Versatile Terminal Busbar
US$4.50 - 7.00 / Piece
  • Recommend for you
  • What is Customizable Electric Busbar Systems for Enhanced Energy Efficiency
  • What is Copper Connection Busbar Electric Waterproof Copper Busbar for Automotive
  • What is Premium Copper Bus Bars for Optimal Electrical Performance

What is Versatile Grounding Busbar for Reliable Terminal Block Solutions

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

300-1,999 Pieces US$7.00

2,000-4,999 Pieces US$5.50

5,000+ Pieces US$4.50

Sepcifications

  • Surface Treatment Nickel Plated
  • Transport Package Palletizing
  • Specification Customize
  • Trademark Customize
  • Origin Zhangzhou, Fujian
  • Material Copper
  • Size Customized
  • Tolerances International Standard
  • Drawing Customer Supplied /Customized
  • Customization Support
  • Samples Support
  • Sample Delivery 10-20 Days
  • Quality 100% Inspection Before Shipping
  • Shipping Way by Sea/by Air/Express
  • Application Electrical Vehicle,Photovoltaic,Power Grid
  • Delivery Time According to The Quantity
  • Packing Carton Packaging, PVC Bag with a Label

Product Description

Company Profile Established on November 22, 2010, Zhangzhou Neer Electronic Technology Co., Ltd. stands as a beacon of innovation and excellence in the realm of new energy. Nestled in Building 6, No.58 Jiaosong Road, Jiaomei Town, within the Zhangzhou Taiwan Business Investment Zone of Fujian ...

Learn More

Versatile Terminal Busbar Comparison
Transaction Info
Price US$4.50 - 7.00 / Piece US$2.99 - 4.99 / Piece US$2.99 - 4.99 / Piece US$2.99 - 4.99 / Piece US$3.00 - 50.00 / Piece
Min Order 300 Pieces 5 Pieces 5 Pieces 5 Pieces 2 Pieces
Payment Terms T/T, LC LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment T/T, PayPal, Western Union
Quality Control
Product Certification - RoHS RoHS RoHS RoHS, REACH, ISO9001, IATF 16949
Management System Certification ISO14001, Others - - - -
Trade Capacity
Export Markets Domestic Southeast Asia/ Mideast Southeast Asia/ Mideast Southeast Asia/ Mideast North America, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model ODM, OEM ODM, OEM ODM, OEM ODM, OEM -
Average Lead Time Peak Season Lead Time: within 15 workdays, one month
Off Season Lead Time: within 15 workdays, one month
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
-
Product Attributes
Specification
Surface Treatment: Nickel Plated;
Material: Copper;
Size: Customized;
Tolerances: International Standard;
Drawing: Customer Supplied /Customized;
Customization: Support;
Samples: Support;
Sample Delivery: 10-20 Days;
Quality: 100% Inspection Before Shipping;
Shipping Way: by Sea/by Air/Express;
Application: Electrical Vehicle,Photovoltaic,Power Grid;
Delivery Time: According to The Quantity;
Packing: Carton Packaging, PVC Bag with a Label;
Surface Treatment: Nickel Plated;
Material: T2 Pure Copper, Aluminum;
Usage: Car, Motor etc, Solar Battery, Inventer;
Application: Electric Power Distribution, Battery;
MOQ: 100;
Key Words: Plug-in Electric Busbar;
OEM: Yes;
ODM: Yes;
Customization Service: Yes;
Delivery Time: 20-30 Days;
Packaging: Carton Box + Wooden Frame;
Surface Treatment: Nickel Plated;
Material: T2 Pure Copper, Aluminum;
Usage: Car, Motor etc, Solar Battery, Inventer;
Application: Electric Power Distribution, Battery;
MOQ: 100;
Key Words: Plug-in Electric Busbar;
OEM: Yes;
ODM: Yes;
Customization Service: Yes;
Delivery Time: 20-30 Days;
Packaging: Carton Box + Wooden Frame;
Surface Treatment: Nickel Plated;
Material: T2 Pure Copper, Aluminum;
Usage: Car, Motor etc, Solar Battery, Inventer;
Application: Electric Power Distribution, Battery;
MOQ: 100;
Key Words: Plug-in Electric Busbar;
OEM: Yes;
ODM: Yes;
Customization Service: Yes;
Delivery Time: 20-30 Days;
Packaging: Carton Box + Wooden Frame;
Surface Treatment: Nickel Plated;
Finish: Bare, Tin Plating, Nickel Plating;
Insulation: Plastic Overmolded;
Material: T2 Copper;
Flammability: UL 94V0;
Supplier Name

Zhangzhou NEER New Energy Technology Co., Ltd.

Diamond Member Audited Supplier

G and N Fortune Limited

Diamond Member Audited Supplier

G and N Fortune Limited

Diamond Member Audited Supplier

G and N Fortune Limited

Diamond Member Audited Supplier

Huizhou Jindu Technology Co.,Ltd.

Gold Member Audited Supplier