Motorcycle Tail Panel Mould
US$10,000.00-20,000.00 / Set
View
  • Recommend for you
  • What is Custom Made Injection Mold for Plastic High Sided Corner Cat Litter Box
  • What is New Design Injection Plastic Handheld Welding Helmet Mold
  • What is Injection Square Plastic Bucket Mould

What is Plastic Motorcycle Bike Tail Light Panel Mould

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Set US$10,000.00-20,000.00 / Set

Sepcifications

  • Shaping Mode Injection Mould
  • Surface Finish Process Polishing
  • Mould Cavity Single Cavity
  • Plastic Material ABS
  • Process Combination Type Single-Process Mode
  • Application Motorcyle
  • Runner Hot Runner
  • Design Software Ug,Proe,CAD,Catia,Solidworks
  • Installation Fixed
  • Certification ISO
  • Standard DME
  • Customized Customized
  • Transport Package Wooden Case
  • Specification Dme
  • Trademark JSLMOULD
  • Origin China
  • Machine Equipment CNC,EDM,Wire Cutting Machine,Drilling Machine
  • Heat Treatment Nitriding
  • Mould Running Full Automaticity
  • Design Time 5days
  • Time of Warranty 1 Year
  • Quality Control Professional QC in House
  • Surface Finish Polishing,Texture,Chorme Plating,Spray Painting
  • Motorcycle Tail Panel Mould Motorcycle Tail Panel Mold

Product Description

Product Name:Plastic Motorcycle Bike tail light panel mould Product material ABS Core&Cavity Steel 718 Steel hardness: HRC34-38 Mould Standard DME Cavity Number SINGLE Injection System SIDE GATE Ejector System EJECTOR PIN Cycle Time 35S Tooling lead time 50DAYS Mould life More than 500, ...

Learn More

Motorcycle Tail Panel Mould Comparison
Transaction Info
Price US $ 10,000.00-20,000.00/ Set US $ 10,000.00-20,000.00/ Set US $ 20,000.00-40,000.00/ Set US $ 20,000.00-23,000.00/ Set US $ 35,000.00-40,000.00/ Set
Min Order 1 Sets 1 Sets 1 Sets 1 Sets 1 Sets
Trade Terms - FOB FOB FOB FOB
Payment Terms L/C, T/T, Western Union, Money Gram L/C, T/T, Western Union L/C, T/T, Western Union, Money Gram L/C, T/T, Western Union, Money Gram L/C, T/T, Western Union, Money Gram
Quality Control
Product Certification ISO ISO ISO ISO -
Management System Certification ISO 9000 ISO 9000 ISO 9000 ISO 9000 ISO 9000
Trade Capacity
Export Markets North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic
Annual Export Revenue - - - - -
Business Model - - - - -
Average Lead Time Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Motorcyle;
Runner: Hot Runner;
Design Software: Ug,Proe,CAD,Catia,Solidworks;
Installation: Fixed;
Standard: DME;
Customized: Customized;
Machine Equipment: CNC,EDM,Wire Cutting Machine,Drilling Machine;
Heat Treatment: Nitriding;
Mould Running: Full Automaticity;
Design Time: 5days;
Time of Warranty: 1 Year;
Quality Control: Professional QC in House;
Surface Finish: Polishing,Texture,Chorme Plating,Spray Painting;
Motorcycle Tail Panel Mould: Motorcycle Tail Panel Mold;
Warranty: 1 Year;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: HDPE;
Process Combination Type: Single-Process Mode;
Application: Home Use;
Runner: Hot Runner;
Design Software: UG;
Installation: Fixed;
Standard: DME;
Customized: Customized;
After-sales Service: 2 Years;
Part Name: 5 Gallon Box;
Mold Design: 7day;
T1 Sample Time: 60days;
M/C: 650t;
Time of Warranty: 1 Year;
Surface Finish: Polishing,Texture,Chorme Plating,Spray Painting;
Machine Equipment in House: CNC,EDM,Wire Cutting Machine,Drilling Machine,Inje;
Plastic Solid Crate Mold: Plastic Solid Crate Mould;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PP;
Process Combination Type: Single-Process Mode;
Application: Home Use;
Runner: Cold Runner, Hot Runner- Yudo;
Design Software: UG;
Installation: Fixed;
Standard: DME;
Customized: Customized;
Part Name: 5 Gallon Box;
Mold Design: 7day;
T1 Sample Time: 60days;
M/C: 650t;
Machine Equipment in House: CNC,EDM,Wire Cutting Machine,Drilling Machine,Inje;
Time of Warranty: 1 Year;
Quality Control: Professional QC in House;
Surface Finish: Polishing,Texture,Chorme Plating,Spray Painting;
Warranty: 1 Year;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PC;
Process Combination Type: Single-Process Mode;
Application: Household Appliances;
Runner: Hot Runner;
Design Software: AutoCAD;
Installation: Fixed;
Standard: DME;
Customized: Customized;
After-sales Service: 3 Years;
Refrigerator Drawer Mould: Plastic Drawer Mould;
Mold Design: 7days;
T1 Sample Time: 60days;
Time of Warranty: 1 Year;
Surface Finish: Polishing,Texture,Chorme Plating,Spray Painting;
Quality Control: Professional QC in House;
Warranty: 2 Years;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PC;
Process Combination Type: Single-Process Mode;
Application: Household Appliances, Home Use;
Runner: Hot Runner;
Design Software: UG;
Installation: Fixed;
Standard: DME;
Customized: Customized;
After-sales Service: 3 Years;
Refrigerator Drawer Mould: Plastic Drawer Mould;
Mold Design: Ug,PRO-E,Solidwork;
T1 Sample Time: 60days;
Heat Treatment: Nitriding;
Mould Base: S50c,Lkm,Dme,etc;
Runner System: Hot Runner or Cold;
Time of Warranty: 1 Year;
Supplier Name

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier