Scaffolding Ladder
US$250.00 / Meter
View
  • Recommend for you
  • What is Dragonstage Aluminum Mobile Single Ladder Scaffolding with Caster Adjustable Leg
  • What is Dragonstage Aluminium Scaffold Tube Scaffold Tower Household Aluminum Scaffolding
  • What is Dragonstage Used Scaffolding Scaffold Tool Belts Cup Lock Scaffolding

What is Dragonstage Aluminum Ladder Scaffolding for Construction

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

6 Meters US$250.00 / Meter

Sepcifications

  • Material Aluminum
  • Type Mobile
  • Structural Style Tower Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Floor Type Scaffolding
  • Lapping Form Double Scaffolding
  • Erection Position External Scaffolding
  • Move Method Horizontal mobile Scaffolding
  • Scaffolding Part Type Scaffolding Frames
  • Construction Properties Building Scaffold
  • Transport Package Air Bubble Film
  • Origin Guangzhou, China
  • Place of Origin Guangdong, China (Mainland)
  • Main Tube 51*2mm
  • Certification TUV ISO9001
  • Brand Name Dragon Truss
  • Height 2-40m
  • Section 1.35*2m
  • Packaging Details Air Bubble Film
  • Delivery Detail 2- 7 Working Days After The Order Is Confirmed

Product Description

The advantage of double width step-stair scaffolding: 1, Carrying tool and lifting materials will be easier 2, Easy dismantle and assemble, in addtion to be applied indenpendently, It is able to be constituted as large structures such as escalators and stairs. 3, Aluminum alloy is ...

Learn More

Scaffolding Ladder Comparison
Transaction Info
Price US $ 250/ Meter US $ 5.00-30.00/ Piece US $ 5.00-30.00/ Piece US $ 5.00-30.00/ Piece US $ 3.00-20.00/ Piece
Min Order 6 Meters 100 Pieces 100 Pieces 100 Pieces 100 Pieces
Trade Terms EXW - - - -
Payment Terms T/T, cash L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram
Quality Control
Product Certification TUV ISO9001 En12810 En12810 En12810 SGS/TUV
Management System Certification ISO 9001 ISO 9001, ISO 14001, BRC ISO 9001, ISO 14001, BRC ISO 9001, ISO 14001, BRC ISO 9001, ISO 14001, BRC
Trade Capacity
Export Markets North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic
Annual Export Revenue - - - - -
Business Model OEM OEM, ODM OEM, ODM OEM, ODM OEM, ODM
Average Lead Time Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Product Attributes
Specification
Material: Aluminum;
Type: Mobile;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Place of Origin: Guangdong, China (Mainland);
Main Tube: 51*2mm;
Brand Name: Dragon Truss;
Height: 2-40m;
Section: 1.35*2m;
Packaging Details: Air Bubble Film;
Delivery Detail: 2- 7 Working Days After The Order Is Confirmed;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Surface Treatment: Hop Dipped Galvanization;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Surface Treatment: Hop Dipped Galvanization;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Surface Treatment: Hop Dipped Galvanization;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Surface Treatment: Hop Dipped Galvanization;
Supplier Name

FOSHAN DRAGON STAGE EQUIPMENT CO.,LTD

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier