Tp4056 1A
US$0.20 - 0.45 / Piece
  • Recommend for you
  • What is D1 WiFi Uno Development Board Esp8266 for Arduino IDE
  • What is Ad9850 Dds Signal Generator Module Sine Wave Square Wave Generator Development Board
  • What is MP3 Bluetooth 5.0 Decoding Board Lossless Car Speaker Audio Amplifier Board Modification of DIY Audio Receiving 4.1 Module

What is Type-C USB Interface Charging Protection Combo Tp4056 1A Lithium Battery Charging Board Module

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

10 Pieces US$0.20 - 0.45 / Piece

Product Description

Module features and parameters: 1. This board has charging function and battery discharge protection function. 2. Input with TYPE C USB female 3. You can directly use the mobile phone charger to input the lithium battery. 4. And still have input voltage wiring solder joints, which can be very ...

Learn More

Tp4056 1A Comparison
Transaction Info
Price US$0.20 - 0.45 / Piece US$64.00 - 320.00 / Piece US$40.00 - 130.00 / Piece Negotiable US$20.00 / Piece
Min Order 10 Pieces 1 Piece 1 Piece 100 Pieces 1 Piece
Payment Terms T/T, PayPal LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union LC, T/T, PayPal LC, T/T, PayPal
Quality Control
Product Certification - ISO - - -
Management System Certification Others - - - -
Trade Capacity
Export Markets South America, Europe North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea) North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea)
Annual Export Revenue - - - - -
Business Model - Own Brand, ODM, OEM ODM, OEM ODM, OEM ODM, OEM
Average Lead Time Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays, one month, 1-3 months
Off Season Lead Time: within 15 workdays, one month, 1-3 months
Peak Season Lead Time: within 15 workdays, one month, 1-3 months
Off Season Lead Time: within 15 workdays, one month, 1-3 months
Product Attributes
Specification
Transmission Type: Flexible;
Automatic Production Line: Assembly;
Automation: Automation;
Flexible Production: Concurrent Engineering;
Rhythm: Flow Production Line;
Production Scope: Product Line;
Brand: Juki;
P/N: 6604071;
Dielectric: FR-1;
Dielectric: AIN;
Dielectric: AIN;
Supplier Name

Shenzhen Wonderwing Electronics., Ltd.

Gold Member Audited Supplier

Qinyi Electronics Co., Ltd.

Diamond Member Audited Supplier

Shenzhen Tongchuang Xin Electronic Circuit Co., Ltd

Gold Member Audited Supplier

Adena Ceramics International LLC (Shanghai)

Gold Member Audited Supplier

Adena Ceramics International LLC (Shanghai)

Gold Member Audited Supplier