Specification |
Application: Air Condition or Refrigerator, Water Tube, Water Heater;
Material: Brass;
Shape: Round;
Alloy: Alloy;
Standard: ASTM;
|
Type: Copper Plate;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Red Copper;
Shape: Plate;
Alloy: Non-alloy;
Color: Red;
Standard: GB/T;
Delivery Time: 7-15 Days;
Cross Sectional Area: Can Be Customized;
Customized: Avalible;
Length: Can Be Customized;
Origin Area: Qingdao, Shandong, China;
Core: Single Core;
|
Type: Copper Sheets;
Application: Air Condition or Refrigerator, Water Heater, Construction, Industry, Decorate, etc.;
Material: SGCC, Sgch, G550, Dx51d, Dx52D, Dx53D, etc.;
Shape: Plate;
Alloy: Non-alloy;
Color: Yellow;
Standard: ASTM;
Product Name: Copper Sheet/Plate;
Processing Service: Bending, Welding, Decoiling, Cutting, Punching;
Price Term: EXW, Fob, CFR, CIF, etc.;
Advantage: Stable Spec & Accurate Dimension;
Delivery Time: 7-15 Days;
Width: 1000-2000mm;
Cu (Min): 99%;
Alloy or Not: Non-Alloy;
Ultimate Strength (≥ MPa): 195;
Elongation (≥ %): 30;
Length: 1000-12000mm;
Package: Standard Seaworthy Package;
MOQ: 1 Ton;
Sample: Available;
Payment Term: 30%Advance T/T +70% Balance;
|
Type: Copper Sheets;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass;
Shape: Plate;
Alloy: Non-alloy;
Color: Purple;
Standard: ASTM;
Thickness: 0.1mm~200mm or Required;
Cu (Min): 99.9%;
Processing Service: Bending, Welding, Decoiling, Cutting, Punching;
Tolerance: 1%,2%,3%,Customize;
Special Application: Ships, Refrigerators, Molds, Aerospace Equipment;
Surface Technical: Corrugated/Perforated/Embossed/Water Ripple/Eched;
Model No.1: Tp1 Tp2 T2 Tu2 Tu1 C2800;
Temper: O-H112; T3-T8; T351-T851;
MOQ: 1 Ton;
|
Type: Copper Bars;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Red Copper;
Shape: Round;
Alloy: Non-alloy;
Color: Golden;
Standard: ASTM,DIN,En,GB,JIS;
Grade: T2,C1100,C11000,Cu-ETP;
Length: Less Than 8100mm;
Surface: Mill,Polished,Brushed,etc;
Manufacturing Process: Hot Rolled,Cold Rolled,Forged;
Lead Time: 3-5 Days for Stock, 30 Days for Customization;
Payment Term: T/T,D/P,L/C,etc;
Technology: Drawn,Extruded;
Trade Terms: Fob, EXW, CIF, CFR, etc;
MOQ: 5PC for Stock, 2 Tons for Order;
|