Auto Parts
US$1.97-2.36 / Piece
View
  • Recommend for you
  • What is Spray Coating Aluminum Die Casting for Aluminum LED Lighting Housing
  • What is Auto Aluminum Casting Spare Machine Parts Gravity Die Casting Auto Parts
  • What is CNC Machining Manufacturer Car Gear Gearboxes Cycles Auto Steering Gear

What is High Precision Hardware Brass Machine Parts CNC Machining Turning Component Parts

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

100-299 Pieces US$2.36

300+ Pieces US$1.97

Sepcifications

  • Transport Package Carton, Wood Box, OEM
  • Specification oem
  • Origin China
  • The Best Tolrance 0.0005
  • Surface Roughness Ra0.8-1.6
  • Design Software Solidworks
  • Inspecification 100%Before Packing
  • Fixture Custom
  • Lead Time 25-30days
  • CNC Machining Center 12 Sets
  • CNC Lathes Machines Over 20 Sets
  • Other Equipments Automatic Drilling and Tapping Machines and So on.

Product Description

High Precision Hardware Brass Machine Parts CNC Machining Turning Component Parts Introduction to die casting factory: Aluminum die cast process is a process in which the molten liquid of aluminum alloy is poured into the mold and solidified into a casting under the action of pressure. Our ...

Learn More

Auto Parts Comparison
Transaction Info
Price US $ 1.97-2.36/ Piece US $ 186/ Piece US $ 30.00-460.00/ Piece US $ 186/ Piece US $ 186/ Piece
Min Order 100 Pieces 100 Pieces 1 Pieces 100 Pieces 100 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, Western Union, Money Gram L/C, T/T, D/P T/T L/C, T/T, D/P, Western Union L/C, T/T, D/P
Quality Control
Management System Certification ISO 9001, ISO 9000, IATF16949 ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets North America, Eastern Europe, Africa, Oceania, Eastern Asia, Western Europe Europe North America, Eastern Europe, Oceania, Mid East, Eastern Asia, Western Europe Europe Europe
Annual Export Revenue - - - - -
Business Model OEM, ODM OEM, ODM OEM, Others OEM, ODM OEM, ODM
Average Lead Time Off-season: 1-3 Month(s)
Peak-season: 3-6 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 6-12 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
The Best Tolrance: 0.0005;
Surface Roughness: Ra0.8-1.6;
Design Software: Solidworks;
Inspecification: 100%Before Packing;
Fixture: Custom;
Lead Time: 25-30days;
CNC Machining Center: 12 Sets;
CNC Lathes Machines: Over 20 Sets;
Other Equipments: Automatic Drilling and Tapping Machines and So on.;
Able to Cut: 0.8-355mm;
Material: Carbon Steel, Stainless Steel;
Welder: 150 Workers;
Material: Carbon Steel, Stainless Steel, SPCC, Aluminum;
Machining Method: CNC Stamping;
Able to Cut: 0.8-355mm;
Material: Carbon Steel, Stainless Steel;
Welder: 150 Workers;
Supplier Name

Ningbo Aikehan Metal Product Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Hangzhou Hengli Metal Processing Co., Ltd.

China Supplier - Diamond Member Audited Supplier

BOLE RP & M CO., LTD

China Supplier - Gold Member Audited Supplier

Hangzhou Hengli Metal Processing Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Hangzhou Hengli Metal Processing Co., Ltd.

China Supplier - Diamond Member Audited Supplier