Frame Scaffolding
US$10.99-24.99 / Piece
View
  • Recommend for you
  • What is Construction Galvanized Ringlock Scaffold Diagonales
  • What is Scaffolding Material Construction Frame Scaffolding Office Building Warehouse Adto Group
  • What is Building Material S235 Pipe BS Pipe 48.3mm Carbon Steel Pipe Scaffold Tube Steel Tube ASTM Welded Pipe Galvanized Tube Gi Pipe Galvanized ERW En39 Steel Pipe

How to Install 4′ X6′ Shoring Frame Scaffolding 10K H. L.

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

100 Pieces US$10.99-24.99 / Piece

Sepcifications

  • After-sales Service 5-10 Years
  • Warranty 3 Years
  • Material Steel
  • Type Fixed
  • Structural Style Tower Scaffolding
  • Framework Frame Combined Scaffolding
  • Supporting Mode Floor Type Scaffolding
  • Lapping Form Full Scaffolding
  • Erection Position External Scaffolding
  • Move Method Horizontal mobile Scaffolding
  • Scaffolding Part Type Scaffolding Frames
  • Construction Properties Installation Scaffold
  • Transport Package by Pallets
  • Trademark ADTO
  • Origin Tianjin

Product Description

ANSI 4'X6' shoring frame scaffold ladder frame scaffolding 10K H.L. ~Product Description Specificaton 3'X6'7" / 5'x5' / 5'x4' / 5'x3' Customised size is available Material Q345 / Q235 Surface Powder Coated Main Tube 1.69"x0.095"/1.26''X0.079'' Frame locks Snap on lock, flip lock, ...

Learn More

Frame Scaffolding Comparison
Transaction Info
Price US $ 10.99-24.99/ Piece Negotiable US $ 20.00-30.00/ Piece Negotiable Negotiable
Min Order 100 Pieces 100 Pieces 100 Pieces 100 Pieces 100 Pieces
Trade Terms - - - - -
Payment Terms T/T L/C, T/T, Western Union, Paypal, Money Gram L/C, T/T, Western Union, Paypal, Money Gram L/C, T/T, Western Union, Paypal, Money Gram L/C, T/T, Western Union, Paypal, Money Gram
Quality Control
Product Certification - - - - CE SGS TUV
Management System Certification ISO 9001, ISO 14001 ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, BSCI, ANSI/ESD, ASME ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, BSCI, ANSI/ESD, ASME ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, BSCI, ANSI/ESD, ASME ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, BSCI, ANSI/ESD, ASME
Trade Capacity
Export Markets North America, Southeast Asia/ Mideast, East Asia(Japan/ South Korea) North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
After-sales Service: 5-10 Years;
Warranty: 3 Years;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Material: Steel;
Type: Mobile;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Building Scaffold;
Prop: Steel Prop;
Shoring Prop: Used Props Price;
Steel Prop Price: Push Pull Prop;
Tripod: Used Props;
Prop Jack: Doka Props;
Telescopic Prop: Adjustable Acrow Props;
Acrow Prop: Construction Steel Props;
Scaffolding Prop: Adjustable Steel Prop;
Spanish Prop: Galvanized Steel Prop;
Construction Prop: Formwork Steel Prop;
Prop Shore System: Powder Coated Steel Prop;
Adjustable Prop: Adjustable Steel Prop;
Material: Steel;
Type: Mobile;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Building Scaffold;
Prop: Steel Prop;
Shoring Prop: Used Props Price;
Steel Prop Price: Push Pull Prop;
Tripod: Used Props;
Prop Jack: Doka Props;
Telescopic Prop: Adjustable Acrow Props;
Acrow Prop: Construction Steel Props;
Scaffolding Prop: Adjustable Steel Prop;
Spanish Prop: Galvanized Steel Prop;
Construction Prop: Formwork Steel Prop;
Prop Shore System: Powder Coated Steel Prop;
Adjustable Prop: Adjustable Steel Prop;
Material: Steel;
Type: Mobile;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Building Scaffold;
Prop: Steel Prop;
Shoring Prop: Used Props Price;
Steel Prop Price: Push Pull Prop;
Tripod: Used Props;
Prop Jack: Doka Props;
Telescopic Prop: Adjustable Acrow Props;
Acrow Prop: Construction Steel Props;
Scaffolding Prop: Adjustable Steel Prop;
Spanish Prop: Galvanized Steel Prop;
Construction Prop: Formwork Steel Prop;
Prop Shore System: Powder Coated Steel Prop;
Adjustable Prop: Adjustable Steel Prop;
Material: Aluminum;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Cross Ring Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Installation Scaffold;
Factory Certificate: ISO9001 ISO14001 OHSAS18001;
Raw Material: 6061-T6;
Scaffold: Scaffolding;
Building Material: Construction;
Scaffold System: Aluminium Scaffold;
Ringlock Scaffold: Plank Scaffold;
Ringlock: Construction Scaffold;
Scaffold Steps System: Swing Stage Scaffold;
Steel Frame Scaffold: Steel Scaffold;
Scaffold Pipe: Scaffold Tube;
Suspended Scaffold: Layher;
Shoring Scaffold: Formwork;
Scaffolding System: Prop;
Supplier Name

CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.

China Supplier - Diamond Member Audited Supplier

RAPID Scaffolding (Engineering) Co., Ltd.

China Supplier - Diamond Member Audited Supplier

RAPID Scaffolding (Engineering) Co., Ltd.

China Supplier - Diamond Member Audited Supplier

RAPID Scaffolding (Engineering) Co., Ltd.

China Supplier - Diamond Member Audited Supplier

RAPID Scaffolding (Engineering) Co., Ltd.

China Supplier - Diamond Member Audited Supplier