Specification |
Type: Copper Sheets;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass;
Shape: Plate;
Alloy: Non-alloy;
Color: Purple;
Standard: ASTM;
Thickness: 0.1mm~200mm or Required;
Cu (Min): 99.9%;
Processing Service: Bending, Welding, Decoiling, Cutting, Punching;
Tolerance: 1%,2%,3%,Customize;
Special Application: Ships, Refrigerators, Molds, Aerospace Equipment;
Surface Technical: Corrugated/Perforated/Embossed/Water Ripple/Eched;
Model No.1: Tp1 Tp2 T2 Tu2 Tu1 C2800;
Temper: O-H112; T3-T8; T351-T851;
MOQ: 1 Ton;
Name: Copper Sheet;
|
Type: Copper Sheets;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Red Copper;
Shape: Plate;
Alloy: Alloy;
Color: Customized;
Standard: ASTM;
Width: 10mm~2500mm, 10mm~2500mm or as Required;
MOQ: 1ton;
Processing Service: Bending, Welding, Decoiling, Cutting, Punching;
Cu (Min): 99.90%;
Ultimate Strength (≥ MPa): 195;
Elongation (≥ %): 30;
Surface: Mill, Polished, Bright, Hair Line, Brush, Sand Blast, Et;
|
Type: Brass Pipe;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass;
Shape: Round;
Alloy: Alloy;
Color: Yellow;
Standard: ASTM,DIN,En,GB,JIS;
Grade: H62,H65,H68;
Lead Time: 3-5 Days for Stock, 30 Days for Customization;
Temper: Soft,Hard,Half Hard;
Payment Term: T/T,D/P,L/C,etc;
Outside Diameter: 0.1-800mm;
Thickness: 0.01-100mm;
Length: as Requirement;
Usage: Electrical,Heat Exchanger,Industrial,Medical;
Technology: Extruded,Drawn;
Trade Terms: Fob, EXW, CIF, CFR, etc;
MOQ: 5PC for Stock, 2 Tons for Order;
|
Type: Copper Bars;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass;
Shape: Round;
Alloy: Non-alloy;
Color: Yellow, Rod;
Standard: ASTM;
|
Type: Bronze Bar;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Bronze;
Shape: Round;
Alloy: Alloy;
Color: Yellow;
Standard: ASTM,DIN,En,GB,JIS;
Grade: C83600,C93200,etc;
Length: Less Than 8100mm;
Surface: Mill,Polished,Brushed,etc;
Manufacturing Process: Hot Rolled,Cold Rolled,Forged;
Lead Time: 3-5 Days for Stock, 30 Days for Customization;
Payment Term: T/T,D/P,L/C,etc;
Technology: Drawn,Extruded;
Trade Terms: Fob, EXW, CIF, CFR, etc;
MOQ: 5PC for Stock, 2 Tons for Order;
|