Specification |
After-sales Service: Change/Return;
Warranty: 1 Year;
Type: Seamless;
Technique: Hot Rolled;
Material: Alloy Steel;
Surface Treatment: Black;
Usage: Pipeline Transport;
Section Shape: Round;
W.T: 0.5-20mm;
Length: 5.8/6/11.8/5-7m;
Surface: Black/Varnish on Request;
Quality Guarantee: 100% Ut Passed;
|
Type: Seamless;
Technique: Cold Rolled;
Material: Carbon Steel;
Surface Treatment: Oiled;
Usage: Hydraulic/Automobile Pipe, Machinery Industry, Construction & Decoration, Special Purpose;
Section Shape: Round;
Size: 1/2''-24'';
Thickness: +/-0.05mm;
Delivery Time: 20-30days;
Alloy or Not: Non-Alloy;
Length: 3m,5.8 M, 6m, ..;
Finish Condition: Bk,Bkw,Bks,Gbk,Nbk;
Surface: in Oil;
|
Type: Welded;
Technique: ERW;
Material: Stainless Steel;
Surface Treatment: Polished;
Usage: Food/Beverage/Dairy Products, Construction & Decoration, Special Purpose;
Section Shape: Rectangular;
Od: 10*20mm-400*200mm;
Wt: 0.5-25mm;
Materials: 201, 202, 301, 304, 304L, 316, 316L, 321.;
Product Standards: ASTM A554;
Package: Plastic Nylon, Film, Wooden Box, etc;
Surface: Grit Polish, Mirror, Dull Finish, Hair Line, No. 1;
|
Type: Seamless;
Technique: Cold Drawn;
Material: Stainless Steel;
Surface Treatment: No Surface Treatment;
Usage: Pipeline Transport, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Construction & Decoration, Special Purpose;
Section Shape: Round;
Size: Od: From 6mm to 1000mm (Nps From 1/8'' to 40'');
Delivery Time: 20-35 Dys Ex Mill;
Produce Process: Pilgering and Cold Drawn;
Surface Process: Ap Tube/ Bp Tube;
Marking: Grade, Seamless, Standard, Size, Ht No.;
Sample: Can Provide;
Loading Port: Shang Hai;
OEM Accepted: Yes;
Third Party Ertificate: BV, Lr, SGS, TUV, CCS, ABS, etc.;
Package: Bundles with Waterproof Cloth Outside.;
|
Type: Seamless/Welded;
Technique: Hot Rolled;
Material: Carbon Steel;
Surface Treatment: Black;
Usage: Pipeline Transport, Machinery Industry, Mining, Construction & Decoration, Special Purpose;
Section Shape: Round;
Od: 1/2''-30'';
Wt: 1.2 - 20mm;
Length: 1-12 Meter;
Price Term: Fob/CIF Destination Port;
Payment: T/T, L/C;
Sample: Can Be Provided;
Loading Port: Chinese Main Port;
Delivery Time: 30 Days Ex Mill;
|