OEM Quality Injection Scooter Luggage Box Mould

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$10,000.00-15,000.00 / Piece

Sepcifications

  • Shaping Mode Injection Mould
  • Surface Finish Process Polishing
  • Mould Cavity Single Cavity
  • Plastic Material ABS
  • Process Combination Type Single-Process Mode
  • Application Motorcycle
  • Runner Cold or Hot
  • Design Software Ug,PRO-E,Solidwork
  • Installation Fixed
  • Certification CE, ISO
  • Standard Dme/Lkm/Hasco
  • Customized Customized
  • Transport Package Wooden Crate
  • Trademark JSLMOULD
  • Origin Huangyan, Taizhou, China
  • Mould Base S50c/C45
  • Mould Life 300,000-2000,000shots
  • Mould Surface Polish,Texture,Chromed
  • Heat Treatment Nitriding
  • Mould Operating Mode Automatically by CNC
  • Mould Quality Control Professional QC in House Machine
  • Mould Design Software Ug,Proe,CAD,Catia,Solidworks
  • Mach Equipment CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car
  • Provide 3D Printing, Moldflow Analysia, Dfm Report Service
  • Service OEM/ODM
  • Sample Avaliable
  • Design 7 Days
  • T1 Days 50-60days
  • After Sale Quality Guarantee 2 Year

Product Description

Scooter luggage box mould 1. Long life 2. Short delivery time 3. Best machining 4. Good after-service Provide mould core &cavity steel certificate Provide mould trial video and good after-service. Product Name Scooter luggage box mould Product material PP/ABS Core&Cavity Steel ...

Learn More

Scooter Luggage Box Mould Comparison
Transaction Info
Price US $ 10,000.00-15,000.00/ Piece US $ 15,000.00-25,000.00/ Set US $ 20,000.00-40,000.00/ Set US $ 28,000.00-30,000.00/ Set US $ 10,000.00-20,000.00/ Piece
Min Order 1 Pieces 1 Sets 1 Sets 1 Sets 1 Pieces
Trade Terms - FOB FOB FOB FOB
Payment Terms L/C, T/T L/C, T/T T/T, Western Union L/C, T/T, Western Union L/C, T/T
Quality Control
Product Certification CE, ISO ISO - ISO ISO
Management System Certification ISO 9000 ISO 9000 ISO 9000 ISO 9000 ISO 9000
Trade Capacity
Export Markets North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic
Annual Export Revenue - - - - -
Business Model - - - - -
Average Lead Time Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Motorcycle;
Runner: Cold or Hot;
Design Software: Ug,PRO-E,Solidwork;
Installation: Fixed;
Standard: Dme/Lkm/Hasco;
Customized: Customized;
Mould Base: S50c/C45;
Mould Life: 300,000-2000,000shots;
Mould Surface: Polish,Texture,Chromed;
Heat Treatment: Nitriding;
Mould Operating Mode: Automatically by CNC;
Mould Quality Control: Professional QC in House Machine;
Mould Design Software: Ug,Proe,CAD,Catia,Solidworks;
Mach Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car;
Provide: 3D Printing, Moldflow Analysia, Dfm Report Service;
Service: OEM/ODM;
Sample: Avaliable;
Design: 7 Days;
T1 Days: 50-60days;
After Sale Quality Guarantee: 2 Year;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PE;
Process Combination Type: Single-Process Mode;
Application: Home Use;
Runner: Hot Runner;
Design Software: Ug,PRO-E,Solidwork;
Installation: Fixed;
Standard: Dme/Hasco/Lkmect;
Customized: Customized;
Mould Base: S50c/C45;
Heat Treatment: Nitriding, etc;
Mould Quality Control: Professional QC in House Machine;
Mould Cooling System: by Experienced Designer;
Mould Operating Mode: Automatically by CNC;
Mould Design: 7days;
Mould Report: 7-10days Per Time;
T1 Sample: 50days;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PP;
Process Combination Type: Single-Process Mode;
Application: Commodity, Home Use;
Runner: Hot Runner;
Design Software: UG;
Installation: Mobile;
Standard: DME;
Customized: Customized;
Heat Treatment: Nitriding, etc;
Surface Finish: Polishing,Texture,Chorme Plating,Spray Painting;
Mould Quality Control: Professional QC in House;
Mould Runner System: for Cold or Hot Runner;
Shopping Basket Mould Standard: Dme, Hasco, Lkm, etc;
Mould Design Software: Ug, Proe, Solidworks CAD, Ect;
Mould Cooling System: by Experienced Designer;
Mould Operating Mode: Automatically by CNC;
Mould Base: S50c,Lkm,Dme,etc;
Time of Warranty: 1 Year;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PP;
Process Combination Type: Single-Process Mode;
Application: Furniture;
Runner: Hot Runner;
Design Software: UG;
Installation: Fixed;
Standard: DME;
Customized: Customized;
Part Name: Chair;
Mold Design: 7days;
T1 Sample Time: 60days;
M/C: 600t;
Mould Name: Rattan Chair Mould;
Mould Quality: in House Professional QC;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PP;
Process Combination Type: Single-Process Mode;
Application: Home Use;
Runner: Hot /Cold Runner;
Design Software: Ug,PRO-E,Solidwork Ect;
Installation: Fixed;
Standard: Dme/Hasco/Lkm Ect;
Customized: Customized;
Mould Base: S50c/C45;
Mould Standard: Professional QC in House Machine;
Machine Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car;
Mould Cooling System: by Experienced Designer;
Mould Operating Mode: Automatically by CNC;
Heat Treatment: Nitriding, etc;
Mould Design: 7days;
Mould Report: 7-10days Per Time;
T1 Sample: 50days;
Supplier Name

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier