Working Platform
Negotiable
View
  • Recommend for you
  • What is Different Width Scaffolding Plank for Construction Galvanized Steel/Aluminum Aluminium Metal Planks Specification for Sale
  • What is Echaffaudage Ring Lock Scaffolding System Andamios Metalicos Catwalk Multidireccionales Andamios Layher Construction Scaffolds
  • How to Make En12811 Galvanized Ringlock Scaffolding System All Round Layher Scaffold for Construction Projects/Stage Event

What is Steel Plank Scaffolding Scaffold Construction Mobile Working Suspended Lift Platform

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

100 Pieces Negotiable

Sepcifications

  • Material Steel
  • Type Fixed
  • Structural Style Multi-Pole Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Projecting Scaffolding
  • Lapping Form Full Scaffolding
  • Erection Position External Scaffolding
  • Move Method Attached Lifting Scaffolding
  • Scaffolding Part Type Scaffolding Planks
  • Construction Properties Building Scaffold
  • Transport Package Pack in Steel Trestles
  • Specification 19′′x7′, 19′′x8′, 19′′x10′, or customized
  • Trademark Rapid
  • Origin China
  • Factory Certificate ISO9001 ISO14001 OHSAS18001
  • Certificate CE SGS TUV
  • Galvanized Pipe Galvanized Steel Pipe
  • Construction Scaffolding Coupler
  • Scaffolding Price H Frame Scaffolding
  • Hydraulic Scaffolding a Frame Scaffolding
  • Ringlock Scaffolding System Scaffold in Floor
  • Ladder Frame Scaffoldings Building Construction Tools
  • Used Scaffolding for Sale Scaffold Wheels
  • Scaffolding System Scaffold System
  • Aluminium Scaffolding Used Scaffolding
  • Scaffolding Accessories System Scaffold
  • Andamios Scaffolding for Sale
  • Frame Scaffolding Construction Scaffolding
  • Construction Scaffold Scaffold Wheels

Product Description

Steel Plank Scaffolding Scaffold Construction Mobile Working Suspended Lift Platform Product Description Brand Name Rapid Place of Origin Wuxi, Jiangsu, China Material Standard Steel Finish HDG or Painted Model Type 19''x7', 19''x8',19''x10', or customized (3'-10' available) Thickness of ...

Learn More

Working Platform Comparison
Transaction Info
Price Negotiable US $ 2.5/ Piece US $ 2.5/ Piece US $ 2.5/ Piece US $ 2.5/ Piece
Min Order 100 Pieces 500 Pieces 500 Pieces 500 Pieces 500 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram
Quality Control
Product Certification CE SGS TUV - - - -
Management System Certification ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, BSCI, ANSI/ESD, ASME ISO 9001, ISO 9000 ISO 9001, ISO 9000 ISO 9001, ISO 9000 ISO 9001, ISO 9000
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Product Attributes
Specification
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Building Scaffold;
Factory Certificate: ISO9001 ISO14001 OHSAS18001;
Galvanized Pipe: Galvanized Steel Pipe;
Construction Scaffolding: Coupler;
Scaffolding Price: H Frame Scaffolding;
Hydraulic Scaffolding: a Frame Scaffolding;
Ringlock Scaffolding System: Scaffold in Floor;
Ladder Frame Scaffoldings: Building Construction Tools;
Used Scaffolding for Sale: Scaffold Wheels;
Scaffolding System: Scaffold System;
Aluminium Scaffolding: Used Scaffolding;
Scaffolding Accessories: System Scaffold;
Andamios: Scaffolding for Sale;
Frame Scaffolding: Construction Scaffolding;
Construction Scaffold: Scaffold Wheels;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Wall Hanging Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: Internal Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Treatment: Painted, Galvanized;
Colour: Silver, Orange, Red, or as Your Request;
Delivery Time: About 15-30 Days After Confirmation;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Wall Hanging Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: Internal Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Treatment: Painted, Galvanized;
Colour: Silver, Orange, Red, or as Your Request;
Delivery Time: About 15-30 Days After Confirmation;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Wall Hanging Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: Internal Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Treatment: Painted, Galvanized;
Colour: Silver, Orange, Red, or as Your Request;
Delivery Time: About 15-30 Days After Confirmation;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Wall Hanging Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: Internal Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Treatment: Painted, Galvanized;
Colour: Silver, Orange, Red, or as Your Request;
Delivery Time: About 15-30 Days After Confirmation;
Supplier Name

RAPID Scaffolding (Engineering) Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Di Ao International Trade (Tianjin) Co.,Ltd.

China Supplier - Gold Member Audited Supplier

Di Ao International Trade (Tianjin) Co.,Ltd.

China Supplier - Gold Member Audited Supplier

Di Ao International Trade (Tianjin) Co.,Ltd.

China Supplier - Gold Member Audited Supplier

Di Ao International Trade (Tianjin) Co.,Ltd.

China Supplier - Gold Member Audited Supplier