto;
Product: Two Piece Water Closet;
Storage Green Base Line: One Layer;
Mold Lifting Method: Hydraulic Sling Lifting;
Power: 5.5 Kw;
Rpm: 960rpm/Min;
Power: 1.1kw;
Rpm: 400rpm/Min;
Casting Bench Length: 18-30m;
Mold: Spagless Plaster Mold;
Mold Carrier: 30sets;
PLC: Siemens;
Electric Elements: Schneider or Omron;
Casting Pipe: 304 Stainless Steel;
Casting Method: Auto;
Product: One Piece Water Closet;
Storage Green Base Line: One Layers;
Mold Lifting Method: Hydraulic Sling Lifting;
Supplier Name

Foshan Linkcon Thermal Technology Co., Ltd.

Diamond Member Audited Supplier

Tangshan Hexiang Intelligent Technology Co., Ltd.

Diamond Member Audited Supplier

Tangshan Hexiang Intelligent Technology Co., Ltd.

Diamond Member Audited Supplier

Tangshan Hexiang Intelligent Technology Co., Ltd.

Diamond Member Audited Supplier

Tangshan Hexiang Intelligent Technology Co., Ltd.

Diamond Member Audited Supplier