Specification |
Type: Copper Scrap;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Red Copper;
Shape: Scrap;
Alloy: Non-alloy;
Color: Red;
Standard: ASTM;
Purity: 99%-99.99%;
Wire Diameter: 0.20mm, 0.25mm, 0.30mm;
Tensile Strength: 1000n/mm2, 900n/mm2, 500n/mm2, 450n/mm2;
Weight: 3kg, 5kg, 7kg, 15kg, 20kg;
Tolerance: ±1%;
Delivery Time: 7-14 Days;
|
Type: Copper Sheets;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Red Copper;
Shape: Plate;
Alloy: Non-alloy;
Color: Red;
Standard: ASTM;
Product Name: Copper Plate;
Width: Customized;
Grade: Pure Copper;
Cu (Min): 99%;
Processing Service: Bending, Welding, Decoiling, Cutting, Punching;
Surface: Polished;
Hardness: Hard;
Delivery Time: 7-15 Days;
Payment Term: Tt;
MOQ: 5 Tons;
|
Type: Copper Sheets;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Red Copper;
Shape: Plate;
Alloy: Non-alloy;
Color: Red;
Standard: ASTM;
Product Name: Copper Plate;
Width: Customized;
Grade: Pure Copper;
Cu (Min): 99%;
Processing Service: Bending, Welding, Decoiling, Cutting, Punching;
Surface: Polished;
Hardness: Hard;
Delivery Time: 7-15 Days;
Payment Term: Tt;
MOQ: 5 Tons;
|
Type: Copper Sheets;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Red Copper;
Shape: Plate;
Alloy: Non-alloy;
Color: Red;
Standard: ASTM;
Product Name: Copper Plate;
Width: Customized;
Grade: Pure Copper;
Cu (Min): 99%;
Processing Service: Bending, Welding, Decoiling, Cutting, Punching;
Surface: Polished;
Hardness: Hard;
Delivery Time: 7-15 Days;
Payment Term: Tt;
MOQ: 5 Tons;
|
Type: Copper Sheets;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Red Copper;
Shape: Plate;
Alloy: Non-alloy;
Color: Red;
Standard: ASTM;
Product Name: Copper Plate;
Width: Customized;
Grade: Pure Copper;
Cu (Min): 99%;
Processing Service: Bending, Welding, Decoiling, Cutting, Punching;
Surface: Polished;
Hardness: Hard;
Delivery Time: 7-15 Days;
Payment Term: Tt;
MOQ: 5 Tons;
|