Liner 6 Kit
US$3.00-5.00 / Set
View
  • Recommend for you
  • What is Zs1115 Single Cylinder Water-Cooled Diesel Engine
  • What is 6HP 8HP 10HP 12HP 14HP 16HP 18HP 20HP 22HP 24HP Diesel Engine Weifang Ym 490 Zs1110 Diesel Engine Part Spare Partsreference Fob Price
  • What is Zh1130 Horizontal 4 Cycle Small Diesel Engine

What is Diesel Engine S1115 Spare Parts Cylinder Liner 6 Kit

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

4 Sets US$3.00-5.00 / Set

Sepcifications

  • Certification CCC, ISO9001, CE, Cast Iron
  • Standard Component Standard Component
  • Technics Forging
  • Material Iron
  • Type Cylinder
  • Transport Package Box
  • Specification cast iron
  • Origin Hebei

Product Description

Quick navigation of single cylinder parts 1.cylinder block parts &assembly 8.air intake system 2.side cover / gear casing assembly 9.air exhaus system 3.cylinder head assembly 10.fuel supply system 4.piston and connecting rod assembly 11.governor system 5.water tank / hopper assembly ...

Learn More

Liner 6 Kit Comparison
Transaction Info
Price US $ 3.00-5.00/ Set Negotiable US $ 36.00-37.00/ Piece US $ 5.20-5.30/ Piece US $ 4.20-4.70/ Piece
Min Order 4 Sets 1 Pieces 1 Pieces 1 Pieces 1 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P, Western Union L/C, T/T, Western Union, Paypal L/C, T/T, Western Union, Paypal T/T, Western Union, Paypal L/C, T/T, Western Union, Paypal
Quality Control
Product Certification CCC, ISO9001, CE, Cast Iron - - - -
Management System Certification ISO 9001 ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets North America, South America, Eastern Europe, Africa, Western Europe North America, South America, Europe, Southeast Asia/ Mideast, Africa, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, Domestic
Annual Export Revenue - - - - -
Business Model OEM, Own Brand OEM, Own Brand OEM, Own Brand OEM, Own Brand OEM, Own Brand
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
Standard Component: Standard Component;
Technics: Forging;
Material: Iron;
Type: Cylinder;
Type: Air Cooler;
Type: Fuel Pump;
Standard Component: Standard Component;
Technics: Casting;
Material: Aluminum Alloy;
Type: Filter;
Type: Bush;
Supplier Name

Landsem Baoding import and export Trading CO., LTD.

China Supplier - Gold Member Audited Supplier

Zhongshan Chuangyuan Power Equipment Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Zhongshan Chuangyuan Power Equipment Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Zhongshan Chuangyuan Power Equipment Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Zhongshan Chuangyuan Power Equipment Co., Ltd.

China Supplier - Diamond Member Audited Supplier