Reusable Plastic Formwork for Beam Column and Foundation Projects

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

100-499 Pieces US$15.00

500-999 Pieces US$9.90

1,000+ Pieces US$8.90

Sepcifications

  • After-sales Service Online Installation Guidance
  • Warranty 1 Year
  • Certification ISO, ROHS, CE
  • Material Plastic
  • Type Wall Formwork
  • Transport Package Sea Freight
  • Trademark Shuangyang
  • Origin China Hebei
  • Reinforcement Design with/Without
  • Surface Finish Smooth, Textured
  • Max Load Capacity 50 kN/M²
  • Application Area Wall, Column, Beam, Slab
  • Connection Type Interlocking, Clip-on
  • Weight Per Sheet 12 Kg
  • Packing Method Stacked, Bundled, Wooden Crate
  • Application Scenario High-Rise Building, Bridge, Tunnel, Residential
  • Storage Condition Keep Dry, Avoid Direct Sunlight
  • Color Blue, Gray, Black
  • Customizable Size, Color, Thickness Customizable

Product Description

Product Description Plastic formwork Plastic formwork is a modern construction formwork system made from high-quality engineered plastics, designed to replace traditional wood or steel formwork. It is lightweight, durable, reusable, and highly resistant to water, corrosion, and chemical damage. ...

Learn More

Plastic Formwork Construction Molds Comparison
Transaction Info
Price US$8.90 - 15.00 / Piece US$109.00 - 161.00 / Piece US$0.02 - 0.20 / Piece US$30.00 - 165.00 / Piece US$30.00 - 165.00 / Piece
Min Order 100 Pieces 1 Piece 1 Piece 1 Piece 1 Piece
Payment Terms LC, T/T, D/P, PayPal, Western Union, Small-amount payment T/T LC, T/T, D/P, PayPal, Western Union, Small-amount payment T/T T/T
Quality Control
Product Certification ISO, ROHS, CE ISO SGS/ISO ISO, CE ISO, CE
Management System Certification - - - - -
Trade Capacity
Export Markets North America, South America, Africa Europe, East Asia(Japan/ South Korea) North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe Europe, East Asia(Japan/ South Korea) Europe, East Asia(Japan/ South Korea)
Annual Export Revenue - - - - -
Business Model ODM, OEM Own Brand, ODM, OEM - Own Brand, ODM, OEM Own Brand, ODM, OEM
Average Lead Time Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: one month
Off Season Lead Time: one month
Product Attributes
Specification
After-sales Service: Online Installation Guidance;
Warranty: 1 Year;
Material: Plastic;
Type: Wall Formwork;
Reinforcement Design: with/Without;
Surface Finish: Smooth, Textured;
Max Load Capacity: 50 kN/M²;
Application Area: Wall, Column, Beam, Slab;
Connection Type: Interlocking, Clip-on;
Weight Per Sheet: 12 Kg;
Packing Method: Stacked, Bundled, Wooden Crate;
Application Scenario: High-Rise Building, Bridge, Tunnel, Residential;
Storage Condition: Keep Dry, Avoid Direct Sunlight;
Color: Blue, Gray, Black;
Customizable: Size, Color, Thickness Customizable;
After-sales Service: Provide After Sale Service;
Warranty: Provide After Sale Service;
Material: Steel;
Type: Beam Formwork;
Certificated: ISO9001;
Steel: Q235/Q355;
Finished: HDG/Painted;
Usage: Formwork;
Function: Shoring System;
After-sales Service: 2 Years;
Warranty: Remote or on-Site Technical Support;
Material: Steel;
Type: Column Formwork;
Sruface Treatment: Galvanized/Black;
Steel Grade: Q195/ Q235/45#;
MOQ: 1PCS;
OEM: Available/Customized;
Application: Formwork;
Advantage: Strong Strength;
After-sales Service: Provide After Sale Service;
Warranty: Provide After Sale Service;
Material: Steel;
Type: Beam Formwork;
Steel: Q235/Q355;
Finished: HDG;
Delivery Term: 45 Days;
Container: FCL/LCL;
Function: Shoring System;
Usage: Building Material/Construction;
Formwork: Base Formwork/Climbing Formwork;
After-sales Service: Provide After Sale Service;
Warranty: Provide After Sale Service;
Material: Steel;
Type: Beam Formwork;
Steel: Q235/Q355;
Finished: HDG;
Delivery Term: 45 Days;
Container: FCL/LCL;
Function: Shoring System;
Usage: Building Material/Construction;
Formwork: Base Formwork/Climbing Formwork;
Supplier Name

Laoting Zhuozhan International Trade Co., Ltd.

Diamond Member Audited Supplier

Taishan Dongkuo Steel Structure Co., Ltd.

Gold Member Audited Supplier

Tianjin Huayou Scaffolding Co., Ltd.

Diamond Member Audited Supplier

Taishan Dongkuo Steel Structure Co., Ltd.

Gold Member Audited Supplier

Taishan Dongkuo Steel Structure Co., Ltd.

Gold Member Audited Supplier