Customlizable Jack Base Using in Scaffolding

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

2,000 Pieces US$3.30 - 4.10 / Piece

Sepcifications

  • Material Steel
  • Type Fixed
  • Structural Style Multi-Pole Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Projecting Scaffolding
  • Lapping Form Double Scaffolding
  • Erection Position External Scaffolding
  • Move Method Attached Lifting Scaffolding
  • Scaffolding Part Type Scaffolding Props
  • Construction Properties Building Scaffold
  • Transport Package Woven Bag+Steel Pallet
  • Specification 34/38mm
  • Trademark weijie
  • Origin China
  • Technic Cold or Hot Rolled and Welding
  • Size 1 34mm*4mm*600mm
  • Size 2 38mm*4mm*600mm
  • Nut 34/38mm Nut
  • Raw Material Q235 Steel
  • Market All Over The World
  • Marking as Customer Request
  • Surface Treat Zinc Plate/Hot DIP Galvanize
  • Delivery 30days After Receive Deposit
  • Package Woben Bags+ Steel Pallet
  • Certificate ISO9001:2015, SGS,Sigma
  • Standard En74, BS1139
  • Scaffolding Parts Screw Jack Base
  • Construction Screw Jacks

Product Description

1. Product information Name HDG/electro galvanized construction pipe screw jack base Techniques hot or cold rolled and welding Size 34/38mm or according to the client needs Length 600/750mm,or according to the client needs Surface treatment HDG or electro galvanized Weight 3.4-3.9 kg ...

Learn More

U Head Jack Base Comparison
Transaction Info
Price US$3.30 - 4.10 / Piece US$220.00 - 225.00 / Meter US$220.00 - 225.00 / Meter US$220.00 - 225.00 / Meter US$220.00 - 225.00 / Meter
Min Order 2,000 Pieces 6 Meters 6 Meters 6 Meters 6 Meters
Payment Terms LC, T/T, D/P, PayPal, Western Union, Small-amount payment T/T, Western Union T/T, Western Union T/T, Western Union T/T, Western Union
Quality Control
Product Certification ISO9001:2015, SGS,Sigma - - - -
Management System Certification - - - - -
Trade Capacity
Export Markets Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM
Average Lead Time Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Product Attributes
Specification
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Building Scaffold;
Technic: Cold or Hot Rolled and Welding;
Size 1: 34mm*4mm*600mm;
Size 2: 38mm*4mm*600mm;
Nut: 34/38mm Nut;
Raw Material: Q235 Steel;
Market: All Over The World;
Marking: as Customer Request;
Surface Treat: Zinc Plate/Hot DIP Galvanize;
Delivery: 30days After Receive Deposit;
Package: Woben Bags+ Steel Pallet;
Standard: En74, BS1139;
Scaffolding Parts: Screw Jack Base;
Construction: Screw Jacks;
Material: Aluminum;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Wheels;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Model No: Sdw-01 Scaffolding;
Size: 1.35*2m;
Main Tube: 51*2mm;
Platform Load: 272kg;
Whole Load: 900kg;
Height: Custom;
Application: Indoor Outdoor;
Scaffold Boards: Scaffold;
for Sale Scaffolding: Scaffolding for Sale;
Scaffolder: Scaffold Tower;
Scaffolding Parts: Scaffolding Vygotsky;
Scaffold Planks: Scaffolding with Ladders;
Scaffold Aluminum: Mobile Scaffold;
Scaffold Pole: Scaffold Clamp;
Scaffolding Clamp: Scaffold for Sale;
Material: Aluminum;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Wheels;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Model No: Sdw-01 Scaffolding;
Size: 1.35*2m;
Main Tube: 51*2mm;
Platform Load: 272kg;
Whole Load: 900kg;
Height: Custom;
Application: Indoor Outdoor;
Scaffold Boards: Scaffold;
for Sale Scaffolding: Scaffolding for Sale;
Scaffolder: Scaffold Tower;
Scaffolding Parts: Scaffolding Vygotsky;
Scaffold Planks: Scaffolding with Ladders;
Scaffold Aluminum: Mobile Scaffold;
Scaffold Pole: Scaffold Clamp;
Scaffolding Clamp: Scaffold for Sale;
Material: Aluminum;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Wheels;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Model No: Sdw-01 Scaffolding;
Size: 1.35*2m;
Main Tube: 51*2mm;
Platform Load: 272kg;
Whole Load: 900kg;
Height: Custom;
Application: Indoor Outdoor;
Scaffold Boards: Scaffold;
for Sale Scaffolding: Scaffolding for Sale;
Scaffolder: Scaffold Tower;
Scaffolding Parts: Scaffolding Vygotsky;
Scaffold Planks: Scaffolding with Ladders;
Scaffold Aluminum: Mobile Scaffold;
Scaffold Pole: Scaffold Clamp;
Scaffolding Clamp: Scaffold for Sale;
Material: Aluminum;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Wheels;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Model No: Sdw-01 Scaffolding;
Size: 1.35*2m;
Main Tube: 51*2mm;
Platform Load: 272kg;
Whole Load: 900kg;
Height: Custom;
Application: Indoor Outdoor;
Scaffold Boards: Scaffold;
for Sale Scaffolding: Scaffolding for Sale;
Scaffolder: Scaffold Tower;
Scaffolding Parts: Scaffolding Vygotsky;
Scaffold Planks: Scaffolding with Ladders;
Scaffold Aluminum: Mobile Scaffold;
Scaffold Pole: Scaffold Clamp;
Scaffolding Clamp: Scaffold for Sale;
Supplier Name

Shandong Pinzheng Metal Products Co., Ltd.

Gold Member Audited Supplier

FOSHAN DRAGON STAGE EQUIPMENT CO.,LTD

Diamond Member Audited Supplier

FOSHAN DRAGON STAGE EQUIPMENT CO.,LTD

Diamond Member Audited Supplier

FOSHAN DRAGON STAGE EQUIPMENT CO.,LTD

Diamond Member Audited Supplier

FOSHAN DRAGON STAGE EQUIPMENT CO.,LTD

Diamond Member Audited Supplier