Galvanizing Machine
US$100,000.00-3,000,000.00 / Set
View
  • Recommend for you
  • What is Scaffolding Manufacturers of Hot DIP Galvanizing Systems
  • What is Small Parts Hot DIP Galvanizing Plant
  • What is Hot Melt Type Zinc Ash Recovery Furnace

What is Galvanizing Machine Coating Machine Zinc Melting Basin

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Set US$100,000.00-3,000,000.00 / Set

Sepcifications

  • After-sales Service Whole Life
  • Warranty Whole Life
  • Type Coating Production Line
  • Coating Galvanized
  • Substrate Steel
  • Certification CE, ISO, SGS
  • Condition New
  • Transport Package as Required
  • Specification Customized
  • Trademark Annuo
  • Origin Shijiazhuang China
  • Heating Method Electric, Steam, Hot Water
  • Operation Mode Automatic, Semi Automatic, Manual
  • Material of Kettle Steel, Ceramic
  • Material of Tank PP, Moortone
  • Installation Concluded as Customer Required
  • Application Bridge and Highway, Industry, Construction,

Product Description

Hebei Annuo Automation Technology Co.,Ltd. was founded in 1998. with broad industry experience, having performed hot-dip galvanizing line for steel components that meet the performance requirements for a wide range of applications including: Agriculture Bridge &highway Construction Electrical ...

Learn More

Galvanizing Machine Comparison
Transaction Info
Price US $ 100,000.00-3,000,000.00/ Set US $ 450.00-650.00/ Piece US $ 180000/ Set US $ 85.05-94.50/ Piece US $ 10,000.00-50,000.00/ Piece
Min Order 1 Sets 1 Pieces 1 Sets 1 Pieces 1 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P, Western Union, Paypal L/C, T/T, Western Union, Paypal, Money Gram, Alipay L/C, T/T T/T, Western Union, Paypal, Money Gram T/T
Quality Control
Product Certification CE, ISO, SGS CE, ISO CE, ISO, RoHS CE, ISO, RoHS CE
Management System Certification ISO 9001 ISO 9001 ISO 9001, ISO 14001, OHSAS/ OHSMS 18001 ISO 9001, ISO 9000 ISO 9001
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea) Europe, Southeast Asia/ Mideast, Australia North America, South America, Europe Domestic
Annual Export Revenue - - > US $100 Million - -
Business Model Own Brand OEM - OEM, Own Brand OEM
Average Lead Time Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
- Off-season: 3-6 Month(s)
Peak-season: 6-12 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
After-sales Service: Whole Life;
Warranty: Whole Life;
Type: Coating Production Line;
Coating: Galvanized;
Substrate: Steel;
Condition: New;
Heating Method: Electric, Steam, Hot Water;
Operation Mode: Automatic, Semi Automatic, Manual;
Material of Kettle: Steel, Ceramic;
Material of Tank: PP, Moortone;
Installation: Concluded as Customer Required;
Application: Bridge and Highway, Industry, Construction,;
After-sales Service: Online;
Warranty: 18months Warranty;
Type: Coating Spray Gun;
Coating: Powder Coating;
Substrate: Steel;
Condition: New;
Part Name: W Replacement High Quality Pem X1 Manual Powder Co;
Code: 2322587;
Color: Yellow;
Use for: W All Series Powder Coating Models;
Nozzle Material Inside: PTFE;
Quality: as Original;
Detachable: Available;
Dismantling and Selling: Available;
High Voltage: Availablefor Original W Machine, 0-100kv;
Available Control Unit: Epg 2007 / Epg 2008 / Epg Sprint X;
Matched Powder: Epoxy Powder, Metal Powder, PTFE Powder;
Complete Machine: Available;
Customized: Available, 50sets;
Packing: Carton + Shock-Absorbing Cotton;
Delivery: 3-5days After Receiving The Payment;
After-sales Service: Installation and Training;
Warranty: 12monthes;
Type: Coating Production Line;
Coating: Powder Coating;
Substrate: Steel;
Condition: New;
Output Speed: 1-6m/Min;
Delivery Time: 40-60days;
After-sales Service: All The Time;
Warranty: 1 Year;
Type: Coating Spray Gun;
Coating: Powder Coating;
Substrate: Steel;
Condition: New;
Used on: GM03 Powder Spray Gun;
Lead Time: 1 Work Day;
Shipping: DHL/FedEx/EMS/UPS;
Stock: Yes;
After-sales Service: Yes;
Warranty: 1years;
Type: Coating Production Line;
Coating: Powder Coating;
Substrate: Steel;
Condition: New;
Working Type: Automatic;
Supplier Name

Hebei Annuo Automation Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Weifang Galin Powder Coating Equipment Co., Ltd.

China Supplier - Gold Member Audited Supplier

Qingdao Huashida Machinery Co., Ltd.

China Supplier - Gold Member Audited Supplier

Hangzhou Kafan Machinery & Equipment Co.,Ltd.

China Supplier - Gold Member Audited Supplier

Foshan Tuyi Electromechanical Equipment Co., Ltd.

China Supplier - Gold Member Audited Supplier