Specification |
After-sales Service: Yes;
Warranty: Yes;
Type: Seamless;
Technique: Cold Rolled;
Material: Stainless Steel;
Surface Treatment: Polished;
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose;
Section Shape: Round;
Name: Stainless Tube Tp321L S32205 Seamless Round Pipe;
Grade: TP304,TP304L,Tp304h,Tp321,Tp321h...;
Thickness: Seamless 0.5-50mm,Welded 0.15-25mm,Square 0.25-4mm;
Od: Seamless 4-914, Welded 6-630, Square 10-100mm;
Application: Pipeline Transport, Medical Equipment..;
Surface: Polished, Bare Black, Picked..;
Packing: Export Fine Packing, in Bunlde;
Loading Port: Tianjin;
Original: China;
Leat Time: About 10-20days;
Length: Random Length or as Client Requirements;
Pipe Type: Seamless, Welded, Square, Rec.;
MOQ: 3tons;
Service: Can Be Customized;
Sample: Ok;
|
Type: Welded;
Technique: Cold Rolled;
Material: Stainless Steel;
Usage: Pipeline Transport, Boiler Pipe;
Section Shape: Round;
Wt: Sch5-Xxs;
Outer Diameter: 6-219mm;
Length: 1-12m;
Standard or Not: Standard;
Secondary or Not: Non Secondary;
Alloy or Not: Non Alloy;
Price Term: Fob,CIF,CNF;
Payment: L/C,T/T;
MOQ: as Requested;
|
Type: Seamless;
Technique: Cold Drawn;
Material: Carbon Steel;
Surface Treatment: Oiled;
Usage: Machinery Industry, Chemical Industry;
Section Shape: Round;
Thickness: 1.5-10mm;
Length: 1-12m;
Delivery Detail: 15-30 Days After Down Payment;
Process: Cold Draw,Cold Rolled,etc.;
Alloy or Not: Non Alloy;
Standard or Not: Standard;
Secondary or Not: Non Secondary;
Price Term: Fob,CIF,CNF;
Payment: L/C,T/T;
|
Type: Welded;
Technique: ERW;
Material: Carbon Steel;
Surface Treatment: Galvanized;
Usage: Pipeline Transport, Machinery Industry, Chemical Industry, Construction & Decoration;
Section Shape: Round;
Thickness: 0.8 - 59mm;
Delivery Time: 15-30 Days After Down Payment;
Length: 1-12m;
Standard or Not: Standard;
Secondary or Not: Non-Secondary;
Alloy or Not: Non-Alloy;
Price Term: Fob/CIF/CNF;
Payment Term: L/C, T/T;
MOQ: as Requested;
|
Type: Seamless;
Technique: Hot Rolled;
Material: Carbon Steel;
Surface Treatment: 3PE/3PP;
Usage: Pipeline Transport, Boiler Pipe, Oil/Gas Drilling, Chemical Industry;
Section Shape: Round;
Wt: 1.73-50.01mm;
Length: 1-12m;
Process: Hot Rolled; Cold Drawing;etc.;
Delivery Time: 15-30 Days After Down Payment;
Secondary or Not: Non-Secondary;
Standard or Not: Standard;
Alloy or Not: Non-Alloy;
Payment: L/C, T/T;
Price Term: Fob, CIF.CNF;
|