Specification |
Type: Copper Strips;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Beryllium Copper;
Shape: Coil;
Alloy: Alloy;
Color: Golden;
Standard: ASTM;
|
Type: Copper Sheets;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass;
Shape: Plate;
Alloy: Non-alloy;
Color: Purple;
Standard: ASTM;
Thickness: 0.1mm~200mm or Required;
Cu (Min): 99.9%;
Processing Service: Bending, Welding, Decoiling, Cutting, Punching;
Tolerance: 1%,2%,3%,Customize;
Special Application: Ships, Refrigerators, Molds, Aerospace Equipment;
Surface Technical: Corrugated/Perforated/Embossed/Water Ripple/Eched;
Model No.1: Tp1 Tp2 T2 Tu2 Tu1 C2800;
Temper: O-H112; T3-T8; T351-T851;
MOQ: 1 Ton;
|
Type: Brass Wire;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass;
Shape: Coil;
Alloy: Alloy;
Color: Yellow;
Standard: ASTM, DIN, En, GB, JIS;
Grade: H62, H65, H68;
Width: 1-1500mm;
Length: Coil;
Surface: Mill, Polished, Brushed, etc;
Lead Time: 3-5 Days for Stock, 30 Days for Customization;
Payment Term: T/T, D/P, L/C, etc;
Trade Terms: Fob, EXW, CIF, CFR, etc;
MOQ: 5PC for Stock, 2 Tons for Order;
|
Thickness: 0.1mm~200mm or Required;
Cu (Min): 99.9%;
Processing Service: Bending, Welding, Decoiling, Cutting, Punching;
Tolerance: 1%,2%,3%,Customize;
Special Application: Ships, Refrigerators, Molds, Aerospace Equipment;
Surface Technical: Corrugated/Perforated/Embossed/Water Ripple/Eched;
Model No.1: Tp1 Tp2 T2 Tu2 Tu1 C2800;
Temper: O-H112; T3-T8; T351-T851;
MOQ: 1 Ton;
|
Type: Brass Plate;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass;
Shape: Plate;
Alloy: Alloy;
Color: Yellow;
Standard: ASTM,DIN,En,GB,JIS;
Width: 200-3100mm;
Length: Less Than 8100mm;
Surface: Mill,Polished,Brushed,etc;
Manufacturing Process: Hot Rolled,Cold Rolled,Forged;
Lead Time: 3-5 Days for Stock, 30 Days for Customization;
Trade Terms: Fob, EXW, CIF, CFR, etc;
Payment Term: 30% in Advance. Balance Before Shipment;
MOQ: 5PC for Stock, 2 Tons for Order;
|