Metal Casting Stainless Steel Part for Blower

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 kg US$3.60-5.00 / kg

Sepcifications

  • Transport Package Wooden Case/Pallet Suitable for Different Shipping
  • Specification Customized according to drawing
  • Trademark DY
  • Origin China
  • Name Turbine Housing
  • Material Stainless Steel
  • Surface Treatment Painting or as Per Requirement
  • Roughness as Per Technical Specification

Product Description

Welcome to Fengcheng Danyang Machinery Co., Ltd.! Are you in need of high-quality metal parts? Look no further! At Fengcheng Danyang Machinery, we specialize in supplying a wide range of metal parts to meet your specific needs. Whether you require turbocharger parts, valve parts, pump parts, ...

Learn More

Blower Steel Part Comparison
Transaction Info
Price US $ 3.60-5.00/ kg Negotiable US $ 1.50-9.60/ Piece US $ 2.30-9.50/ Piece US $ 1.80-10.60/ Piece
Min Order 1 kg 100 Pieces 5 Pieces 5 Pieces 5 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T L/C, T/T L/C, T/T, D/P, Paypal L/C, T/T, D/P, Paypal L/C, T/T, D/P, Paypal
Quality Control
Product Certification - - IATF, ISO9001:2015, RoHS, GB/T19001-2016 IATF, ISO9001:2015, RoHS, GB/T19001-2016 IATF, ISO9001:2015, RoHS, GB/T19001-2016
Management System Certification - ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets North America, South America, Europe, Southeast Asia/ Mideast Europe North America, Eastern Europe, Africa, Mid East, Western Europe North America, Eastern Europe, Africa, Mid East, Western Europe North America, Eastern Europe, Africa, Mid East, Western Europe
Annual Export Revenue - - - - -
Business Model OEM, ODM OEM, ODM - - -
Average Lead Time - Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Name: Turbine Housing;
Material: Stainless Steel;
Surface Treatment: Painting or as Per Requirement;
Roughness: as Per Technical Specification;
Alloy: Alloy;
Production Equipment: 5-Axis Mcs, CNC Lathes, Edms, Wedms, Cmms etc.;
Range of Machining: Large Variety of Metal and Non-Metal Parts;
Tolerance Range: +/-0.003mm to +/-0.01mm Tightest;
Surface Roughness: Ra: 3.2-0.4;
Quality Control: 100% Inspection Before Delivery;
Machining Operations: CNC Milling/Turning/Slow Wire Cutting/Grinding etc;
Surface Treatment: Anodizing, Plating, Sandblasting, Passivating;
Workpiece Materials: Steel/Stainless Steel/Alloy/Tatinium/Aluminum etc.;
OEM/ODM: Available;
Designing: Available;
Lead Time for Prototypes: 10-15 Days, Depending on Specific Products;
Lead Time for Formal Order: Depending on Quantity and Quality Requirements;
MOQ: 5 PCS;
Delivery: FedEx, DHL, UPS, TNT, etc.;
Production Equipment: 5-Axis Mcs, CNC Lathes, Edms, Wedms, Cmms etc.;
Range of Machining: Large Variety of Metal and Non-Metal Parts;
Tolerance Range: +/-0.003mm to +/-0.01mm Tightest;
Surface Roughness: Ra: 3.2-0.4;
Quality Control: 100% Inspection Before Delivery;
Machining Operations: CNC Milling/Turning/Slow Wire Cutting/Grinding etc;
Surface Treatment: Anodizing, Plating, Sandblasting, Passivating;
Workpiece Materials: Steel/Stainless Steel/Alloy/Tatinium/Aluminum etc.;
OEM/ODM: Available;
Designing: Available;
Lead Time for Prototypes: 10-15 Days, Depending on Specific Products;
Lead Time for Formal Order: Depending on Quantity and Quality Requirements;
MOQ: 5 PCS;
Delivery: FedEx, DHL, UPS, TNT, etc.;
Production Equipment: 5-Axis Mcs, CNC Lathes, Edms, Wedms, Cmms etc.;
Range of Machining: Large Variety of Metal and Non-Metal Parts;
Tolerance Range: +/-0.003mm to +/-0.01mm Tightest;
Surface Roughness: Ra: 3.2-0.4;
Quality Control: 100% Inspection Before Delivery;
Machining Operations: CNC Milling/Turning/Slow Wire Cutting/Grinding etc;
Surface Treatment: Anodizing, Plating, Sandblasting, Passivating;
Workpiece Materials: Steel/Stainless Steel/Alloy/Tatinium/Aluminum etc.;
OEM/ODM: Available;
Designing: Available;
Lead Time for Prototypes: 10-15 Days, Depending on Specific Products;
Lead Time for Formal Order: Depending on Quantity and Quality Requirements;
MOQ: 5 PCS;
Delivery: FedEx, DHL, UPS, TNT, etc.;
Supplier Name

Fengcheng Danyang Machinery Co., Ltd.

China Supplier - Gold Member Audited Supplier

Hangzhou Hengli Metal Processing Co., Ltd.

China Supplier - Diamond Member Audited Supplier

ZHD Precision Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier

ZHD Precision Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier

ZHD Precision Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier