Specification |
Connection: Threaded,Screwed;
Structure: Male/Female Thread;
Material: Wrought Steel;
Standard: Standard;
Time of Delivery: 7 - 30 Days;
|
After-sales Service: Ten-Years Quality Guarantee;
Warranty: Ten-Years Quality Guarantee;
Connection: Split Ring Hanger;
Structure: Control;
Flexible or Rigid: Rigid;
Material: Alloy;
Standard: Standard;
Product Name: Quick Change Pipe Coupling;
Vacuum Degree: 98.8%;
Working Pressure: 13bar(-40~+80ºC), 16bar(-20~+60ºC);
Working Temperature: -40ºC~ +80ºC;
Customization: Available;
Colors: Multi-Color Available for Your Choice;
Transmission Medium: Compressed Air, Vacuum, Inert Gas, More Contact Us;
|
After-sales Service: Legal Aid, Warranty, Return, Compensation;
Warranty: 25years;
Connection: Threaded;
Structure: Control;
Flexible or Rigid: Rigid;
Material: Brass;
Standard: SAE J512, ASME;
Surface: Polished, Blackening, Cleaned, Sandblasting;
Alloy Number: C46500, Dzr, C37700, Cg, C36000;
Thread Type: G,Zg, M, NPT,Un;
Application: Refrigeration and Air Conditioning;
Trade Mark: ODM,OEM;
Price Composition: Lme Cu + Lme Zn + Fabrication Cost;
Production: Casting;
Lead Time: 30~45 Days;
|
After-sales Service: Legal Aid, Warranty, Return, Compensation;
Warranty: 25years;
Connection: Threaded;
Structure: Control;
Flexible or Rigid: Rigid;
Material: Brass;
Standard: SAE J512, ASME;
Surface: Polished, Blackening, Cleaned, Sandblasting;
Alloy Number: C46500, Dzr, C37700, Cg, C36000;
Thread Type: G,Zg, M, NPT,Un;
Application: Refrigeration and Air Conditioning;
Trade Mark: ODM,OEM;
Price Composition: Lme Cu + Lme Zn + Fabrication Cost;
Production: Casting;
Lead Time: 30~45 Days;
|
After-sales Service: Legal Aid, Warranty, Return, Compensation;
Warranty: 25years;
Connection: Threaded;
Structure: Control;
Flexible or Rigid: Rigid;
Material: Brass;
Standard: SAE J512, ASME;
Surface: Polished, Blackening, Cleaned, Sandblasting;
Alloy Number: C46500, Dzr, C37700, Cg, C36000;
Application: Refrigeration and Air Conditioning;
Trade Mark: ODM,OEM;
Price Composition: Lme Cu + Lme Zn + Fabrication Cost;
Production: Casting;
Lead Time: 30~45 Days;
|