Specification |
Standard: ASTM, JIS, GB, AISI, DIN;
Surface Treatment: Coated;
Technique: Cold Rolled;
Application: Building, Construction;
Edge: Slit edge;
Stock: Stock;
Place of Origin: China;
Brand: Bohai;
|
After-sales Service: Online;
Warranty: One Year;
Standard: ASTM, JIS, GB, AISI, DIN, BS;
Surface Treatment: Polished;
Technique: Hot Rolled, Cold Rolled;
Application: Boiler Plate;
Edge: Mill;
Stock: Stock;
Model No.: 201/304L/321/316L/321/316L/309/310S/317/347/409;
Product Name: Stainless Steel Coil;
Service: OEM, Customized Processing Service, Customized Fab;
Product Keyword: Stainless Steel Coil;
Width: 3mm-2000mm or as Required;
Thickness: 0.1mm-300mm or as Required;
MOQ: 1 Ton;
Grade: 201, 304, 316, 316L, 410, 430, etc;
Payment Term: T/T L/C(30% Deposite);
Price Term: Fob CIF CFR Ex-Work;
Quality: First-Class;
Sample: Avaliable;
Delivery Time: 7-15 Days;
Keywords: Stainless Steel Coil;
Place of Origin: Shandong, China;
|
Standard: ASTM, JIS, GB, AISI, DIN, BS, En;
Surface Treatment: Polished;
Technique: Cold Rolled;
Application: Industrial, Construction;
Stock: Stock;
Shape: Stainless Steel Coils;
Trade Terms: Fob;
Delivery Time: 1-15 Days;
Surface: 2b,Ba;
Advantage: Small Export +Superior Quality+Competitive Price;
Thickness: 0.03-3.0mm;
Sample: Samples Free and Express Charges Bear by You.;
Thickness Tolerance: +/-5%;
Brand: Tisco, Bao Steel;
|
Standard: ASTM, JIS, GB, AISI, DIN;
Surface Treatment: Polished;
Technique: Cold Rolled;
Application: Construction, Kitchen;
Edge: Mill Edge Slit Edge;
Stock: Stock;
Product Name: Stainless Steel Strip;
Material: 430 410 420 SUS304 304L 202 321 316 316L 201 304;
Surface Technology: 2b, N0.4, Hl, Ba, 8K, Etched, Brushed etc.;
Tolerance: +_1%;
Processing Service: Bending, Welding, Decoiling, Punching, Cutting;
Price Term: CIF CFR Fob EXW;
MOQ: 1 Ton;
|
After-sales Service: Yes;
Warranty: 1 Year;
Standard: ASTM, JIS, GB, AISI, DIN, BS;
Surface Treatment: Galvanized;
Technique: Cold Rolled;
Application: Corrugated Roofing Sheet;
Edge: Slit edge;
Stock: Stock;
Delivery: 5-15 Working Days or Depending on The Quantity;
Zinc Coating: Z30--275GSM;
MOQ: 1 Ton;
Thickness: 0.12-3.0mm;
|