Specification |
Type: Copper Strips;
Application: Electronic Component;
Material: Red Copper;
Shape: Coil;
Alloy: Non-alloy;
Color: Red;
Standard: ASTMB;
Thickness: Customized;
Delivery Time: 5-10 Days;
MOQ: 100kg;
Payment Item: 30% Tt Deposit+70% Tt Balance;
Sample: Provide;
|
Type: Copper Strips;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass/Red Copper;
Shape: Coil;
Alloy: Non-alloy;
Color: Golden/Red;
Standard: GB/T;
Free Cutting: Yes;
Free Sample: Yes;
Processing Service: Bending, Welding, Decoiling, Cutting, Punching;
Delivery Time: 7-15 Working Days;
Surface: Mill,Polished,Bright,Oiled,Hair Line,Brush,Mirror;
Sample: Free Provided;
Hot Sale Country: Middle East ,Southeast Asia, South America ,Europ;
Cu (Min): 99.9%;
Surface Technics: Flat/Corrugated/Perforated/Embossed/Water Ripple;
|
Type: Brass Plate;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass;
Shape: Plate;
Alloy: Alloy;
Color: Yellow;
Standard: ASTM,DIN,En,GB,JIS;
Width: 200-3100mm;
Length: Less Than 8100mm;
Surface: Mill,Polished,Brushed,etc;
Manufacturing Process: Hot Rolled,Cold Rolled,Forged;
Lead Time: 3-5 Days for Stock, 30 Days for Customization;
Trade Terms: Fob, EXW, CIF, CFR, etc;
Payment Term: 30% in Advance. Balance Before Shipment;
MOQ: 5PC for Stock, 2 Tons for Order;
|
Type: Copper Pipe;
Application: Air Condition or Refrigerator;
Material: Red Copper;
Shape: Coil;
Alloy: Non-alloy;
Color: Red;
Standard: ASTM;
OEM: Accept;
MOQ: 300kg;
Sample: Available;
Price Term: Fob CIF CNF EXW;
|
Type: Brass Plate;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass;
Shape: Plate;
Alloy: Alloy;
Color: Yellow;
Standard: ASTM,DIN,En,GB,JIS;
Grade: C2680,C26800,H65;
Width: 200-3100mm;
Length: Less Than 8100mm;
Surface: Mill, Polished, Brushed, etc;
Manufacturing Process: Hot Rolled, Cold Rolled, Forged;
Lead Time: 3-5 Days for Stock, 30 Days for Customization;
Trade Terms: Fob, EXW, CIF, CFR, etc;
Payment Term: 30% in Advance. Balance Before Shipment;
MOQ: 5PC for Stock, 2 Tons for Order;
|