Ductile Iron 4 Inch 300 Psi 45 90 Degree Grooved Fittings Elbow

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

5 Pieces US$0.50-50.00 / Piece

Sepcifications

  • Certification CE, FM
  • Surface Treatment Red,Blue Painting,etc
  • Material Iron Steel
  • Transport Package in Wooden Case or Pallet
  • Specification 1/2"-12"
  • Trademark Kingmetal
  • Origin China
  • Delivery Time 15-30 Days After Dowm Payment
  • Gasket Edmp
  • Range Coupling,Flange,Elbow,Tee,Reducer,Cap,etc
  • Standard or Not Standard
  • Allouy or Not Non Alloy
  • Secondary or Not Non Secondary
  • Price Term Fob,CIF,CNF
  • Payment L/C,T/T
  • MOQ as Requested
  • Surface Blue or Red Painting,etc

Product Description

Material: QT450-12, ASTM A536, GRADE 65-45-12 ,etc. Standard: ASME, ANSI, DIN, JIS, ASTM, UNI, BS ,etc. Pressure: 300PSI, 500PSI, 750PSI, 1000PSI. Surface treatment: red painted, orange painted, galvanized, red spraied, orange spraied, dacromet, epoxy powder, epoxy, electroplate, ...

Learn More

45 Degree Grooved Elbow Comparison
Transaction Info
Price US $ 0.50-50.00/ Piece US $ 0.50-50.00/ Piece US $ 0.50-50.00/ Piece US $ 0.50-50.00/ Piece US $ 0.50-50.00/ Piece
Min Order 5 Pieces 100 Pieces 5 Pieces 10 Pieces 1 Pieces
Trade Terms FOB, CFR, CIF, CIP, CPT, FCA, EXW FOB, CFR, CIF, CIP, CPT, FCA, EXW FOB, CFR, CIF, CIP, CPT, FCA, EXW FOB, CFR, CIF, CIP, CPT, FCA, EXW FOB, CFR, CIF, CIP, CPT, FCA, EXW
Payment Terms L/C, T/T L/C, T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Product Certification null, CE, FM null, CE null, CE null, CE null, CE
Management System Certification ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model OEM, Own Brand OEM, Own Brand OEM, Own Brand OEM, Own Brand OEM, Own Brand
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
Surface Treatment: Red,Blue Painting,etc;
Material: Iron Steel;
Delivery Time: 15-30 Days After Dowm Payment;
Gasket: Edmp;
Range: Coupling,Flange,Elbow,Tee,Reducer,Cap,etc;
Standard or Not: Standard;
Allouy or Not: Non Alloy;
Secondary or Not: Non Secondary;
Price Term: Fob,CIF,CNF;
Payment: L/C,T/T;
MOQ: as Requested;
Surface: Blue or Red Painting,etc;
Surface Treatment: Red,Blue Painting,etc;
Material: Iron;
Delivery Time: 15-30 Days After Dowm Payment;
Pressure: 300psi;
Techinic: Casting;
Gasket: EPDM;
Alloy or Not: Non Alloy;
Secondary or Not: Non Secondary;
Brand: Kingmetal;
Payment: L/C,T/T;
Price Term: Fob,CIF,CNF;
Size: 1"-12";
Surface Treatment: Red,Blue Painting,etc;
Material: Iron Steel;
Delivery Time: 15-30 Days After Dowm Payment;
Range: Elbow,Reducer,Coupling,Flange,Tee,Reducer,Cross...;
Surface: Yellow,Red,Blue,etc;
Standard or Not: Standard;
Alloy or Not: Non Alloy;
Secondary or Not: Non Secondary;
Price Term: Fob,CIF,CNF;
Payment: L/C,T/T;
MOQ: as Requested;
Surface Treatment: Red,Blue Painting,etc;
Material: Iron Steel;
Delivery Time: 15-30 Days After Dowm Payment;
Pressure: 300psi;
Techinic: Casting;
Gasket: EPDM;
Finish: Paint, Epoxy or Galvanization;
Standard or Not: Standard;
Secondary or Not: Non Secondary;
Payment: L/C,T/T;
Price Term: Fob,CIF,CNF;
MOQ: as Requested;
Surface Treatment: Red,Blue Painting,etc;
Material: Iron Steel;
Delivery Time: 15-30 Days After Dowm Payment;
Range: Elbow,Coupling,Tee,Reducer,Cap,Cross,etc;
Surface: Yellow,Red,Blue Painting,etc.;
Standard or Not: Standard;
Alloy or Not: Not Alloy;
Secondary or Not: Non Secondary;
Price Term: Fob,CIF,CNF;
Paymentq: L/C,T/T;
MOQ: as Requested;
Pressure: 300psi;
Supplier Name

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier