Professional Plastic Mold Manufacturing Factory Plastic Moulding Price

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$1,000.00 / Piece

Sepcifications

  • Shaping Mode Injection Mould
  • Mould Cavity Single Cavity
  • Plastic Material PP,PVC
  • Process Combination Type Single-Process Mode
  • Runner Hot Runner
  • Design Software AutoCAD
  • Standard HASCO
  • Customized Customized
  • Transport Package Wooden Case
  • Origin Taizhou Zhejiang China
  • Package Wooden Case
  • Port1 Shanghai
  • Port2 Ningbo

Product Description

Mold Name Plastic bowl Mould Mold Material P20 / 718 / 2738 / H13 / S136 / NAK80 Material Hardness HRC28 - HRC60 Material Treatment Quenching / Nitrided / Heat Mold Surface Texture / Mirror polish / Customizable Mold Base DME / LKM / HASCO / LOCAL Products Material PP / PE / PA / PS / ...

Learn More

Plastic Basin Mould Comparison
Transaction Info
Price US $ 1000/ Piece US $ 5,000.00-10,000.00/ Piece US $ 2,000.00-2,500.00/ Set US $ 20,000.00-100,000.00/ Piece US $ 20,000.00-100,000.00/ Piece
Min Order 1 Pieces 1 Pieces 1 Sets 1 Pieces 1 Pieces
Trade Terms - FOB, EXW - FOB, EXW FOB, EXW
Payment Terms L/C, T/T, Paypal T/T, Western Union L/C, T/T, D/P, Paypal, Money Gram, Cash & Credit T/T, Western Union T/T, Western Union
Quality Control
Product Certification - - SGS , BV - -
Management System Certification ISO 9001 - ISO 9001, ISO 9000 - -
Trade Capacity
Export Markets Domestic North America, South America, Europe, Southeast Asia/ Mideast Southeast Asia/ Mideast, Africa North America, South America, Europe, Southeast Asia/ Mideast North America, South America, Europe, Southeast Asia/ Mideast
Annual Export Revenue - - - - -
Business Model - OEM, ODM OEM, ODM, Others OEM, ODM OEM, ODM
Average Lead Time Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
Shaping Mode: Injection Mould;
Mould Cavity: Single Cavity;
Plastic Material: PP,PVC;
Process Combination Type: Single-Process Mode;
Runner: Hot Runner;
Design Software: AutoCAD;
Standard: HASCO;
Customized: Customized;
Package: Wooden Case;
Port1: Shanghai;
Port2: Ningbo;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Commodity;
Runner: Hot Runner;
Design Software: UG;
Installation: Fixed;
Standard: HASCO;
Customized: Customized;
Size: 350X200X180mm;
Mould Life: 800k Shots;
Mould Material: P20, 718, H13...;
Tooling Time: 35days;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Process Combination Type: Single-Process Mode;
Application: Commodity, Home Use;
Runner: Hot Runner;
Design Software: UG;
Installation: Fixed;
Standard: HASCO;
Customized: Customized;
Item Name: Hot Runner Mould Structure Injection Plastic Spoon;
Mould Design: 2D&3D;
Mould Material: P20 & 718;
Item Material: PP;
Cavity No.: 10/16/18/24/28/30/32..;
Mould Struction: Big Gate;
Runner Design: Cold;
Cycle Time: Average 45 Second;
Packing: Export Wooden Case;
Payment Terms: 50% & 50%;
Warranty: 2 Years;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PE;
Process Combination Type: Single-Process Mode;
Application: Commodity;
Runner: Hot Runner;
Design Software: UG;
Installation: Manual Installation;
Standard: HASCO;
Customized: Customized;
Size: 495X400X410mm;
Material: PP;
Lead Time: 35days;
Shippment: by Sea;
Item: Storage Box Mould;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PE;
Process Combination Type: Single-Process Mode;
Application: Commodity;
Runner: Hot Runner;
Design Software: UG;
Installation: Manual Installation;
Standard: HASCO;
Customized: Customized;
Size: 495X400X410mm;
Material: PP;
Item: Box Mould;
Brand: OEM;
Lead Time: 35days;
Supplier Name

Taizhou Huangyan Jishun Molding Co., Ltd

China Supplier - Gold Member Audited Supplier

ZHEJIANG MELEE MOULD CO., LTD.

China Supplier - Diamond Member Audited Supplier

TAIZHOU GREEN MOULD PLAST CO., LTD.

China Supplier - Diamond Member Audited Supplier

ZHEJIANG MELEE MOULD CO., LTD.

China Supplier - Diamond Member Audited Supplier

ZHEJIANG MELEE MOULD CO., LTD.

China Supplier - Diamond Member Audited Supplier