Specification |
After-sales Service: Negotiable;
Warranty: Negotiable;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Suspended Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Surface: Pre-Galvanized, HDG, Painted;
Unit Weight: 13.57-16.83 Kg/PC;
Tube Thickness: 1.8mm, 2.0mm, 2.5mm, 3mm 3.2mm 3.25mm, 3.5mm, 4mm;
Advantage: Easy Erection, Strong Loading Capacity, Safety and;
Main Components: Frame, Catwalk, Joint Pin, Cross Brace, Base Jack,;
|
Material: Metal;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Finish: Hot DIP Galvanized;
Material Available: Q235, Q345, Galvanized Steel, Alloy;
Colour: Metallic;
Dimension: as Per Customer's Requirement;
MOQ: 10 Tons;
Application: Building, Mall, Factory, Pavilion;
Lead Time: 25-40 Days;
Service: OEM/ODM;
Packaging: in Bulk with Pallet;
Selling Point: Durable, Easy to Assemble;
|
Material: Steel;
Type: Mobile;
Structural Style: Tower Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Cross Ring Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Couplers;
Construction Properties: Building Scaffold;
Width: 1219mm, 1524mm, etc;
Height: 914mm, 1219mm, 1524mm, 1930mm, etc;
Surface Finishing: Galvanized, Painted;
Pipe Size: 48.3mm;
|
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Surface Treatment: Hop Dipped Galvanization;
|
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Surface Treatment: Hop Dipped Galvanization;
|