Rongdu Mould Fruit Vegetable Seafood Tool Logistics Transportation Turnover Logistics Stackable Folding Storage Plastic Crate Container Box Mould

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Set US$3,000.00-10,000.00 / Set

Sepcifications

  • Warranty 1 Year
  • Shaping Mode Injection Mould
  • Surface Finish Process Polishing
  • Mould Cavity Single Cavity
  • Plastic Material PE
  • Application Household Appliances, Commodity
  • Runner Hot Runner
  • Design Software UG
  • Installation Fixed
  • Certification TUV
  • Standard DME
  • Customized Customized
  • After-sales Service 1 Year
  • Transport Package Wooden Case
  • Specification 690*410*490mm
  • Trademark Rongdu Mould
  • Origin China
  • Mould Steel for Core HP20, H718, 2738
  • Mould Steel for Basement S50c
  • Mould Treatment Nitridation, Quencher, Heat-Treated, Pre-Hardening
  • Mould Tooling Precision 5-Axis Tooling Machine
  • Hot Runner System Yudo, Mold Master, Chinese Brand
  • Cooling System Beryllium-Bronze Insert
  • Ejection System Stripper
  • Hydraulic Cylinder Taiwan Brand
  • Mould Cycle Time 60s
  • Mould Delivery Time 60 Days
  • Mould Life More Than 500K Shoots
  • Mould Guarantee 1 Year
  • Crate Loading Ability Well Standard

Product Description

CHINA RONGDU MOULD Rongdu mould Fruit Vegetable Seafood Tool Logistics Transportation Turnover Logistics Stackable Folding Storage Plastic Crate Container Box Mould, Plastic vegetable crate box container mold, egg box mold, crate mold, container mold manufacturer ...

Learn More

Plastic Crate Mould Comparison
Transaction Info
Price US $ 3,000.00-10,000.00/ Set US $ 20,000.00-30,000.00/ Piece US $ 20,000.00-30,000.00/ Piece US $ 20,000.00-30,000.00/ Piece US $ 10,000.00-20,000.00/ Piece
Min Order 1 Sets 1 Pieces 1 Pieces 1 Pieces 1 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, Paypal L/C, T/T, Western Union L/C, T/T, Western Union L/C, T/T, Western Union L/C, T/T, Western Union
Quality Control
Product Certification TUV ISO ISO ISO ISO
Management System Certification ISO 9001 ISO 9000 ISO 9000 ISO 9000 ISO 9000
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic
Annual Export Revenue - - - - -
Business Model OEM, ODM - - - -
Average Lead Time Off-season: 1 Month(s)
Peak-season: within 15 Day(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
Warranty: 1 Year;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PE;
Application: Household Appliances, Commodity;
Runner: Hot Runner;
Design Software: UG;
Installation: Fixed;
Standard: DME;
Customized: Customized;
After-sales Service: 1 Year;
Mould Steel for Core: HP20, H718, 2738;
Mould Steel for Basement: S50c;
Mould Treatment: Nitridation, Quencher, Heat-Treated, Pre-Hardening;
Mould Tooling Precision: 5-Axis Tooling Machine;
Hot Runner System: Yudo, Mold Master, Chinese Brand;
Cooling System: Beryllium-Bronze Insert;
Ejection System: Stripper;
Hydraulic Cylinder: Taiwan Brand;
Mould Cycle Time: 60s;
Mould Delivery Time: 60 Days;
Mould Life: More Than 500K Shoots;
Mould Guarantee: 1 Year;
Crate Loading Ability: Well Standard;
Shaping Mode: Injection Mould;
Surface Finish Process: Texture;
Mould Cavity: Single/Multiple;
Plastic Material: PP;
Process Combination Type: Single-Process Mode;
Application: Furniture;
Runner: Cold or Hot;
Design Software: Ug,PRO-E,Solidwork;
Installation: Fixed;
Standard: Dme/Hasco/Lkm;
Customized: Customized;
Mould Base: S50c/C45;
Mould Standard: Dme/Lkm Ect;
Machine Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car;
Heat Treatment: Nitriding;
Mold Design: 7days After Deposit;
T1 Sample Time: 60days After Design Confrimed;
Mould Report: 7-10days;
Shaping Mode: Injection Mould;
Surface Finish Process: Texture;
Mould Cavity: Single/Multiple;
Plastic Material: PP;
Process Combination Type: Single-Process Mode;
Application: Furniture;
Runner: Cold or Hot;
Design Software: Ug,PRO-E,Solidwork;
Installation: Fixed;
Standard: Dme/Hasco/Lkm;
Customized: Customized;
Mould Base: S50c/C45;
Mould Standard: Dme/Lkm Ect;
Machine Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car;
Heat Treatment: Nitriding;
Mold Design: 7days After Deposit;
T1 Sample Time: 60days After Design Confrimed;
Mould Report: 7-10days;
Shaping Mode: Injection Mould;
Surface Finish Process: Texture;
Mould Cavity: Single/Multiple;
Plastic Material: PP;
Process Combination Type: Single-Process Mode;
Application: Furniture;
Runner: Cold or Hot;
Design Software: Ug,PRO-E,Solidwork;
Installation: Fixed;
Standard: Dme/Hasco/Lkm;
Customized: Customized;
Mould Base: S50c/C45;
Mould Standard: Dme/Lkm Ect;
Machine Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car;
Heat Treatment: Nitriding;
Mold Design: 7days After Deposit;
T1 Sample Time: 60days After Design Confrimed;
Mould Report: 7-10days;
Shaping Mode: Injection Mould;
Surface Finish Process: Texture;
Mould Cavity: Single/Multiple;
Plastic Material: PP;
Process Combination Type: Single-Process Mode;
Application: Furniture;
Runner: Cold or Hot;
Design Software: Ug,PRO-E,Solidwork;
Installation: Fixed;
Standard: Dme/Hasco/Lkm;
Customized: Customized;
Mould Base: S50c/C45;
Mould Standard: Dme/Lkm Ect;
Machine Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car;
Heat Treatment: Nitriding;
Mold Design: 7days After Deposit;
T1 Sample Time: 60days After Design Confrimed;
Mould Report: 7-10days;
Supplier Name

Taizhou Huangyan Rongdu Mould Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier