OEM Custom Plastic Injection Splash Guard Mould

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

1 set US$15,000.00

2+ set US$30,000.00

Sepcifications

  • Shaping Mode Injection Mould
  • Surface Finish Process Polishing
  • Mould Cavity Single Cavity
  • Plastic Material ABS
  • Process Combination Type Single-Process Mode
  • Application Car
  • Runner Hot Runner
  • Design Software UG
  • Installation Fixed
  • Certification ISO
  • Standard DME
  • Customized Customized
  • Transport Package Wooden Crate
  • Specification Dme
  • Trademark JSLMOULD
  • Origin Taizhou, China
  • Mould Name Plastic Injection Splash Guard Mould
  • Mould Steel 718 (34-38HRC)
  • Mould Life More Than 500k Shots
  • Mould Design Software CAD,Ug,Solidworks

Product Description

Product Name OEM Cusotm plastic injection splash guard mould Product material ABS Core&Cavity Steel 718 Steel hardness: HRC34-38 Mould Standard DME Cavity Number single Injection System pin point gate Ejector System Ejector pin Cycle Time 30 second/shot Tooling lead time 60 days ...

Learn More

Plastic Splash Guard Mould Comparison
Transaction Info
Price US $ 15,000.00-30,000.00/ set US $ 10,000.00-20,000.00/ Piece US $ 10,000.00-20,000.00/ Piece US $ 10,000.00-20,000.00/ Piece US $ 10,000.00-20,000.00/ Piece
Min Order 1 set 1 Pieces 1 Pieces 1 Pieces 1 Pieces
Trade Terms FOB, CIF, EXW - - - -
Payment Terms L/C, T/T L/C, T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Product Certification ISO - ISO ISO ISO
Management System Certification ISO 9000 ISO 9000 ISO 9000 ISO 9000 ISO 9000
Trade Capacity
Export Markets North America, South America, Europe, Africa, Domestic, Others North America, South America, Europe, Africa, Domestic, Others North America, South America, Europe, Africa, Domestic, Others North America, South America, Europe, Africa, Domestic, Others North America, South America, Europe, Africa, Domestic, Others
Annual Export Revenue - - - - -
Business Model - - - - -
Average Lead Time Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Car;
Runner: Hot Runner;
Design Software: UG;
Installation: Fixed;
Standard: DME;
Customized: Customized;
Mould Name: Plastic Injection Splash Guard Mould;
Mould Steel: 718 (34-38HRC);
Mould Life: More Than 500k Shots;
Mould Design Software: CAD,Ug,Solidworks;
Mould Quality Control: Professional QC;
Heat Treatment: Nitriding;
Mould Base: S50c/C45;
Mould Runner System: Hot Runner or Cold;
Mould Design Software: Ug,Proe,CAD,Catia,Solidworks;
Mach Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car;
Mould Surface: Polish or Texture;
Design: Ready;
T1 Days: 45-50days;
Hot Sale: 10 Years Vendor of Honda , Bajaj , Hero ,Tvs ,Yama;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Two Wheeler;
Runner: Cold or Hot;
Design Software: UG;
Installation: Fixed;
Standard: DME;
Customized: Customized;
Mould Quality Control: Professional QC;
Heat Treatment: Nitriding;
Mould Base: S50c/C45;
Mould Runner System: Hot Runner or Cold;
Mould Design Software: Ug,Proe,CAD,Catia,Solidworks;
Mach Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car;
Mould Surface: Polish or Texture;
Design: Ready;
T1 Days: 45-50days;
Hot Sale: 10 Years Vendor of Honda , Bajaj , Hero ,Tvs ,Yama;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Two Wheeler;
Runner: Cold or Hot;
Design Software: UG;
Installation: Fixed;
Standard: DME;
Customized: Customized;
Mould Quality Control: Professional QC;
Heat Treatment: Nitriding;
Mould Base: S50c/C45;
Mould Runner System: Hot Runner or Cold;
Mould Design Software: Ug,Proe,CAD,Catia,Solidworks;
Mach Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car;
Mould Surface: Polish or Texture;
Design: Ready;
T1 Days: 45-50days;
Hot Sale: 10 Years Vendor of Honda , Bajaj , Hero ,Tvs ,Yama;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Two Wheeler;
Runner: Cold or Hot;
Design Software: UG;
Installation: Fixed;
Standard: DME;
Customized: Customized;
Mould Quality Control: Professional QC;
Heat Treatment: Nitriding;
Mould Base: S50c/C45;
Mould Runner System: Hot Runner or Cold;
Mould Design Software: Ug,Proe,CAD,Catia,Solidworks;
Mach Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car;
Mould Surface: Polish or Texture;
Design: Ready;
T1 Days: 45-50days;
Hot Sale: 10 Years Vendor of Honda , Bajaj , Hero ,Tvs ,Yama;
Supplier Name

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier