Charging Module
US$600.00 / pcs
  • Recommend for you
  • What is 142kw Three in One DC Fast Charger 60kw CCS+60kw Chademo+AC42kw Battery Charging Station CE Certification EV Charging Station
  • What is 30kw 40kw 60kw 80kw 100kw 120kw 140kw 160kw 200kw Single or Double Guns CCS1 CCS2 Chademo Gbt EV Charger Charging Station Support OPP1.6j
  • What is 40kw Class B Electric Vehicle on Board Power Supply Module/ Charging Rectifier/ Charger Station for EV DC Fast Charging Module

What is Charging Moduleev Chargerac/DC Conversion Module

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

10 pcs US$600.00 / pcs

Sepcifications

  • Trademark TONHE
  • Origin China
  • Certification CE, ISO

Product Description

Input features Item Parameters Remark Operating Voltage(AC) 285~475V,rated voltage380V See input voltage/output power 1.3.3-1 Input Frequency(HZ) 45~55 Power Factor Full load≥0.99 THD Full load≤5% Standby Power Consumption <12W Input voltage/output power curve ...

Learn More

Charging Module Comparison
Transaction Info
Price US$600.00 / pcs US$190.00 / Piece US$190.00 / Piece US$2,400.00 - 3,600.00 / Piece US$19,000.00 - 24,999.00 / Piece
Min Order 10 pcs 5 Pieces 5 Pieces 1 Piece 1 Piece
Payment Terms - LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment T/T, LC, D/P, PayPal, Western Union, Small-amount payment
Quality Control
Product Certification CE, ISO - - - CE
Management System Certification - - - - ISO9001:2015, ISO45001:2018, ISO14001, Others
Trade Capacity
Export Markets - Europe Europe Europe Europe, Domestic
Annual Export Revenue - - - - -
Business Model - - - - Own Brand, ODM, OEM
Average Lead Time - Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: one month
Off Season Lead Time: one month
Product Attributes
Specification
Number of Charging Interfaces: One Pile with One Charge;
Location: Private Use;
Installation: Wall Mounted;
Charge Method: Normal Charge;
Connectortype: Type 1,Type 2;
Cable Length: 5m;
Protection Level: IP54;
Operating Temperature: ~-30c to +60c;
Number of Charging Interfaces: One Pile with One Charge;
Location: Private Use;
Installation: Wall Mounted;
Charge Method: Normal Charge;
Connectortype: Type 1,Type 2;
Cable Length: 5m;
Protection Level: IP54;
Operating Temperature: ~-30c to +60c;
Number of Charging Interfaces: One Pile with One Charge;
Location: Private Use;
Charge Method: Quick Charge;
Rated Output Voltage: DC200-750V DC50-1000V;
Communication Protocol: Ocpp/RFID;
Connector Type: CCS/Chademo/Gbt;
Operating Temperature: ~-30c to +60c;
Protection Level: IP54;
Power: DC 20kw/30kw/40kw;
Number of Charging Interfaces: One Pile with Multiple Charges;
Location: Public Use;
Installation: Floor Type;
Charge Method: Quick Charge;
Input Power Connection: 3pH+N+PE(L1, L2, L3, N, PE);
Charging Connector: CCS2*2;
Rated Power: 180kw;
Cable Length: Nominal 5 Meters;
HMI: 7 Inch LCD Touch Screen;
Signal Indicator: Green (Power), Red (Charging), Orange(Fault);
Connector Standard: IEC 62196 (Combo CCS 2);
Safety Standards: En 61851-23: 2014 & En 61851-1: 2010 IEC 61851-1:;
EMC Standards: IEC 61851-21-2: 2018;
EV Compliance: DIN 70121 / ISO 15118;
Back-End Communication Protocol: Ocpp1.6;
Internet Connection: 4G / Ethernet (Ethernet);
Dimensions: 750 (W)&times; 750 (D) &times; 1800 (H) mm;
Weight: 405kgs;
Supplier Name

Shijiazhuang Tonhe Electronics Technologies Co., Ltd.

Diamond Member Audited Supplier

Zhejiang Sinray Electronics Co., Ltd.

Gold Member Audited Supplier

Zhejiang Sinray Electronics Co., Ltd.

Gold Member Audited Supplier

Zhejiang Sinray Electronics Co., Ltd.

Gold Member Audited Supplier

Hangzhou Aoneng Power Supply Equipment Co., Ltd.

Diamond Member Audited Supplier