Specification |
Type: Copper Wire;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Red Copper;
Shape: Round;
Alloy: Non-alloy;
Color: Red;
Standard: ASTM;
Cu (Min): 99.99%;
Grade: Brass, Copper;
|
Type: Copper Pipe;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass;
Shape: Round,Square,Rectangular;
Alloy: Alloy;
Color: Golden;
Standard: ASTM;
Material Grade: T1,T2,C10100,C10200,C10300,C10400,C10500,C10700;
Trade Term: EXW Fob CFR CIF;
Hardness: 1/16 Hard,1/8 Hard,1/4 Hard,1/2hard,Full Hard;
MOQ: 500kgs;
Hot Sale Country: Middle East ,Southeast Asia, South America ,Europe;
Key Word: Copper Tube;
Sample: Free Provide;
|
Type: Copper Pipe;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass;
Shape: Round,Square,Rectangular;
Alloy: Alloy;
Color: Golden;
Standard: ASTM;
Material Grade: T1,T2,C10100,C10200,C10300,C10400,C10500,C10700;
Trade Term: EXW Fob CFR CIF;
Hardness: 1/16 Hard,1/8 Hard,1/4 Hard,1/2hard,Full Hard;
MOQ: 500kgs;
Hot Sale Country: Middle East ,Southeast Asia, South America ,Europe;
Key Word: Copper Tube;
Sample: Free Provide;
|
Type: Copper Sheets;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass, Red Copper, Bronze;
Shape: Plate;
Alloy: Alloy;
Color: Yellow, Red, Golden;
Standard: ASTM/En/DIN;
Width: 4mm~2500mm;
Length: 1m~12m or as Required;
Delivery Time: 20 Days or as Requirement;
Trade Terms: Fob, CIF, CFR, etc;
Payment Term: 30% in Advance. Balance Before Shipment;
MOQ: 1PC for Stock, 6 Tons for Order;
Key Words: C79300 Copper Sheet Chemical Composition;
|
Type: Copper Sheets;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass, Red Copper, Bronze;
Shape: Plate;
Alloy: Alloy;
Color: Yellow, Red, Golden;
Standard: ASTM/En/DIN;
Width: 4mm~2500mm;
Length: 1m~12m or as Required;
Delivery Time: 20 Days or as Requirement;
Trade Terms: Fob, CIF, CFR, etc;
Payment Term: 30% in Advance. Balance Before Shipment;
MOQ: 1PC for Stock, 6 Tons for Order;
Key Words: C10100 Copper Sheet Machinability;
|