Specification |
Casting Method: Sand Casting;
Casting Form Material: Sand;
Casting Metal: Cast Iron;
Casting Form Usage Count: 100000;
Surface Treatment: Shot Blast, Polishing;
Surface Roughness: Ra3.2;
Coating: Primer Coating ,Finish Coating;
Machining Tolerance: +/-0.02mm;
Standard: ASTM;
Weight: 5- 200 Kg;
OEM: OEM Available;
Capacity: 1000 Pieces Per Month;
|
Casting Method: Iron Casting;
Casting Form Material: Ggg50, Option Ggg60, ASTM80-55-06;
Casting Metal: Cast Iron;
Casting Form Usage Count: Permanent;
Surface Treatment: Dacromat Coating, Finish Painting;
Surface Roughness: Ra25-100;
Coating: Zinc oxide;
Machining Tolerance: 0.005mm-0.01mm-0.1mm;
Standard: According to Customer Requirement;
Material: Ggg50, Option Ggg60, ASTM80-55-06;
Blank Process: Iron Casting;
Casting Tolerance: CT9-11;
Machining Process: Drilling, Milling, Boring etc.;
Rough Surface Roughness: Ra25-100;
Casting Blank Weight: Range From 0.01kg-1000kg;
Lead Time: 45 Days for Turbo Exhaust Manifold;
Service: OEM, ODM for Turbo Exhaust Manifold;
Casting Blank Size: as Customer Request;
Specfication: as Customer Drawings;
|
Casting Method: Iron Casting;
Casting Form Material: Ggg50, Option Ggg60, ASTM80-55-06;
Casting Metal: Cast Iron;
Casting Form Usage Count: Permanent;
Surface Treatment: Dacromat Coating, Finish Painting;
Surface Roughness: Ra25-100;
Coating: Zinc oxide;
Machining Tolerance: 0.005mm-0.01mm-0.1mm;
Standard: According to Customer Requirement;
Material: Ggg50, Option Ggg60, ASTM80-55-06;
Blank Process: Iron Casting;
Casting Tolerance: CT9-11;
Machining Process: Drilling, Milling, Boring etc.;
Rough Surface Roughness: Ra25-100;
Casting Blank Weight: Range From 0.01kg-1000kg;
Lead Time: 45 Days for Iron Casting Valve Cover;
Service: OEM, ODM for Iron Casting Valve Cover;
Casting Blank Size: as Customer Request;
Specfication: as Customer Drawings;
|
Casting Method: Iron Casting;
Casting Form Material: Ggg50, Option Ggg60, ASTM80-55-06;
Casting Metal: Cast Iron;
Casting Form Usage Count: Permanent;
Surface Treatment: Dacromat Coating, Finish Painting;
Surface Roughness: Ra25-100;
Coating: Zinc oxide;
Machining Tolerance: 0.005mm-0.01mm-0.1mm;
Standard: According to Customer Requirement;
Material: Ggg50, Option Ggg60, ASTM80-55-06;
Blank Process: Iron Casting;
Casting Tolerance: CT9-11;
Machining Process: Drilling, Milling, Boring etc.;
Rough Surface Roughness: Ra25-100;
Casting Blank Weight: Range From 0.01kg-1000kg;
Lead Time: 45 Days for Iron Casting Machining Parts;
Service: OEM, ODM for Iron Casting Machining Parts;
Casting Blank Size: as Customer Request;
Specfication: as Customer Drawings;
|
Casting Method: Iron Casting;
Casting Form Material: Ggg50, Option Ggg60, ASTM80-55-06;
Casting Metal: Cast Iron;
Casting Form Usage Count: Permanent;
Surface Treatment: Dacromat Coating, Finish Painting;
Surface Roughness: Ra25-100;
Coating: Zinc oxide;
Machining Tolerance: 0.005mm-0.01mm-0.1mm;
Standard: According to Customer Requirement;
Material: Ggg50, Option Ggg60, ASTM80-55-06;
Blank Process: Iron Casting;
Casting Tolerance: CT9-11;
Machining Process: Drilling, Milling, Boring etc.;
Rough Surface Roughness: Ra25-100;
Casting Blank Weight: Range From 0.01kg-1000kg;
Lead Time: 45 Days for Cast Iron Engine Part;
Service: OEM, ODM for Cast Iron Engine Part;
Casting Blank Size: as Customer Request;
Specfication: as Customer Drawings;
|