Specification |
Standard: ANSI, DIN, GB, JIS, GOST;
Type: Plate Type Flange;
Material: Cast Steel;
Structure: Flanges;
Connection: Welding;
Sealing Surface: RF;
Manufacturing Way: Forging;
Flange: Pl, Wn, So, Th, Sw, Lj, Bl, etc.;
Delivery Time: 15-30 Days After Down Payment;
Surface: Black Painting, Yellow Painting and Anti Oil etc.;
Certifications: ISO, TUV, Ad;
Face: RF, Mfm, Tg, Rj, FF, etc.;
Second or Nonsecond: Non Secondary;
Standard or Nonstandard: Standard;
|
Standard: DIN, JIS, DIN2631/2632/2633/2634/2635;
Type: Threaded Connection Flange;
Material: Carbon Steel;
Structure: Round;
Connection: Welding;
Sealing Surface: RF FM Mfm Tg FF Rj;
Manufacturing Way: Forging;
Dn: 1/2"-72";
Name: Carbon Forged Flange;
Delivery Time: 30day;
Psyment Term: Tt/LC;
Brand: Kingmetal;
Surface: RF;
Product Name: Stainless Steel Welded Neck Flange;
|
Standard: ANSI, DIN, GB, JIS, GOST, BSW;
Type: Welding Flange;
Material: Stainless Steel;
Structure: Flanges;
Connection: Welding;
Sealing Surface: RF;
Manufacturing Way: Forging;
Delivery Time: 15-30 Days After Down Payment;
Size: 1/2' ~ 6';
Standard or Not: Standard;
Alloy or Not: Non Alloy;
Secondary Ort Not: Non Secondary;
Price Term: Fob, CIF, CNF;
Payment: L/C, T/T;
MOQ: as Requested;
|
Standard: ANSI, DIN, GB, JIS, GOST;
Type: Welding Flange;
Material: Carbon Steel;
Structure: Flanges;
Connection: Clamps;
Sealing Surface: RF;
Manufacturing Way: Forging;
Size: 1/2" ~ 64"(Dn15 mm ~ 1600 mm);
Materials: Stainless Steel,Carbon Steel,Grey Iron,Ductile Iro;
Delivery Time: 30 Days Ex Mill;
Loading Port: Chinese Main Port;
Printing: Yellow Print, Black Print, Oil or Zin.;
Pressure Ratings: Class 150, 300, 600, 900, 1500 and 2500;
Standards: ASTM A182, A105, ANSI B16.5, B16.47, B16.48;
Flange Type: Slip-on, Welding Neck, Blind, Socket Welding;
|
Standard: ANSI, DIN, GB, JIS;
Type: Welding Flange;
Material: Ductile Iron;
Structure: Flanges;
Connection: Flanged;
Sealing Surface: RF;
Manufacturing Way: Casting;
Size: Dn50-300;
Pressure: 300psi, 500psi, 750psi, 1000psi.;
Gasket: Rubber Gasket:1g,1GS,1X,1n,1zn;
Delivery Time: 15days After 30% Deposit;
Loading Port: Chinese Main Port;
MOQ: 100 PCS;
|