Specification |
Material: ABS;
Application: Electronics, Automotive;
Service: OEM;
Color: Custom Color;
Drawing Format: Step;
Process: Injection Mould Plastic Part;
Mold Material: P20/718/738/Nak80/S136/2738/2316;
MOQ: Negotiated;
|
Material: ABS;
Application: Medical, Household, Electronics, Automotive;
Product Name: Custom Plastic Injection Molds;
Product Material: ABS, PVC, PC, PMMA, PE, POM, PA, TPU, etc.;
Sample Confirm: We Will Send The Trial Samples to Customers Before;
Quotation: According to Samples, Drawing and Specific Require;
Gate Type: Pin Point Gate, Edge Gate, Side Gate, Sub Gate;
Mould Material: P20/Nak80/S136;
Main Thechnology: Milling, Grinding, CNC, EDM, Wire Cutting, etc;
Weekly Report: We Will Update The Mold Schedule Every Week;
Sofeware: CAD, PRO-E, Ug, Rhinoceros etc.;
Lead Time of First Samples: Around 4~7weeks;
|
Material: PC;
Application: Medical, Household, Electronics, Automotive;
Product Name: Household Plastic Part Mold;
Installation: Fixed;
Standard: Hasco;
Customized: Customized;
|
Material: PC;
Application: Medical, Household, Electronics, Automotive;
Product Name: Custom Plastic Stool Molds;
Material of Steel: P20, 718, 8407, Nak80, H13, S136, DIN 1.2738, DIN;
Gate Type: Side Gate, Sub Gate, Pin Point Gate, Edge Gate etc;
Mold Cavity: Single Cavity / Family Molds / Multi Cavity;
Quote: According to Samples, Drawing and Specific Require;
Mould Life: 300000~500000times;
Lead Time: 15-45 Working Days;
Process: Grinding, Milling, Drilling, etc.;
Mould Core Steel: #45 Steel, 718, P20, Nak80, S136 etc.;
|
Material: PC;
Application: Medical, Household, Electronics, Automotive;
Product Name: Custom Plastic Stool;
Product Material: ABS, PVC, PC, PMMA, PE, POM, PA, TPU, etc.;
Sample Confirm: We Will Send The Trial Samples to Customers Before;
Quotation: According to Samples, Drawing and Specific Require;
Gate Type: Pin Point Gate, Edge Gate, Side Gate, Sub Gate;
Mould Material: P20/718/738/Nak80/S136;
Main Thechnology: Milling, Grinding, CNC, EDM, Wire Cutting, etc;
Weekly Report: We Will Update The Mold Schedule Every Week;
Sofeware: CAD, PRO-E, Ug, Rhinoceros etc.;
Lead Time of First Samples: Around 4~7weeks;
|