Specification |
Type: Stainless Steel Pipes;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 200series, 300 Series, 400series,2b;
Shape: Round,Square,Rectangular;
Technique: Hot Rolled & Cold Drawn;
Surface Treatment: Polished, Pickling,Bright;
End Type: Plain Ends,Bevel End,Threaded End;
Inspection: Hydraulic Testing, Et,Ut;
Surface: Pickled, Annealed,Polished;
Technology: Cold Drawn,Colled Rolled, Hot Rolled;
Delivery Time: 7-35 Days;
Standard and Grade: ASTM,ASME,JIS&DIN;
Material: ASTM A312/A213 TP304/316/S31803;
Products: Stainless Steel Tubes;
|
Type: Stainless Steel Sheets;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 300 Series;
Shape: Flat;
Technique: Hot Rolled;
Surface Treatment: Bright;
Commonly Used: Construction, Food Industry, Equipment, Decoration;
Surface: 2b, Ba, 8K;
Regular Size: 1220*2440mm, 1.5*6m, 1.5*3m, 1*2m;
Sample: Can Be Provided for Free;
|
Type: Stainless Steel Coils;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 200 Series;
Shape: Coil;
Technique: Cold Rolled / Hot Rolled;
Surface Treatment: 2b, Ba, Hl, Bk, No.1, No.4, 8K, etc;
Cold Rolled Thickness: 0.15mm-5 mm, as Customer Primes Request;
Hot Rolled Thickness: 3.0mm-180mm, as Customer's Request;
Trade Terms: EXW, Fob, CFR, CIF;
Edge Category: Silt Edge or Mill Edge;
Delivery Time: 3-5 Days;
MOQ: 1 Tons;
|
Type: Stainless Steel Sheets;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 300 Series;
Shape: Flat;
Technique: Hot Rolled;
Surface Treatment: Bright;
Commonly Used: Construction, Food Industry, Equipment, Decoration;
Surface: 2b, Ba, 8K;
Regular Size: 1220*2440mm, 1.5*6m, 1.5*3m, 1*2m;
Sample: Can Be Provided for Free;
|
Type: Stainless Steel Coils;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 200 300 400 Seires;
Shape: Coil;
Technique: Cold Rolled / Hot Rolled;
Surface Treatment: 2b, Ba, Hl, Bk, No.1, No.4, 8K, etc;
Cold Rolled Thickness: 0.15mm-5 mm, as Customer Primes Request;
Hot Rolled Thickness: 3.0mm-180mm, as Customer's Request;
Trade Terms: EXW, Fob, CFR, CIF;
Edge Category: Silt Edge or Mill Edge;
Delivery Time: 5-7 Working Days;
MOQ: 1 Ton;
|