Specification |
Warranty: 2 Years;
Shaping Mode: Blowing Mould;
Surface Finish Process: Sand Blasting;
Mould Cavity: Multi Cavity;
Plastic Material: HDPE;
Process Combination Type: Progressive Die;
Application: Car, Household Appliances, Commodity, Electronic, Home Use;
Runner: Blow Moulded;
Design Software: UG;
Installation: Fixed;
Standard: DME;
Customized: Customized;
After-sales Service: Lifespan Technical Support;
Material Option: P20 Steel, Aluminum 6061, Aluminum 7075;
Deflashing: Available;
Volume Range: 10ml-200L;
Extra Service: Could Do New Design for Customer;
Neck Portion Design: Inserted Type, 2 Sides Could Be Exchange Use;
Delivery Time: 40-45 Working Day;
Assembling: Neck and Bottom Portion Are Removable;
Mold Material: P20 Steel, S136 Stainless Steel, Al7075;
Mold Testing: Yes;
|
Warranty: 24hrs Online Service;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware;
Runner: Cold Runner;
Design Software: UG;
Installation: Fixed;
Standard: PUNCH;
Customized: Customized;
After-sales Service: 24hrs Online Service;
Product Name: Plastic Crate Toolings;
Product Material: ABS, PVC, PC, PMMA, PE, POM, PA, TPU, etc.;
Sample Confirm: We Will Send The Trial Samples to Customers Before;
Quotation: According to Samples, Drawing and Specific Require;
Gate Type: Pin Point Gate, Edge Gate, Side Gate, Sub Gate;
Mould Material: P20/718/738/Nak80/S136;
Main Thechnology: Milling, Grinding, CNC, EDM, Wire Cutting, etc;
Weekly Report: We Will Update The Mold Schedule Every Week;
Sofeware: CAD, PRO-E, Ug, Rhinoceros etc.;
Lead Time of First Samples: Around 4~7weeks;
|
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Multi Cavity;
Plastic Material: Various Plastics Like ABS,PP,PA;
Process Combination Type: Single-Process Mode;
Application: Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware;
Runner: Hot Runner/Cold Runner;
Design Software: CAD/Proe/Ug/Solidworks;
Installation: Fixed;
Customized: Customized;
Surface Treatment: Polishing, Texture, Paning...;
Lead Time: 20-25 Working Days;
Mould Life: 300000-500000 Shots;
Mould Base: Lkm.Hasco;
Moud Precision: +/-0.01mm;
Brand Name: Dtm;
Drawing Format: Step/STP/Igs/X-T/Stl;
Packing: Wooden Box;
Size: Customer Size Accepted;
Design Service: Available;
Colors Available: Pantone/Ral and Other Custom Colors;
|
Warranty: 2 Years;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware;
Runner: Cold Runner;
Design Software: UG;
Installation: Fixed;
Standard: PUNCH;
Customized: Customized;
After-sales Service: 24hrs Online Service;
Product Name: Plastic Crate Mold;
Product Material: ABS, PVC, PC, PMMA, PE, POM, PA, TPU, etc.;
Sample Confirm: We Will Send The Trial Samples to Customers Before;
Quotation: According to Samples, Drawing and Specific Require;
Gate Type: Pin Point Gate, Edge Gate, Side Gate, Sub Gate;
Mould Material: P20/718/738/Nak80/S136;
Main Thechnology: Milling, Grinding, CNC, EDM, Wire Cutting, etc;
Weekly Report: We Will Update The Mold Schedule Every Week;
Sofeware: CAD, PRO-E, Ug, Rhinoceros etc.;
Lead Time of First Samples: Around 4~7weeks;
|
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware;
Runner: Cold Runner;
Design Software: UG;
Installation: Fixed;
Standard: PUNCH;
Customized: Customized;
Product Name: Storage Crates Moulds, Egg Crate Mould;
Product Material: HDPE;
Cavity: Single Cavity;
Mould Base: C45, P20;
Mould Life: 250000-300000shots;
Runner System: Cold Runner or Hot Runner;
Sofeware: CAD, PRO-E, Ug, Rhinoceros etc.;
Lead Time of First Samples: Around 4~7weeks;
|